Expert studies on the impact of risk on the life cycle costs of buildings

被引:2
作者
Wieczorek, Damian [1 ]
Zima, Krzysztof [1 ]
Plebankiewicz, Edyta [1 ]
机构
[1] Cracow Univ Technol, Fac Civil Engn, Warszawska St 24, PL-31155 Krakow, Poland
关键词
life cycle; life cycle costs; risk; risk identification; risk quantification; risk management; CONSTRUCTION PROJECTS; FUZZY; IMPLEMENTATION;
D O I
10.24425/ace.2023.147650
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The main goal of the studies was to collect information on the impact of the identified risk factors on the amount of costs incurred in the life cycle of buildings. The own studies were focused especially on residential and non-residential buildings. The studies consisted in obtaining expert opinions on the subject of the research involves in the non-random (arbitrary) selection of a sample of respondents from among specialists corresponding to the industry purpose of the studies and the research material. The research used the expert questionnaire method. The studies were divided into three stages. In the first stage, the identification and division of risk factors in the life cycle of buildings was performed. Then, experts assessed 45 selected risk factors that may affect the amount of costs incurred in the life cycle of buildings. In the last step, the research results were developed in the form of a checklist knowledge base, containing information about the potential impact of the identified risk factors in the life cycle of buildings on the amount of the corresponding components of life cycle costs.
引用
收藏
页码:105 / 123
页数:19
相关论文
共 32 条
  • [1] [Anonymous], 2007, Regulation of the Council of Ministers of 24 December 2007 on the Polish Classification of Activities (PKD)
  • [2] [Anonymous], 2017, ISO 15686 52017 BUIL
  • [3] 7-Score Function for Assessing the Strength of Association Rules Applied for Construction Risk Quantifying
    Anysz, Hubert
    Roslon, Jerzy
    Foremny, Andrzej
    [J]. APPLIED SCIENCES-BASEL, 2022, 12 (02):
  • [4] Baccarini D., 2001, INT J PROJ MANAG, V19, P139, DOI [DOI 10.1016/S0263-7863(99)00074-5, 10.1016/S0263-7863(99)00074-5]
  • [5] Baloi D., 2003, International Journal of Project Management, V21, P261, DOI 10.1016/S0263-7863(02)00017-0
  • [7] Ibadov N, 2016, ACTA PHYS POL A, V130, P107, DOI [10.12693/APhysPolA.130.107, 10.12693/APhysPolA.129.107]
  • [8] Fuzzy Ordering of the Factors Affecting the Implementation of Construction Projects in Poland
    Ibadov, Nabi
    Kulejewski, Janusz
    Krzeminski, Michal
    [J]. 11TH INTERNATIONAL CONFERENCE OF NUMERICAL ANALYSIS AND APPLIED MATHEMATICS 2013, PTS 1 AND 2 (ICNAAM 2013), 2013, 1558 : 1298 - 1301
  • [9] Risk assessment for tram traffic on tramway bridges
    Jamroz, Kazimierz
    Grulkowski, Slawomir
    Birr, Krystian
    Jelinski, Lukasz
    Budzynski, Marcin
    [J]. ARCHIVES OF CIVIL ENGINEERING, 2021, 67 (04) : 39 - 58
  • [10] PLANNING REPETITIVE CONSTRUCTION PROCESSES TO IMPROVE ROBUSTNESS OF SCHEDULES IN RISK ENVIRONMENT
    Jaskowski, P.
    Biruk, S.
    Krzeminski, M.
    [J]. ARCHIVES OF CIVIL ENGINEERING, 2020, 66 (03) : 643 - 657