A multi-criteria decision-making model for analyzing a project-driven supply chain under interval type-2 fuzzy sets

被引:10
作者
Dorfeshan, Yahya [1 ]
Jolai, Fariborz [1 ]
Mousavi, Seyed Meysam [2 ]
机构
[1] Univ Tehran, Coll Engn, Sch Ind Engn, Tehran, Iran
[2] Shahed Univ, Dept Ind Engn, Tehran, Iran
关键词
Project -driven supply chain; Interval type-2 fuzzy sets; CODAS method; Resilience supplier evaluation; Critical path method; Best -worst method; CRITICAL PATH; PROGRAMMING APPROACH; CODAS METHOD; SELECTION; ALLOCATION; NETWORK; TOPSIS; AHP;
D O I
10.1016/j.asoc.2023.110902
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
Reviewing and integrating decisions in the supply chain and project management is crucial. This problem is known as a project-driven supply chain problem. By the growing dependency of project-driven companies on suppliers since they prefer to concentrate on their core and subcontracting processes, the project-based organization's dependence on suppliers has increased. A project-driven supply chain (PDSC) focuses on integrating project management activities into the supply chain. In this paper, a new model is presented for the integration of supply chain and project management decisions. Firstly, a new method is proposed to determine the resilience score of suppliers. This new model consists of three parts: the weighting of criteria, the weighting of experts, and the ranking of suppliers. To give weight to the experts, a new version of the combinative distance-based assessment (CODAS) method is presented based on the average and positive ideal concepts. Also, the importance of the criteria is specified by an expanded best-worst method (BWM). Computing the resilience score of suppliers is done through a developed CODAS method that is extended by the average and positive concepts. Furthermore, in order to consider the uncertainty of project-driven supply chain problems, interval type-2 fuzzy sets (IT2FSs) are used. Secondly, a new subtraction operation is defined to avoid producing negative in recursive critical path method (CPM) calculations in the IT2F environment. Also, the criticality score of the project's activities is defined. According to the criticality and resilience indexes of activities, suggestions are made to project management to prevent delays. Finally, a case study of hospital construction is solved to illustrate the strengths of the proposed model.
引用
收藏
页数:20
相关论文
共 50 条
  • [31] An agent-based approach for project-driven supply chain problem under information asymmetry and decentralized decision-making
    Fu, Fang
    Xing, Wei
    COMPUTERS & INDUSTRIAL ENGINEERING, 2021, 158
  • [32] A LITERATURE REVIEW OF INTERVAL-VALUED INTUITIONISTIC FUZZY MULTI-CRITERIA DECISION-MAKING METHODOLOGIES
    Kokoc, Melda
    Ersoz, Suleyman
    OPERATIONS RESEARCH AND DECISIONS, 2021, 31 (04) : 89 - 116
  • [33] Multi-criteria decision-making based on hesitant fuzzy linguistic term sets: An outranking approach
    Wang, Jing
    Wang, Jian-qiang
    Zhang, Hong-yu
    Chen, Xiao-hong
    KNOWLEDGE-BASED SYSTEMS, 2015, 86 : 224 - 236
  • [34] An analysis approach to handle uncertain multi-criteria group decision problems in the framework of interval type-2 fuzzy sets theory
    Mohagheghi, Vahid
    Mousavi, S. Meysam
    NEURAL COMPUTING & APPLICATIONS, 2019, 31 (08) : 3543 - 3557
  • [35] Performance evaluation of green supply chain management using integrated fuzzy multi-criteria decision making techniques
    Uygun, Ozer
    Dede, Aye
    COMPUTERS & INDUSTRIAL ENGINEERING, 2016, 102 : 502 - 511
  • [36] A fuzzy multi-criteria decision-making model for construction contractor prequalification
    Nieto-Morote, Ana
    Ruz-Vila, Francisco
    AUTOMATION IN CONSTRUCTION, 2012, 25 : 8 - 19
  • [37] A Novel Interval Type-2 Fuzzy CPT-TODIM Method for Multi-criteria Group Decision Making and Its Application to Credit Risk Assessment in Supply Chain Finance
    Li, Wen
    Wang, Luqi
    Rehman, Obaid Ur
    INTERNATIONAL JOURNAL OF FUZZY SYSTEMS, 2025, 27 (01) : 54 - 76
  • [38] A Multi-Criteria Decision-Making Approach with Interval Numbers for Evaluating Project Risk Responses
    Mousavi, S. M.
    Makui, A.
    Raissi, S.
    Mojtahedi, S. M. H.
    INTERNATIONAL JOURNAL OF ENGINEERING, 2012, 25 (02): : 121 - +
  • [39] An extension of ELECTRE to multi-criteria decision-making problems with multi-hesitant fuzzy sets
    Peng, Juan-juan
    Wang, Jian-qiang
    Wang, Jing
    Yang, Li-Jun
    Chen, Xiao-hong
    INFORMATION SCIENCES, 2015, 307 : 113 - 126
  • [40] An extended TODIM multi-criteria group decision making method for green supplier selection in interval type-2 fuzzy environment
    Qin, Jindong
    Liu, Xinwang
    Pedrycz, Witold
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2017, 258 (02) : 626 - 638