Structural model of cost overrun factors affecting Pakistani construction projects

被引:1
作者
Memon, Aftab Hameed [1 ]
Memon, Abdul Qadir [1 ]
Memon, Muneeb Ayub [1 ]
Sahito, Jam Shahzeb Khan [1 ]
机构
[1] Quaid Awam Univ Engn Sci & Technol, Dept Civil Engn, Nawabshah, Pakistan
关键词
Cost Performance; Cost Overruns; Construction; PLS-SEM Structural Equation; Modeling; Pakistan; INFRASTRUCTURE PROJECTS; DELAYS; INDUSTRY; TIME;
D O I
10.22581/muet1982.2302.12
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Cost overruns are a global challenge to successfully completing construction projects. Cost overrun has a substantial impact resulting in most construction projects failing to be completed. Several factors have contributed significantly to the industry's decline. The factors were discovered in the literature, assessed, and applied to the construction industry in Pakistan. This study scrutinized and identified the relationships between the factors causing cost overruns in the Pakistani construction industry using the Partial Least Squares Structural Equation Modelling (PLS-SEM) approach. The structural model was created and tested with Smart-PLS software using data from a questionnaire survey of 131 construction practitioners. Six constructs were used to categorize the factors. The model identifies 21 critical factors in Pakistani construction projects, with resource management ranking first. Contract management issues can also contribute significantly to project cost overruns. Model assessment results indicate that the developed model has a substantial power of explaining the factors of cost performance while R2 value showed that 45.7% variance is explained by the model. The model developed model will serve as a jumping-off point for academics, researchers, and practitioners in developing a cost-control system. It is suggested that establishing an efficient and effective contract management protocol among stakeholders throughout the design and supervision stages is extremely beneficial for improving project cost performance and significantly reducing time overruns.
引用
收藏
页码:108 / 123
页数:16
相关论文
共 77 条
[41]  
IQBAL A., 2019, Pakistan Journal of Engineering and Technology, V2, P22
[42]   Time and cost overruns in the UAE construction industry: a critical analysis [J].
Johnson, Reshma Mary ;
Babu, Robin Itty Ipe .
INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2020, 20 (05) :402-411
[43]   Cost escalation and schedule delays in road construction projects in Zambia [J].
Kaliba, Chabota ;
Muya, Mundia ;
Mumba, Kanyuka .
INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2009, 27 (05) :522-531
[44]  
Kamaruddeen A. M., 2020, Civil Engineering and Architecture, V8, P191, DOI [10.13189/cea.2020.080301, DOI 10.13189/CEA.2020.080301]
[45]   Modeling the Factors Enhancing the Implementation of Green Procurement in the Pakistani Construction Industry [J].
Khahro, Shabir Hussain ;
Memon, Aftab Hameed ;
Memon, Nafees Ahmed ;
Arsal, Ali ;
Ali, Tauha Hussain .
SUSTAINABILITY, 2021, 13 (13)
[46]   Delays and cost increases in the construction of private residential projects in Kuwait [J].
Koushki, P. A. ;
Al-Rashid, K. ;
Kartam, N. .
CONSTRUCTION MANAGEMENT AND ECONOMICS, 2005, 23 (03) :285-294
[47]  
Latif Y., 2008, P CIB INT C BUILD RE, P125
[48]   Delay and Cost Overruns in Vietnam Large Construction Projects: A Comparison with Other Selected Countries [J].
Le-Hoai, Long ;
Lee, Young Dai ;
Lee, Jun Yong .
KSCE JOURNAL OF CIVIL ENGINEERING, 2008, 12 (06) :367-377
[49]   Empirical Bid or No Bid Decision Process in International Construction Projects: Structural Equation Modeling Framework [J].
Li Guanghua ;
Zhang Guomin ;
Chen Chuan ;
Martek, Igor .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2020, 146 (06)
[50]  
Liu J., 2017, Journal of Construction Engineering and Management, ASCE, USA, vol, V143