Uninterrupted lift of gas, water, and fines in unconventional gas wells using foam-assisted artificial lift

被引:2
|
作者
Amani, Pouria [1 ]
Firouzi, Mahshid [1 ]
机构
[1] Univ Newcastle, Coll Engn Sci & Environm, Callaghan, NSW 2308, Australia
来源
基金
澳大利亚研究理事会;
关键词
Foam lift; Particle lift; Unconventional gas; Coal seam gas; Sustainable dewatering; FLOW; SURFACTANTS;
D O I
10.1016/j.jgsce.2023.204977
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Sustainable and clean production of natural gas is of paramount importance in transitioning to a low-emission economy. Gas production in an unconventional well such as a coal seam gas (CSG) relies on continuous dewatering, commonly performed through a progressive cavity pump (PCP). PCPs are susceptible to failure for different reasons, primarily the interference of solid particles. This results in interruptions, pump replacement, well cleaning and recommissioning which pose long downtimes (i.e., reduced well deliverability), work-over at substantial costs, along with environmental impacts such as increased methane emissions to the atmosphere.This paper aims to demonstrate and assess the performance and suitability of a sustainable dewatering technique, referred to as foam-assisted gas lift (FAGL) which offers uninterrupted dewatering, minimal downtime and minimised environmental impacts. FAGL is capable of maintaining the gas well deliverability by replacing the downhole pump with a gas compressor at the surface and an engineered gas-liquid-solid flow dynamics by injecting foamers and a small amount of surplus gas into the wellbore.The performance of FAGL is evaluated in 45 vertical CSG wells in Australia under different operating conditions and depths ranging between 400 and 1050 m and is compared with well data using PCPs. The flowing bottomhole pressure (FBHP) is calculated to assess the suitability of FAGL under different operating conditions. The results from this study show that FAGL outperforms PCPs in more than 50% of the cases under this study, offering on average 34% lower FBHP. The FAGL's capability in lifting solid particles is demonstrated using solids taken from gas wells in Queensland, showing a reliable and continuous lift of particles. In addition, chemical defoaming of the foam at the surface is demonstrated to avoid re-foaming in the downstream and mitigate the risk of contamination of the surrounding area.
引用
收藏
页数:13
相关论文
共 50 条
  • [41] The Optimization of Gas Allocation to a Group of Wells in a Gas Lift Using an Efficient Ant Colony Algorithm (ACO)
    Ghaedi, M.
    Ghotbi, C.
    Aminshahidy, B.
    ENERGY SOURCES PART A-RECOVERY UTILIZATION AND ENVIRONMENTAL EFFECTS, 2014, 36 (11) : 1234 - 1248
  • [42] WATER-LIFT + DISPOSAL OPERATIONS IN LOW-PRESSURE SHALLOW GAS WELLS
    MELTON, CG
    COOK, RL
    JOURNAL OF PETROLEUM TECHNOLOGY, 1964, 16 (06): : 619 - &
  • [43] Artificial lift infrastructure planning of shale gas horizontal wells considering endogenous and exogenous uncertainties
    Zeng, Zuo
    Cremaschi, Selen
    AICHE JOURNAL, 2022, 68 (02)
  • [44] Hydrodynamic Simulation of the Process of Operation of Gas-Lift Wells
    Abbasov, e. M.
    Kerimova, Sh. A.
    Melikov, A. G.
    JOURNAL OF ENGINEERING PHYSICS AND THERMOPHYSICS, 2023, 96 (05) : 1329 - 1343
  • [45] Dynamic plunger lift model for deliquification of shale gas wells
    Gupta, Arun
    Kaisare, Niket S.
    Nandola, Naresh N.
    COMPUTERS & CHEMICAL ENGINEERING, 2017, 103 : 81 - 90
  • [46] Analysis Clarifies Failures of Gas Lift Valves in Subsea Wells
    Carpenter, Chris
    JPT, Journal of Petroleum Technology, 2024, 76 (10): : 79 - 81
  • [47] ELIMINATION OF HYDRATE PLUGS DURING OPERATION OF GAS LIFT WELLS
    FAZLUTDINOV, AR
    BABENKO, VL
    NEFTYANOE KHOZYAISTVO, 1978, (03): : 73 - 75
  • [48] HOW TO SPACE GAS LIFT MANDRELS IN NEW WELLS.
    Kanu, Eni P.
    Brown, Kermit E.
    Mach, Joe M.
    1600, (53):
  • [49] Online optimization for a plunger lift process in shale gas wells
    Nandola, Naresh N.
    Kaisare, Niket S.
    Gupta, Arun
    COMPUTERS & CHEMICAL ENGINEERING, 2018, 108 : 89 - 97
  • [50] On instability in gas lift wells and schemes for stabilization by automatic control
    Eikrem, Gisle Otto
    Aarno, Ole Morten
    Foss, Bjarne A.
    SPE PRODUCTION & OPERATIONS, 2008, 23 (02): : 268 - 279