Procurement Contract Design Under Asymmetric Information of Random Yield

被引:0
作者
Ji, Qingkai [1 ]
Liu, Feng [2 ]
Zhuang, Jun [3 ]
机构
[1] Hainan Univ, Management Sch, 58 Renmin Ave, Haikou 570228, Hainan, Peoples R China
[2] Dongbei Univ Finance & Econ, Sch Management Sci & Engn, Key Lab Liaoning Prov Data Analyt & Decis Making O, 217 Jianshan St, Dalian 116025, Liaoning, Peoples R China
[3] SUNY Buffalo, Dept Ind & Syst Engn, 317 Bell Hall, Buffalo, NY 14260 USA
基金
中国国家自然科学基金; 美国国家科学基金会;
关键词
Supply chain contract; random yield; asymmetric information; SUPPLY CHAIN;
D O I
10.1142/S0217595923500161
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
Unreliable suppliers may pose a substantial threat to supply chains, especially when they hold private information of their reliability. We consider a dyadic supply chain where the information of supplier reliability (in the form of random production yield) is asymmetric. We propose a new mechanism-design model and derive the buyer's optimal procurement contract menu offered to suppliers with private information. We prove that the contract menu is as simple as offering two different inflated order amounts and setting the procuring price sufficiently low to let the suppliers earn zero reservation profits. These results are derived analytically under uniform distribution. We test them numerically under beta distribution and find them hold as well. However, the informational rent will become positive when the supplier's reservation profit is positive. Positive informational rent is also found when we consider another structure of the supplier's production cost. This paper provides some new insights into supply chain management under asymmetric information of uncertain supply.
引用
收藏
页数:24
相关论文
共 50 条
[41]   Economical Incentive Contract Design with Asymmetric Information in Building Energy Efficiency Retrofit [J].
Han Qingmiao ;
Zhan Songlin ;
Zhang Yang ;
Chen Jian .
2008 4TH INTERNATIONAL CONFERENCE ON WIRELESS COMMUNICATIONS, NETWORKING AND MOBILE COMPUTING, VOLS 1-31, 2008, :8713-+
[42]   Project duration contract design problem under uncertain information [J].
Qi, Long .
SOFT COMPUTING, 2018, 22 (17) :5593-5602
[43]   Project duration contract design problem under uncertain information [J].
Long Qi .
Soft Computing, 2018, 22 :5593-5602
[44]   Design of Incentive Contract for Technological Innovation of New Energy Vehicles with Asymmetric Information [J].
Cai, Dong ;
Guo, Chunxiang ;
Tan, Yue .
INTERNATIONAL JOURNAL OF ENVIRONMENTAL RESEARCH AND PUBLIC HEALTH, 2019, 16 (22)
[45]   Design of outsourcing contract considering the risk attitude of both sides with asymmetric information [J].
Chen, Ke-Gui ;
Huang, Min ;
Meng, Fan-Li ;
Wang, Xing-Wei .
Dongbei Daxue Xuebao/Journal of Northeastern University, 2014, 35 (09) :1234-1238
[46]   Optimal Contract Design for a National Brand Manufacturer Under Store Brand Private Information [J].
Cao, Xinyan ;
Fang, Xiang ;
Xiao, Guang ;
Yang, Nan .
M&SOM-MANUFACTURING & SERVICE OPERATIONS MANAGEMENT, 2023, 25 (05) :1835-1854
[47]   Simple Contracts to Coordinate the Capacity Procurement Model with Asymmetric Demand Information [J].
Li, Linqiu ;
Liu, Ke .
JOURNAL OF SYSTEMS SCIENCE & COMPLEXITY, 2022, 35 (01) :245-263
[48]   Capacity competition under random yield [J].
Yan, Xiaoming .
OPERATIONS RESEARCH LETTERS, 2012, 40 (05) :398-403
[49]   Optimal design of intergovernmental grants under asymmetric information [J].
Huber, B ;
Runkel, M .
INTERNATIONAL TAX AND PUBLIC FINANCE, 2006, 13 (01) :25-41
[50]   Optimal Design of Intergovernmental Grants Under Asymmetric Information [J].
Bernd Huber ;
Marco Runkel .
International Tax and Public Finance, 2006, 13 :25-41