A Comparison of the Project Management Methodologies PRINCE2 and PMBOK in Managing Repetitive Construction Projects

被引:3
作者
Simonaitis, Aivaras [1 ]
Dauksys, Mindaugas [1 ]
Mockiene, Jurate [1 ,2 ]
机构
[1] Kaunas Univ Technol, Fac Civil Engn & Architecture, LT-44249 Kaunas, Lithuania
[2] Kaunas Univ Appl Engn Sci, Fac Engn Sci, LT-50155 Kaunas, Lithuania
关键词
project management methodologies; PRINCE2; PMBOK; repetitive construction projects; DESIGN; DELAY; MODEL;
D O I
10.3390/buildings13071796
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Nowadays, companies employ various project management (PM) methodologies to ensure that their projects are effective and successful. It is worth knowing that differences in principles and processes of PM methodologies influence the use of different PMs in managing non-repetitive and repetitive construction projects. This paper presents the selection and application of a rational construction PM methodology to a repetitive construction project after a comparison of two PM methodologies, namely Project Management Body of Knowledge (PMBOK) and Projects IN Controlled Environments (PRINCE2). The object of this study is a repetitive anti-corrosion works project for steel structures conducted at Company X. The research was carried out in two steps. First, a quantitative survey of the respondents from companies involved in the management and execution of construction projects was conducted with the aim to identify a rational approach to construction PM. The questionnaire consisted of fourteen closed-ended questions, six of which were generic and eight were PMBOK- and PRINCE2-specific questions. Companies that took part in the quantitative study identified the PRINCE2 project management approach as the most suitable for managing a repetitive construction project. Using the PRINCE2 PM methodology, the repetitive construction project would aim to provide as much information as possible to the project participants, form a team and assign team leaders responsible for the phases, establish a financial plan, a detailed timetable for the execution of the works, a quality control plan, and a plan of responsible persons, and detail the technological sequencing of the works. Second, a quantitative study on the selection of a rational construction project management approach for a repetitive construction project was pursued, and a qualitative assessment of construction project monitoring trends and actions was conducted. The qualitative research was performed using a structured interview method and asking the representatives of different companies X, Y, and Z the same 15 questions. The results of the qualitative research showed that a successful PM depends on the size of the project team, the PM tools and methodologies used, the PM philosophy, and the frequency of monitoring and discussing the project progress.
引用
收藏
页数:31
相关论文
共 64 条
[1]   Towards a New Paradigm of Project Management: A Bibliometric Review [J].
Aliu, John ;
Oke, Ayodeji Emmanuel ;
Kineber, Ahmed Farouk ;
Ebekozien, Andrew ;
Aigbavboa, Clinton Ohis ;
Alaboud, Naif Sultan ;
Daoud, Ahmed Osama .
SUSTAINABILITY, 2023, 15 (13)
[2]  
Alzwainy F., 2016, International Journal of Scientific and Engineering Research, V7, P244
[3]  
[Anonymous], 2017, Preparation of steel substrates before application of paints and related productsTests for the assessment of surface cleanlinessPart 3: Assessment of dust on steel surfaces prepared for painting (pressure-sensitive tape method)
[4]  
[Anonymous], 2012, 850322012 ISO
[5]  
[Anonymous], 2015, SSPCSP12015
[6]  
[Anonymous], 2018, D4285832018 ASTM
[7]  
[Anonymous], 2020, Standard Test Method for Conductimetric Analysis of Water Soluble Ionic Contamination of Blast Cleaning Abrasives
[8]  
[Anonymous], 1996, International journal of project management, DOI [DOI 10.1016/0263-7863(95)00057-7, 10.1016/0263-7863(95)00057-7]
[9]  
[Anonymous], 2017, 850242017 ISO
[10]  
[Anonymous], 2007, ISO 8501-1:2007