Simulation-Based Headway Optimization for the Bangkok Airport Railway System under Uncertainty

被引:1
|
作者
Sasithong, Pruk [1 ]
Parnianifard, Amir [1 ]
Sinpan, Nitinun [1 ]
Poomrittigul, Suvit [2 ]
Saadi, Muhammad [3 ]
Wuttisittikulkij, Lunchakorn [1 ]
机构
[1] Chulalongkorn Univ, Dept Elect Engn, Wireless Commun Ecosyst Res Unit, Bangkok 10330, Thailand
[2] King Mongkuts Inst Technol Ladkrabang KMITL, Sch Informat Technol, Bangkok 10520, Thailand
[3] Univ Cent Punjab, Dept Elect Engn, Lahore 54590, Pakistan
关键词
simulation-based model; railway system; timetable scheduling; uncertainty; particle swarm optimization; TIMETABLE OPTIMIZATION; ROBUST; MODEL;
D O I
10.3390/electronics12163493
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
The ever-increasing demand for intercity travel, as well as competition among all modes of transportation, is an unavoidable reality that today's urban rail transit system must deal with. To meet this problem, urban railway companies must try to make better use of their existing plans and resources. Analytical approaches or simulation modeling can be used to develop or change a rail schedule to reflect the appropriate passenger demand. However, in the case of complex railway networks with several interlocking zones, analytical methods frequently have drawbacks. The goal of this article is to create a new simulation-based optimization model for the Bangkok railway system that takes into account the real assumptions and requirements in the railway system, such as uncertainty. The common particle swarm optimization (PSO) technique is combined with the developed simulation model to optimize the headways for each period in each day. Two different objective functions are incorporated into the models to consider both customer satisfaction by reducing the average waiting time and railway management satisfaction by reducing needed energy usage (e.g., reducing operating trains). The results obtained using a real dataset from the Bangkok railway system demonstrate that the simulation-based optimization approach for robust train service timetable scheduling, which incorporates both passenger waiting times and the number of operating trains as equally important objectives, successfully achieved an average waiting time of 11.02 min (with a standard deviation of 1.65 min) across all time intervals.
引用
收藏
页数:17
相关论文
共 50 条
  • [41] A simulation-based Genetic Algorithm approach for the quay crane scheduling under uncertainty
    Al-Dhaheri, Noura
    Jebali, Aida
    Diabat, Ali
    SIMULATION MODELLING PRACTICE AND THEORY, 2016, 66 : 122 - 138
  • [42] A stochastic simulation-based risk assessment method for water allocation under the uncertainty
    Chen, Shu
    Yuan, Zhe
    Lei, Caixiu
    Li, Qingqing
    Wang, Yongqiang
    WATER SUPPLY, 2022, 22 (05) : 5638 - 5649
  • [43] A simulation-based decomposition approach for two-stage staffing optimization in call centers under arrival rate uncertainty
    Thuy Anh Ta
    Chan, Wyean
    Bastin, Fabian
    L'Ecuyer, Pierre
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2021, 293 (03) : 966 - 979
  • [44] A Simulation-Based Optimization Method for Solving the Integrated Supply Chain Network Design and Inventory Control Problem under Uncertainty
    Ye, Wenhe
    You, Fengqi
    PRES15: PROCESS INTEGRATION, MODELLING AND OPTIMISATION FOR ENERGY SAVING AND POLLUTION REDUCTION, 2015, 45 : 499 - 504
  • [45] Simulation-based optimization of an agent-based simulation
    Deckert, Andreas
    Klein, Robert
    NETNOMICS, 2014, 15 (01): : 33 - 56
  • [46] Minimum resistance ship hull uncertainty optimization design based on simulation-based design method
    Hou Y.
    You Y.
    Liang X.
    Journal of Shanghai Jiaotong University (Science), 2017, 22 (6) : 657 - 663
  • [47] Minimum Resistance Ship Hull Uncertainty Optimization Design Based on Simulation-Based Design Method
    侯远杭
    游园
    梁霄
    JournalofShanghaiJiaotongUniversity(Science), 2017, 22 (06) : 657 - 663
  • [48] An approach to optimization of airport taxiway scheduling and traversal under uncertainty
    Anderson, Ross
    Milutinovic, Dejan
    PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART G-JOURNAL OF AEROSPACE ENGINEERING, 2013, 227 (G2) : 273 - 284
  • [49] A general framework on the simulation-based optimization under fixed computing budget
    Lee, Loo Hay
    Chew, Ek Peng
    Manikam, Puvaneswari
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2006, 174 (03) : 1828 - 1841
  • [50] Using System Dynamics for Simulation and Optimization of an Investment Decision System Under Uncertainty
    Roodsari, Sara Yousefi
    PROCESS INTEGRATION AND OPTIMIZATION FOR SUSTAINABILITY, 2022, 6 (02) : 367 - 381