Short-term risk-management for hydro-wind-solar hybrid energy system considering hydropower part-load operating characteristics

被引:10
|
作者
Li, Xudong [1 ]
Yang, Weijia [1 ]
Liao, Yiwen [1 ]
Zhang, Shushu [2 ]
Zheng, Yang [3 ]
Zhao, Zhigao [1 ]
Tang, Maojia [1 ]
Cheng, Yongguang [1 ]
Liu, Pan [1 ]
机构
[1] Wuhan Univ, State Key Lab Water Resources Engn & Management, Wuhan 430072, Hubei, Peoples R China
[2] Swiss Fed Inst Technol Lausanne EPFL, Sch Architecture Civil & Environm Engn, Lausanne, Switzerland
[3] Wuhan Univ, Sch Power & Mech Engn, Wuhan 430072, Hubei, Peoples R China
基金
中国国家自然科学基金;
关键词
Hydro-wind-solar; Hydraulic; Part-load region; Risk; Uncertainty; Optimization; PUMPED-STORAGE; MODEL; REANALYSIS;
D O I
10.1016/j.apenergy.2024.122818
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Francis-type hydropower units operating in part-load region could lead to adverse effects such as decreased turbine efficiency and increased pressure pulsation amplitude. Nowadays, this type of hydropower units is frequently forced to operate in the part-load region due to their complementary operation with uncertain wind and solar power. This poses potential risk to hydro-wind-solar hybrid energy system (HWSHES). However, existing studies have not adequately addressed the risk of hydropower unit operating in part-load region and misestimate the ideal flexible operating range of units. To address the two issues, this work proposes a riskmanagement model for HWSHES considering the hydropower part-load operating characteristics, which is based on the framework of "risk recognition-evaluation-control": (1) Risk recognition: identify and quantify potential operation risk of both power source and power grid in HWSHES; and (2) Risk evaluation: build a triobjective short-term simulation scheduling model to evaluate power sources-power grid risks; (3) Risk control: design a three-stage optimization method for solving the model and effectively controlling risk. A case study of Wudongde hydropower plant, a key project of China's West-to-East power transmission project, in the Jinsha River Basin shows that: (1) The proposed model quantitatively identifies units' part-load risk distribution; (2) The uncertainty of wind and solar is prone to cause the risk of both power shortage and part-load operating in spring and winter; (3) A trade-off between power generation and risk is consistently observed throughout each season; and (4) Implementing the risk-management measures reduces the average part-load operating risk by 57.1% compared with no risk-management. In conclusion, this work contributes to enhancing the riskmanagement capabilities of large-scale HWSHES.
引用
收藏
页数:20
相关论文
共 31 条
  • [1] Part-load operation risk assessment of hydropower units in hydro-wind-solar hybrid system considering hydraulic characteristics
    Li, Xudong
    Yang, Weijia
    Wei, Jia
    Wang, Ran
    Liao, Yiwen
    ENERGY REPORTS, 2023, 9 : 332 - 342
  • [2] Part-load operation risk assessment of hydropower units in hydro-wind-solar hybrid system considering hydraulic characteristics
    Li, Xudong
    Yang, Weijia
    Wei, Jia
    Wang, Ran
    Liao, Yiwen
    ENERGY REPORTS, 2023, 9 : 332 - 342
  • [3] Part-load operation risk assessment of hydropower units in hydro-wind-solar hybrid system considering hydraulic characteristics
    Li, Xudong
    Yang, Weijia
    Wei, Jia
    Wang, Ran
    Liao, Yiwen
    ENERGY REPORTS, 2023, 9 : 332 - 342
  • [4] Short-term coordinated hybrid hydro-wind-solar optimal scheduling model considering multistage section restrictions
    Liu, Benxi
    Liu, Tengyuan
    Liao, Shengli
    Lu, Jia
    Cheng, Chuntian
    RENEWABLE ENERGY, 2023, 217
  • [5] Short-term optimal operation of hydro-wind-solar hybrid system with improved generative adversarial networks
    Wei, Hu
    Zhang Hongxuan
    Yu, Dong
    Wang Yiting
    Ling, Dong
    Ming, Xiao
    APPLIED ENERGY, 2019, 250 : 389 - 403
  • [6] Short-term peak-shaving scheduling of a hydropower-dominated hydro-wind-solar photovoltaic hybrid system considering a shared multienergy coupling transmission channel
    Zhao, Hongye
    Liao, Shengli
    Ma, Xiangyu
    Fang, Zhou
    Cheng, Chuntian
    Zhang, Zheng
    APPLIED ENERGY, 2024, 372
  • [7] Research on short-term joint optimization scheduling strategy for hydro-wind-solar hybrid systems considering uncertainty in renewable energy generation
    Li, Fugang
    Chen, Shijun
    Ju, Chengqian
    Zhang, Xinshuo
    Ma, Guangwen
    Huang, Weibin
    ENERGY STRATEGY REVIEWS, 2023, 50
  • [8] Developing operating rules for a hydro-wind-solar hybrid system considering peak-shaving demands
    Wang, Jin
    Zhao, Zhipeng
    Zhou, Jinglin
    Cheng, Chuntian
    Su, Huaying
    APPLIED ENERGY, 2024, 360
  • [9] Short-term optimal operation of wind-solar-hydro hybrid system considering uncertainties
    Zhang, Zhendong
    Qin, Hui
    Li, Jie
    Liu, Yongqi
    Yao, Liqiang
    Wang, Yongqiang
    Wang, Chao
    Pei, Shaoqian
    Zhou, Jianzhong
    ENERGY CONVERSION AND MANAGEMENT, 2020, 205 (205)
  • [10] Research on short-term optimal scheduling of hydro-wind-solar multi-energy power system based on deep reinforcement learning
    Jiang, Wenyuan
    Liu, Yongqiang
    Fang, Guohua
    Ding, Ziyu
    JOURNAL OF CLEANER PRODUCTION, 2023, 385