共 6 条
- [1] Analysis and Simulated Experiment for Port Disturbance Voltage Due to Switching Operation in GIS Substation Gaodianya Jishu/High Voltage Engineering, 2017, 43 (10): : 3387 - 3395
- [2] Fast Transient Overvoltage Analysis in Current Transformers due to Disconnector Switching Operation 2022 7TH INTERNATIONAL ADVANCED RESEARCH WORKSHOP ON TRANSFORMERS (ARWTR 2022), 2022, : 58 - 63
- [3] Numerical calculation of grounding current through Capacitive Voltage Transformer due to substation switching operation 2006 IEEE INTERNATIONAL SYMPOSIUM ON ELECTROMAGNETIC COMPATIBILITY, VOLS 1-3, PROCEEDINGS, 2006, : 518 - 521
- [5] Operation analysis of spare power automatic switch device after 110 kV circuit breaker manually opening in Luojiazhuang transformer substation Dianli Xitong Baohu yu Kongzhi/Power System Protection and Control, 2010, 38 (05): : 141 - 142
- [6] Measurement and Analysis of Electromagnetic Disturbance at the Secondary Side of Electronic Voltage Transformer Due to Switching Operations Via a 6 kv Switchgear 2017 IEEE 5TH INTERNATIONAL SYMPOSIUM ON ELECTROMAGNETIC COMPATIBILITY (EMC-BEIJING), 2017,