Integrated planning of berth allocation, quay crane assignment and yard assignment in multiple cooperative terminals

被引:14
作者
Guo, Liming [1 ]
Zheng, Jianfeng [1 ]
Du, Jian [2 ]
Gao, Ziyou [3 ]
Fagerholt, Kjetil [4 ]
机构
[1] Dalian Maritime Univ, Transportat Engn Coll, Dalian, Peoples R China
[2] Dalian Jiaotong Univ, Sch Traff & Transportat Engn, Dalian, Peoples R China
[3] Beijing Jiaotong Univ, Sch Traff & Transportat, Beijing, Peoples R China
[4] Norwegian Univ Sci & Technol, Dept Ind Econ & Technol Management, Trondheim, Norway
关键词
Berth allocation; Yard assignment; Quay crane assignment; Terminal cooperation; Adaptive large neighborhood search; LARGE NEIGHBORHOOD SEARCH; TRANSSHIPMENT TERMINALS; SPEED OPTIMIZATION; TEMPLATE DESIGN; CONTAINER; MANAGEMENT; SEAPORT; MODEL;
D O I
10.1016/j.tre.2024.103456
中图分类号
F [经济];
学科分类号
02 ;
摘要
To further enhance the service level of a transshipment container port, this work considers terminal cooperation in terms of shore-side and yard-side resource sharing. This work proposes an integrated berth allocation, quay crane assignment and yard assignment problem in multiple cooperative terminals. In the proposed problem, container flow movements are classified into three types, i.e., import, export and transshipment containers, within a terminal and between terminals. A mixed integer nonlinear programming model is proposed for the proposed problem, aiming to minimize the total operating costs at all terminals considered. To address real-size instances, a tailored adaptive large neighborhood search (ALNS) embedded with column generation and CPLEX is proposed. Numerical experiments on different problem scales are provided to assess the proposed model and the proposed ALNS. Numerical experiments show that, i) the proposed algorithm can solve the instances with 4 terminals and 100 arriving vessels in less than 3 min; ii) compared with the two models without considering port cooperation and integrated optimization, the cost reduction obtained by our model is up to 14.02% and 22.00%, respectively.
引用
收藏
页数:31
相关论文
共 48 条
[41]   Collaborative mechanisms for berth allocation [J].
Wang, Shuaian ;
Liu, Zhiyuan ;
Qu, Xiaobo .
ADVANCED ENGINEERING INFORMATICS, 2015, 29 (03) :332-338
[42]   Segment-based alteration for container liner shipping network design [J].
Wang, Shuaian ;
Liu, Zhiyuan ;
Meng, Qiang .
TRANSPORTATION RESEARCH PART B-METHODOLOGICAL, 2015, 72 :128-145
[43]   Collaborative emergency berth scheduling based on decentralized decision and price mechanism [J].
Xu, Ya ;
Du, Yuquan ;
Li, Yongjian ;
Zhang, Heng .
ANNALS OF OPERATIONS RESEARCH, 2021, 298 (1-2) :525-554
[44]   Optimizing berth allocation and storage space in direct transshipment operations at container terminals [J].
Zeng, Qingcheng ;
Feng, Yuanjun ;
Chen, Zigen .
MARITIME ECONOMICS & LOGISTICS, 2017, 19 (03) :474-503
[45]   Integrated berth and yard space allocation under uncertainty [J].
Zhen, Lu ;
Zhuge, Dan ;
Wang, Shuaian ;
Wang, Kai .
TRANSPORTATION RESEARCH PART B-METHODOLOGICAL, 2022, 162 :1-27
[46]   Terminal Allocation Problem in a Transshipment Hub Considering Bunker Consumption [J].
Zhen, Lu ;
Wang, Shuaian ;
Wang, Kai .
NAVAL RESEARCH LOGISTICS, 2016, 63 (07) :529-548
[47]   An Integrated Model for Berth Template and Yard Template Planning in Transshipment Hubs [J].
Zhen, Lu ;
Chew, Ek Peng ;
Lee, Loo Hay .
TRANSPORTATION SCIENCE, 2011, 45 (04) :483-504
[48]   Network Design and Capacity Exchange for Liner Alliances with Fixed and Variable Container Demands [J].
Zheng, Jianfeng ;
Gao, Ziyou ;
Yang, Dong ;
Sun, Zhuo .
TRANSPORTATION SCIENCE, 2015, 49 (04) :886-899