Structural model of cost overrun factors affecting Pakistani construction projects

被引:1
作者
Memon, Aftab Hameed [1 ]
Memon, Abdul Qadir [1 ]
Memon, Muneeb Ayub [1 ]
Sahito, Jam Shahzeb Khan [1 ]
机构
[1] Quaid Awam Univ Engn Sci & Technol, Dept Civil Engn, Nawabshah, Pakistan
关键词
Cost Performance; Cost Overruns; Construction; PLS-SEM Structural Equation; Modeling; Pakistan; INFRASTRUCTURE PROJECTS; DELAYS; INDUSTRY; TIME;
D O I
10.22581/muet1982.2302.12
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Cost overruns are a global challenge to successfully completing construction projects. Cost overrun has a substantial impact resulting in most construction projects failing to be completed. Several factors have contributed significantly to the industry's decline. The factors were discovered in the literature, assessed, and applied to the construction industry in Pakistan. This study scrutinized and identified the relationships between the factors causing cost overruns in the Pakistani construction industry using the Partial Least Squares Structural Equation Modelling (PLS-SEM) approach. The structural model was created and tested with Smart-PLS software using data from a questionnaire survey of 131 construction practitioners. Six constructs were used to categorize the factors. The model identifies 21 critical factors in Pakistani construction projects, with resource management ranking first. Contract management issues can also contribute significantly to project cost overruns. Model assessment results indicate that the developed model has a substantial power of explaining the factors of cost performance while R2 value showed that 45.7% variance is explained by the model. The model developed model will serve as a jumping-off point for academics, researchers, and practitioners in developing a cost-control system. It is suggested that establishing an efficient and effective contract management protocol among stakeholders throughout the design and supervision stages is extremely beneficial for improving project cost performance and significantly reducing time overruns.
引用
收藏
页码:108 / 123
页数:16
相关论文
共 77 条
[1]  
Abderisak A., 2014, PROCEEDING 19 INT S
[2]  
Ahmad N.A., 2019, Cost Overruns on Federal Capital Territory Authority Road Construction Projects, V13, P1
[3]   Structural equation modelling of organizational justice and cooperative behaviour in the construction project claims process: contractors' perspectives [J].
Aibinu, Ajibade Ayodeji ;
Ling, Florence Yean Yng ;
Ofori, George .
CONSTRUCTION MANAGEMENT AND ECONOMICS, 2011, 29 (05) :463-481
[4]   Using PLS-SEM technique to model construction organizations' willingness to participate in e-bidding [J].
Aibinu, Ajibade Ayodeji ;
Al-Lawati, Ahmed Murtadha .
AUTOMATION IN CONSTRUCTION, 2010, 19 (06) :714-724
[5]  
Akinradewo O., 2019, IOP Conference Series: Materials Science and Engineering, V640, DOI 10.1088/1757-899X/640/1/012002
[6]   Trustworthiness in mHealth Information Services: An Assessment of a Hierarchical Model with Mediating and Moderating Effects Using Partial Least Squares (PLS) [J].
Akter, Shahriar ;
D'Ambra, John ;
Ray, Pradeep .
JOURNAL OF THE AMERICAN SOCIETY FOR INFORMATION SCIENCE AND TECHNOLOGY, 2011, 62 (01) :100-116
[7]   Towards a sustainable construction industry: Delays and cost overrun causes in construction projects of Oman [J].
Al Amri, Tariq ;
Marey-Perez, Manuel .
JOURNAL OF PROJECT MANAGEMENT, 2020, 5 (02) :87-102
[8]   Delay and Cost Overrun in Infrastructure Projects in Jordan [J].
Al-Hazim, Nabil ;
Abu Salem, Zaydoun ;
Ahmad, Hesham .
7TH INTERNATIONAL CONFERENCE ON ENGINEERING, PROJECT, AND PRODUCTION MANAGEMENT, 2017, 182 :18-24
[9]  
Albtoush A. M. Faten, 2021, IOP Conference Series: Earth and Environmental Science, V682, DOI 10.1088/1755-1315/682/1/012019
[10]  
Alghonamy A., 2015, International Journal of Engineering Technology, IJET-IJENS, V15, P35