Bi-Level Coordinated Power System Restoration Model Considering the Support of Multiple Flexible Resources

被引:24
作者
Liu, Shengyuan [1 ,2 ]
Chen, Changming [1 ]
Jiang, Yicheng [2 ]
Lin, Zhenzhi [1 ,3 ]
Wang, Hongtao [3 ]
Waseem, Muhammad [1 ]
Wen, Fushuan [1 ]
机构
[1] Zhejiang Univ, Coll Elect Engn, Hangzhou 310027, Peoples R China
[2] State Grid Zhejiang Elect Power Corp, Hangzhou 310007, Peoples R China
[3] Shandong Univ, Sch Elect Engn, Jinan 250061, Peoples R China
基金
中国国家自然科学基金;
关键词
Load modeling; Power systems; Power system restoration; Generators; Network topology; Optimization; Uncertainty; flexible resources; renewable energy source (RES); Index Terms; electric vehicle system (EVS) energy storage system (ESS); network topology; bi-level optimization; STRATEGY; MICROGRIDS; ALGORITHM; SEQUENCE;
D O I
10.1109/TPWRS.2022.3171201
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
When power systems encounter outages and large-scale blackouts, system restoration is critical and should be carried out with dedicated schemes. In this past, most studies divided the power system restoration into three stages (i.e., black-start zone partitioning, network reconfiguration, and load restoration) and deal with them separately. After that, few studies considering the three stages together were emerging while the support of multiple flexible resources, i.e., renewable energy source (RES), electric vehicle system (EVS) and energy storage system (ESS), were not considered comprehensively. Therefore, a bi-level coordinated power system restoration (BiCPSR) model is proposed in this work considering the support of multiple flexible resources. In the upper level, two network topology indices that describe the "reachability" and "shortest reachable distance" of buses in power systems, and the restoration characteristics of generators and loads are utilized for optimizing the start-up sequence of generators and network reconfiguration. In the lower level, the uncertainties of RES and EVS are considered by various scenarios and the support of multiple flexible resources is utilized cooperatively for accelerating the restoration process and maximizing the restorable load. Case studies on the revised IEEE 39-bus, WECC 179-bus and the actual Zhejiang power systems are performed to illustrate the basic features of the proposed model and its availability in bulk power systems. The comparisons between the proposed model and other models are also performed to illustrate the strengths of the proposed model.
引用
收藏
页码:1583 / 1595
页数:13
相关论文
共 50 条
  • [31] Coordinated operation of wind power and other resources considering power system requirements
    Wang, Ying
    Zhang, Kaifeng
    Teng, Xianliang
    Ding, Qia
    Huang, Xianchao
    JOURNAL OF RENEWABLE AND SUSTAINABLE ENERGY, 2015, 7 (02)
  • [32] A novel partitioning method for the power grid restoration considering the support of multiple LCC-HVDC systems
    Yang, Chao
    Cheng, Tianle
    Li, Shaoyan
    Gu, Xueping
    Yang, Lei
    ENERGY REPORTS, 2023, 9 : 1104 - 1112
  • [33] Bi-Level Optimal Design for DC Traction Power Supply System With Reversible Substations
    Xu, Qian
    Liu, Wei
    Yang, Qianfeng
    Zhang, Xiaodong
    Guan, Haohao
    Deng, Haotian
    Xiong, Peng
    IEEE TRANSACTIONS ON TRANSPORTATION ELECTRIFICATION, 2024, 10 (03): : 7488 - 7500
  • [34] Bi-level Optimal Configuration of Park Energy Internet Considering Multiple Evaluation Indicators
    Lin X.
    Zhang Y.
    Chen B.
    Fan S.
    Chen Z.
    Dianli Xitong Zidonghua/Automation of Electric Power Systems, 2019, 43 (20): : 8 - 15and30
  • [35] A MILP-based power system parallel restoration model with the support of mobile energy storage systems
    Xie, Yunyun
    Cai, Sheng
    Wang, Jie
    Chen, Yuhuan
    Qiu, Chenguang
    ELECTRIC POWER SYSTEMS RESEARCH, 2024, 234
  • [36] A Bi-Level Model for the Bidding Strategy of an Inter-Regional Electricity Trading Aggregator Considering Reliability Requirements and Transmission Losses
    Guo, Libang
    Ding, Yi
    Bao, Minglei
    Zeng, Dan
    IEEE ACCESS, 2021, 9 : 13476 - 13487
  • [37] Power system observability enhancement for parallel restoration of subsystems considering renewable energy resources
    Khodabakhshian, Amin
    Amin, Mohammad Reza
    Hooshmand, Rahmat-allah
    Siano, Pierluigi
    INTERNATIONAL TRANSACTIONS ON ELECTRICAL ENERGY SYSTEMS, 2020, 30 (04)
  • [38] Bi-level robust dynamic economic emission dispatch considering wind power uncertainty
    Hu, Zhijian
    Zhang, Menglin
    Wang, Xiaofei
    Li, Chen
    Hu, Mengyue
    ELECTRIC POWER SYSTEMS RESEARCH, 2016, 135 : 35 - 47
  • [39] Bi-Level Programming for Integrating Flexible Demand in Combined Smart Energy System
    Xi, Yufei
    Hamacher, Thomas
    Peric, Vedran
    Chen, Zhe
    Lund, Henrik
    2021 IEEE INTERNATIONAL SMART CITIES CONFERENCE (ISC2), 2021,
  • [40] Multi-Scenario Based Bi-Level Coordinated Planning of Active Distribution System Under Uncertain Environment
    Sannigrahi, Surajit
    Ghatak, Sriparna Roy
    Acharjee, Parimal
    IEEE TRANSACTIONS ON INDUSTRY APPLICATIONS, 2020, 56 (01) : 850 - 863