Simulation-Based Headway Optimization for the Bangkok Airport Railway System under Uncertainty

被引:1
|
作者
Sasithong, Pruk [1 ]
Parnianifard, Amir [1 ]
Sinpan, Nitinun [1 ]
Poomrittigul, Suvit [2 ]
Saadi, Muhammad [3 ]
Wuttisittikulkij, Lunchakorn [1 ]
机构
[1] Chulalongkorn Univ, Dept Elect Engn, Wireless Commun Ecosyst Res Unit, Bangkok 10330, Thailand
[2] King Mongkuts Inst Technol Ladkrabang KMITL, Sch Informat Technol, Bangkok 10520, Thailand
[3] Univ Cent Punjab, Dept Elect Engn, Lahore 54590, Pakistan
关键词
simulation-based model; railway system; timetable scheduling; uncertainty; particle swarm optimization; TIMETABLE OPTIMIZATION; ROBUST; MODEL;
D O I
10.3390/electronics12163493
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
The ever-increasing demand for intercity travel, as well as competition among all modes of transportation, is an unavoidable reality that today's urban rail transit system must deal with. To meet this problem, urban railway companies must try to make better use of their existing plans and resources. Analytical approaches or simulation modeling can be used to develop or change a rail schedule to reflect the appropriate passenger demand. However, in the case of complex railway networks with several interlocking zones, analytical methods frequently have drawbacks. The goal of this article is to create a new simulation-based optimization model for the Bangkok railway system that takes into account the real assumptions and requirements in the railway system, such as uncertainty. The common particle swarm optimization (PSO) technique is combined with the developed simulation model to optimize the headways for each period in each day. Two different objective functions are incorporated into the models to consider both customer satisfaction by reducing the average waiting time and railway management satisfaction by reducing needed energy usage (e.g., reducing operating trains). The results obtained using a real dataset from the Bangkok railway system demonstrate that the simulation-based optimization approach for robust train service timetable scheduling, which incorporates both passenger waiting times and the number of operating trains as equally important objectives, successfully achieved an average waiting time of 11.02 min (with a standard deviation of 1.65 min) across all time intervals.
引用
收藏
页数:17
相关论文
共 50 条
  • [31] SIMULATION-BASED EVALUATION OF AGRICULTURE STRATEGIES UNDER UNCERTAINTY OF WEATHER FORECAST
    Merkuryev, Yuri
    Bardachenko, Vladimir
    Solomennikov, Andrey
    INTERNATIONAL MEDITERRANEAN MODELLING MULTICONFERENCE 2006, 2006, : 313 - 318
  • [32] A simulation-based algorithm for optimal pricing policy under demand uncertainty
    Chakravarty, Saswata
    Padakandla, Sindhu
    Bhatnagar, Shalabh
    INTERNATIONAL TRANSACTIONS IN OPERATIONAL RESEARCH, 2014, 21 (05) : 737 - 760
  • [33] Optimization model of the hub airport schedule under uncertainty
    Guzha, E. D.
    Romanenko, V. A.
    Skorokhod, M. A.
    IX INTERNATIONAL MULTIDISCIPLINARY SCIENTIFIC AND RESEARCH CONFERENCE MODERN ISSUES IN SCIENCE AND TECHNOLOGY / WORKSHOP ADVANCED TECHNOLOGIES IN AEROSPACE, MECHANICAL AND AUTOMATION ENGINEERING, 2018, 450
  • [34] Heterogeneous uncertainty quantification using Bayesian inference for simulation-based design optimization
    Li, Mingyang
    Wang, Zequn
    STRUCTURAL SAFETY, 2020, 85
  • [35] Computational Experiments on Sampling Methods for Uncertainty Propagation and the Implications for Simulation-Based Optimization
    Fahmi, Ismail
    Cremaschi, Selen
    26TH EUROPEAN SYMPOSIUM ON COMPUTER AIDED PROCESS ENGINEERING (ESCAPE), PT B, 2016, 38B : 1779 - 1784
  • [36] DISTRIBUTIONALLY ROBUST OPTIMIZATION FOR INPUT MODEL UNCERTAINTY IN SIMULATION-BASED DECISION MAKING
    Ghosh, Soumyadip
    Squillante, Mark S.
    2022 WINTER SIMULATION CONFERENCE (WSC), 2022, : 2294 - 2305
  • [37] Variance-Based Sensitivity Analysis to Support Simulation-Based Design Under Uncertainty
    Opgenoord, Max M. J.
    Allaire, Douglas L.
    Willcox, Karen E.
    JOURNAL OF MECHANICAL DESIGN, 2016, 138 (11)
  • [38] PARALLEL SIMULATION-BASED OPTIMIZATION ON SCHEDULING OF A SEMICONDUCTOR MANUFACTURING SYSTEM
    Ma, Yumin
    Qiao, Fei
    Yu, Wei
    Lu, Jianfeng
    PROCEEDINGS OF THE 2014 WINTER SIMULATION CONFERENCE (WSC), 2014, : 2571 - 2579
  • [39] Simulation-based cost estimation under economic uncertainty using kernel estimators
    Asiedu, Y
    Besant, RW
    Gu, P
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2000, 38 (09) : 2023 - 2035
  • [40] A SIMULATION-BASED UPSCALING TECHNIQUE FOR MULTISCALE MODELING OF ENGINEERING SYSTEMS UNDER UNCERTAINTY
    Gorguluarslan, Recep M.
    Choi, Seung-Kyum
    INTERNATIONAL JOURNAL FOR MULTISCALE COMPUTATIONAL ENGINEERING, 2014, 12 (06) : 549 - 566