Multi-objective green scheduling of integrated flexible job shop and automated guided vehicles

被引:17
|
作者
Xu, Gongjie [1 ]
Bao, Qiang [2 ]
Zhang, Hongliang [2 ,3 ]
机构
[1] Northwestern Polytech Univ, Sch Mech Engn, Dept Ind Engn, Xian 710072, Shaanxi, Peoples R China
[2] Anhui Univ Technol, Sch Management Sci & Engn, Maanshan 243032, Peoples R China
[3] Educ Dept Anhui Prov, Key Lab Multidisciplinary Management & Control Com, Maanshan 243002, Peoples R China
关键词
Flexible job shop; Automated guided vehicles; Total energy consumption; Makespan; Efficient heuristic algorithm; GENETIC ALGORITHM; OPTIMIZATION ALGORITHM; ENERGY-CONSUMPTION; MODELS;
D O I
10.1016/j.engappai.2023.106864
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
The traditional flexible job shop scheduling problem (FJSP) ignores transportation issues or merely introduces a time lag for transportation tasks while assuming an infinite number of transportation resources. With the development of intelligent manufacturing, automated guided vehicles (AGVs), which are the key transportation equipment for manufacturing enterprises, have been widely used for their high flexibility and stability. In addition, the increase in energy consumption and the trend of green manufacturing make it critical to take into account energy-related objectives in the decision-making of scheduling. Therefore, the multi-objective green scheduling problem of integrated flexible job shop and AGVs (MOGSP-IFJS & AGVs) is addressed in this paper. To solve this problem effectively, the multi-objective mixed-integer programming (MMIP) model is formulated to minimize total energy consumption and makespan simultaneously. An efficient heuristic algorithm (EHA) is designed to solve the MMIP model. In the EHA, one solution encoding scheme and corresponding greedy insertion decoding method considering the selection of AGVs are presented. To acquire a high-quality initial population, the population initialization method balancing the processing time and energy consumption is designed. Further, a local search strategy is presented to enhance the quality of solutions and accelerate the convergence speed of the EHA. Experiment results of 45 test instances indicate that the EHA can obtain better solutions than that of comparison algorithms, which confirms the effectiveness of the EHA for solving the MOGSP-IFJS & AGVs.
引用
收藏
页数:14
相关论文
共 50 条
  • [1] Multi-population coevolutionary algorithm for a green multi-objective flexible job shop scheduling problem with automated guided vehicles and variable processing speed constraints
    Liu, Chao
    Han, Yuyan
    Wang, Yuting
    Li, Junqing
    Liu, Yiping
    SWARM AND EVOLUTIONARY COMPUTATION, 2024, 91
  • [2] Approach for Multi-objective Flexible Job shop scheduling
    Hui, Hongjie
    AUTOMATIC MANUFACTURING SYSTEMS II, PTS 1 AND 2, 2012, 542-543 : 407 - 410
  • [3] Dynamic scheduling on multi-objective flexible Job Shop
    Liu, Ai-Jun
    Yang, Yu
    Xing, Qing-Song
    Lu, Hui
    Zhang, Yu-Dong
    Zhou, Zhen-Yu
    Wu, Guang-Hui
    Zhao, Xiao-Hua
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2011, 17 (12): : 2629 - 2637
  • [4] Simulation Optimization of Multi-objective Flexible Job Shop Scheduling
    Wang Guicong
    Li Chuanpeng
    Cui Huanyong
    MACHINE DESIGN AND MANUFACTURING ENGINEERING II, PTS 1 AND 2, 2013, 365-366 : 602 - 605
  • [5] Multi-objective flexible job shop scheduling of batch production
    School of Mechatronic Engineering, Jinling Institute of Technology, Nanjing 210001, China
    不详
    Jixie Gongcheng Xuebao/Chinese Journal of Mechanical Engineering, 2007, 43 (08): : 148 - 154
  • [6] Integrated multi-objective process planning and flexible job shop scheduling considering precedence constraints
    Shokouhi, Elahe
    PRODUCTION AND MANUFACTURING RESEARCH-AN OPEN ACCESS JOURNAL, 2018, 6 (01): : 61 - 89
  • [7] A benchmark dataset for multi-objective flexible job shop cell scheduling
    Deliktas, Derya
    Ozcan, Ender
    Ustun, Ozden
    Torkul, Orhan
    DATA IN BRIEF, 2024, 52
  • [8] MULTI-OBJECTIVE FLEXIBLE JOB SHOP SCHEDULING PROBLEM WITH CARBON EMISSIONS
    Zhang, Guo-Hui
    Dang, Shi-Jie
    Deng, Xiang
    ENERGY AND MECHANICAL ENGINEERING, 2016, : 946 - 952
  • [9] Multi-objective flexible job shop scheduling problem with key objectives
    Guo, Chengzhi
    Li, Ming
    Lei, Deming
    2019 34RD YOUTH ACADEMIC ANNUAL CONFERENCE OF CHINESE ASSOCIATION OF AUTOMATION (YAC), 2019, : 23 - 27
  • [10] Disruption management of multi-objective flexible job shop scheduling problem
    Sun, Jinghua
    Xu, Li
    Academic Journal of Manufacturing Engineering, 2019, 17 (03): : 50 - 56