Bi-Level Coordinated Power System Restoration Model Considering the Support of Multiple Flexible Resources

被引:22
|
作者
Liu, Shengyuan [1 ,2 ]
Chen, Changming [1 ]
Jiang, Yicheng [2 ]
Lin, Zhenzhi [1 ,3 ]
Wang, Hongtao [3 ]
Waseem, Muhammad [1 ]
Wen, Fushuan [1 ]
机构
[1] Zhejiang Univ, Coll Elect Engn, Hangzhou 310027, Peoples R China
[2] State Grid Zhejiang Elect Power Corp, Hangzhou 310007, Peoples R China
[3] Shandong Univ, Sch Elect Engn, Jinan 250061, Peoples R China
基金
中国国家自然科学基金;
关键词
Load modeling; Power systems; Power system restoration; Generators; Network topology; Optimization; Uncertainty; flexible resources; renewable energy source (RES); Index Terms; electric vehicle system (EVS) energy storage system (ESS); network topology; bi-level optimization; STRATEGY; MICROGRIDS; ALGORITHM; SEQUENCE;
D O I
10.1109/TPWRS.2022.3171201
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
When power systems encounter outages and large-scale blackouts, system restoration is critical and should be carried out with dedicated schemes. In this past, most studies divided the power system restoration into three stages (i.e., black-start zone partitioning, network reconfiguration, and load restoration) and deal with them separately. After that, few studies considering the three stages together were emerging while the support of multiple flexible resources, i.e., renewable energy source (RES), electric vehicle system (EVS) and energy storage system (ESS), were not considered comprehensively. Therefore, a bi-level coordinated power system restoration (BiCPSR) model is proposed in this work considering the support of multiple flexible resources. In the upper level, two network topology indices that describe the "reachability" and "shortest reachable distance" of buses in power systems, and the restoration characteristics of generators and loads are utilized for optimizing the start-up sequence of generators and network reconfiguration. In the lower level, the uncertainties of RES and EVS are considered by various scenarios and the support of multiple flexible resources is utilized cooperatively for accelerating the restoration process and maximizing the restorable load. Case studies on the revised IEEE 39-bus, WECC 179-bus and the actual Zhejiang power systems are performed to illustrate the basic features of the proposed model and its availability in bulk power systems. The comparisons between the proposed model and other models are also performed to illustrate the strengths of the proposed model.
引用
收藏
页码:1583 / 1595
页数:13
相关论文
共 50 条
  • [31] Optimal generation units start-up sequence during restoration of power system considering network reliability using bi-level optimization
    Ketabi, Abbas
    Karimizadeh, Amin
    Shahidehpour, Mohammad
    INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2019, 104 : 772 - 783
  • [32] Bi-level optimization model for integrated energy system considering the thermal comfort of heat customers
    Wu, Chenyu
    Gu, Wei
    Xu, Yinliang
    Jiang, Ping
    Lu, Shuai
    Zhao, Bo
    APPLIED ENERGY, 2018, 232 : 607 - 616
  • [33] Bi-Level Optimal Allocation of Flexible Resources for Distribution Network Considering Different Energy Storage Operation Strategies in Electricity Market
    Ren, Zhijun
    Guo, Hongxia
    Yang, Ping
    Zuo, Guanlin
    Zhao, Zhuoli
    IEEE Access, 2020, 8 : 58497 - 58508
  • [34] A Bi-Level Coordinated Optimization Strategy for Smart Appliances Considering Online Demand Response Potential
    Ning, Jia
    Tang, Yi
    Chen, Qian
    Wang, Jianming
    Zhou, Jianhua
    Gao, Bingtuan
    ENERGIES, 2017, 10 (04)
  • [35] Bi-Level Optimal Allocation of Flexible Resources for Distribution Network Considering Different Energy Storage Operation Strategies in Electricity Market
    Ren, Zhijun
    Guo, Hongxia
    Yang, Ping
    Zuo, Guanlin
    Zhao, Zhuoli
    IEEE ACCESS, 2020, 8 : 58497 - 58508
  • [36] Bi-Level Coordinated Planning of Sectionalizing Switches and Tie Lines Considering Operation Mode Adjustment
    Luo, Qiang
    Li, Wangjun
    Gao, Chong
    Zhang, Junxiao
    Chen, Peidong
    Xu, Zhiheng
    Peng, Xiangang
    Lai, Chun Sing
    Lai, Loi Lei
    FRONTIERS IN ENERGY RESEARCH, 2022, 10
  • [37] A Bi-Level Optimization Model for Virtual Power Plant Membership Selection Considering Load Time Series
    Wang, Yantao
    Zhang, Yinhan
    Qi, Xuesong
    Wang, Meiqi
    Wang, Xinyue
    SUSTAINABILITY, 2023, 15 (03)
  • [38] A novel bi-level programming model for cloud logistics resources allocation
    Zhou, Fu-Li
    He, Yan-Dong
    Deng, Lei
    Wang, Min
    Journal of Computers (Taiwan), 2019, 30 (06) : 16 - 30
  • [39] Bi-level Optimal Dispatching of Power System Based on Demand Response Considering Nodal Carbon Intensity
    Liang N.
    Fang Q.
    Xu H.
    Zheng F.
    Miao M.
    Dianli Xitong Zidonghua/Automation of Electric Power Systems, 2024, 48 (09): : 44 - 53
  • [40] A Bi-Level Peak Regulation Optimization Model for Power Systems Considering Ramping Capability and Demand Response
    Fang, Linbo
    Peng, Wei
    Li, Youliang
    Yang, Zi
    Sun, Yi
    Liu, Hang
    Xu, Lei
    Sun, Lei
    Fang, Weikang
    ENERGIES, 2024, 17 (19)