Causes and Impacts of Delays in Ethiopian Public Construction Projects (Case on Debre Markos University Construction Projects)

被引:2
|
作者
Demissew, Abebe [1 ]
Abiy, Fasika [1 ]
机构
[1] Debre Markos Univ, Inst Technol, Construct Technol & Management Dept, POB 269, Debre Markos, Ethiopia
关键词
D O I
10.1155/2023/6577676
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The construction project is regarded successful when it is given over to the owner within the time, cost, and standards necessary while minimizing delays in public construction projects. Debre Markos University (DMU) is one of the public universities undergoing massive development projects that are experiencing significant delays. This article evaluates the most prevalent delay issues encountered by Ethiopian government-funded construction projects, particularly those using DMU, analyzes their impacts, and suggests a delay management system. The study applied qualitative as well as quantitative techniques to evaluate primary and secondary data. Per the entirety statistics, the top five most important and highly ranked factors are erroneous time estimates, force majeure, lowest bid, procurement policy, and volatile markets, as well as frequent design changes. Nearly every DMU project schedule overruns up to 268.67% of its contract duration. As a result, the institution suffered from poor public relations and a high cost of supervision and contract administration (6.87% of the overall project cost). Conducting a thorough and accurate project feasibility study, awarding bids to experienced contractors, avoiding drawing discrepancies, preparing an accurate initial time and cost estimate, and strict schedule monitoring were discovered to be effective techniques for reducing delays in public construction projects.
引用
收藏
页数:14
相关论文
共 50 条
  • [1] Delays in construction projects - Causes and impacts
    Arantes, Amlcar
    da Silva, Pedro Fernandez
    Ferreira, Luis Miguel D. F.
    2015 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND SYSTEMS MANAGEMENT (IESM), 2015, : 1105 - 1110
  • [2] Causes and impacts of public construction projects' contract terminations
    Habetemeherit, Anteneh Birhanu
    Mengistu, Desalegn Girma
    Sorsa, Fiseha Tarekegn
    Tesfaye, Bitseat Zeleke
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2025,
  • [3] CAUSES OF DELAYS IN IRANIAN CONSTRUCTION PROJECTS
    Khoshgoftar, Mohammad
    Abu Bakar, Abu Hassan
    Osman, Omar
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2010, 10 (02) : 53 - 69
  • [4] CAUSES OF DELAYS IN CONSTRUCTION PROJECTS IN TURKEY
    Kazaz, Aynur
    Ulubeyli, Serdar
    Tuncbilekli, Nihan Avcioglu
    JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2012, 18 (03) : 426 - 435
  • [5] Construction projects: interactions of the causes of delays
    Purushothaman, Mahesh Babu
    San Pedro, Leo Neil Resurreccion
    GhaffarianHoseini, Ali
    SMART AND SUSTAINABLE BUILT ENVIRONMENT, 2024,
  • [6] Causes of delays in Saudi Arabian public sector construction projects
    Al-Kharashi, Adel
    Skitmore, Martin
    CONSTRUCTION MANAGEMENT AND ECONOMICS, 2009, 27 (01) : 3 - 23
  • [7] Causes of Construction Projects Delays: A qualitative analysis
    Rudeli, N.
    Viles, E.
    Gonzalez, J.
    Santilli, A.
    MEMORIA INVESTIGACIONES EN INGENIERIA, 2018, (16): : 71 - 84
  • [8] Causes of schedule delays in construction projects in Algeria
    Rachid, Zemra
    Toufik, Boudouh
    Mohammed, Baheddi
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2019, 19 (05) : 371 - 381
  • [9] Causes of delays on construction projects: a comprehensive list
    Durdyev, Serdar
    Hosseini, M. Reza
    INTERNATIONAL JOURNAL OF MANAGING PROJECTS IN BUSINESS, 2019, 13 (01) : 20 - 46
  • [10] Causes of delays in road construction projects: a systematic review
    Kumar, Modish
    Kumari, Santosh
    JOURNAL OF FINANCIAL MANAGEMENT OF PROPERTY AND CONSTRUCTION, 2025,