Assessing the public-private partnership handover: Experience from China's water sector

被引:4
作者
Bao, Fengyu [1 ]
Martek, Igor [2 ]
Chan, Albert P. C. [3 ]
Chen, Chuan [4 ]
Yang, Yang [3 ]
Yu, Heng [1 ]
机构
[1] Chengdu Univ, Sch Architecture & Civil Engn, 2025 Chengluo Ave, Chengdu, Sichuan, Peoples R China
[2] Deakin Univ, Sch Architecture & Built Environm, Geelong, Vic 3220, Australia
[3] Hong Kong Polytech Univ, Dept Bldg & Real Estate, Hung Hom, Kowloon, Hong Kong, Peoples R China
[4] Sichuan Univ, Business Sch, Chengdu, Sichuan, Peoples R China
基金
中国国家自然科学基金;
关键词
Public-private partnerships; PPP; Handover stage; Project success; Key performance measurement indicators; Water sector; China; CRITICAL SUCCESS FACTORS; PERFORMANCE-MEASUREMENT; RISK ALLOCATION; PROJECTS; MODEL; PPP; NEGOTIATION; EFFICIENCY;
D O I
10.1016/j.jup.2022.101469
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Most infrastructure public-private partnerships (PPPs) are returned to the government once the contract term expires. Before the handover, a preparatory period, known as the "handover stage (HS)," is needed to determine whether the project is fit for handover. However, to date, no means to assess the performance status of the handover management has been established. This study addresses this practical demand by establishing a definition of handover success and identifying and evaluating criteria for the measurement of handover success, which contributes to a better understanding of HS management.
引用
收藏
页数:10
相关论文
共 68 条
  • [1] Unraveling of BOT scheme: Malaysia's Indah Water Konsortium
    Abdul-Aziz, AR
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2001, 127 (06): : 457 - 460
  • [2] Future criteria for success of building projects in Malaysia
    Al-Tmeemy, Samiaah M. Hassen M.
    Abdul-Rahman, Hamzah
    Harun, Zakaria
    [J]. INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2011, 29 (03) : 337 - 348
  • [3] [Anonymous], 2014, PUBLIC PRIVATE PARTN
  • [4] Successful delivery of public-private partnerships for infrastructure development
    Aziz, Ahmed M. Abdel
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2007, 133 (12) : 918 - 931
  • [5] Baccarini D., 1999, PROJECT MANAGEMENT J, V30, P25, DOI DOI 10.1177/875697289903000405
  • [6] Critical Risks Inherent to the Transfer Phase of Public-Private Partnership Water Projects in China
    Bao, Fengyu
    Martek, Igor
    Chen, Chuan
    Wu, Qihong
    Chan, Albert P. C.
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 2022, 38 (03)
  • [7] Dynamic framework transfer model for public-private partnerships Lessons from a China water sector case study
    Bao, Fengyu
    Chen, Chuan
    Chan, Albert P. C.
    Martek, Igor
    Shrestha, Asheem
    [J]. ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2019, 26 (07) : 1218 - 1239
  • [8] LIFECYCLE PERFORMANCE MEASUREMENT OF PUBLIC-PRIVATE PARTNERSHIPS: A CASE STUDY IN CHINA'S WATER SECTOR
    Bao, Fengyu
    Martek, Igor
    Chen, Chuan
    Chan, Albert P. C.
    Yu, Yao
    [J]. INTERNATIONAL JOURNAL OF STRATEGIC PROPERTY MANAGEMENT, 2018, 22 (06) : 516 - 531
  • [9] Review of Public-Private Partnership Literature from a Project Lifecycle Perspective
    Bao, Fengyu
    Chan, Albert P. C.
    Chen, Chuan
    Darko, Amos
    [J]. JOURNAL OF INFRASTRUCTURE SYSTEMS, 2018, 24 (03)
  • [10] Performance measurement in construction
    Bassioni, HA
    Price, ADF
    Hassan, TM
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 2004, 20 (02) : 42 - 50