An integrated fuzzy MCDM model for prioritizing strategies for successful implementation and operation of the bus rapid transit system

被引:24
作者
Bouraima, Mouhamed Bayane [1 ,2 ,3 ]
Tengecha, Nyamatari Anselem [4 ]
Stevic, Zeljko [5 ]
Simic, Vladimir [6 ]
Qiu, Yanjun [1 ,2 ]
机构
[1] Southwest Jiaotong Univ, Sch Civil Engn, Chengdu 610031, Sichuan, Peoples R China
[2] Southwest Jiaotong Univ, Highway Engn Key Lab Sichuan Prov, Chengdu 610031, Sichuan, Peoples R China
[3] Org African Acad Doctors OAAD, POB 1483300100, Nairobi 00100, Kenya
[4] Trans Res Africa Ltd, POB 12105, Dar Es Salaam, Tanzania
[5] Univ East Sarajevo, Fac Transport & Traff Engn, Doboj, Bosnia & Herceg
[6] Univ Belgrade, Fac Transport & Traff Engn, Vojvode Stepe 305, Belgrade 11010, Serbia
关键词
Dar es Salaam; BRT; MARCOS; IMF SWARA; Operation; Implementation; AFRICAN CITIES; SOUTH-AFRICAN; LIGHT-RAIL; IMF SWARA; SELECTION; SAFETY; ALGORITHM; DISTANCE; EQUITY; IMPACT;
D O I
10.1007/s10479-023-05183-y
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
The selection and prioritization of suitable strategies to address the challenges to the successful operation and implementation of the bus rapid transit (BRT) system is a common problem faced by practitioners and decision-makers. Recent research has widely discussed the issue, but such assessments have remained limited in the city of Dar es Salaam, Tanzania context, where there are mobility difficulties. The present study addresses this research gap and identifies the most critical challenges to BRT implementation and operation, and recommends the most appropriate strategy for overcoming them. Seven strategies are defined. To prioritize these strategies, five criteria are determined. An integrated multi-criteria decision-making model is introduced. Improved Fuzzy Step-Wise Weight Assessment Ratio Analysis based on the Bonferroni operator was used to determine the importance of the criteria. Measurement of alternatives and ranking according to compromise solution was applied to assess and rank the strategies. The results indicate that "frequent flooding at the Jangwani bridge bus terminal" and "long waiting time at bus stops" are the most critical challenges while the fourth alternative "strengthening the operation and management" is the appropriate strategy to be implemented for successful operation and implementation of the BRT system. After that, a five-phase sensitivity analysis is performed to observe the robustness of the proposed approach. The results indicate the flexibility and applicability of the proposed approach can address real-life problems. The proposed methodology in this work can be instrumental in assisting mass transit operators with the successful implementation and operation of the BRT system.
引用
收藏
页码:141 / 172
页数:32
相关论文
共 104 条
[61]   Developing an Extenics-Based Model for Evaluating Bus Transit System [J].
Liu, Yufeng ;
Chien, Steven ;
Hu, Dawei ;
Wang, Ning ;
Zhang, Rui .
JOURNAL OF ADVANCED TRANSPORTATION, 2020, 2020
[62]   Prevailing user's factors in bus rapid transport stations located in high-traffic urban highways [J].
Lopes, Priscila ;
Thives, Liseane Padilha ;
Kraus Junior, Werner .
CASE STUDIES ON TRANSPORT POLICY, 2022, 10 (01) :710-722
[63]   COMPARISON BETWEEN BUS RAPID TRANSIT AND LIGHT-RAIL TRANSIT SYSTEMS: A MULTI-CRITERIA DECISION ANALYSIS APPROACH [J].
Lopez Lambas, Maria Eugenia ;
Giuffrida, Nadia ;
Ignaccolo, Matteo ;
Inturri, Giuseppe .
URBAN TRANSPORT XXIII, 2018, 176 :143-154
[64]   Scenario-Based Multi-criteria decision analysis for rapid transit systems implementation in an urban context [J].
Manzolli, Jonatas Augusto ;
Trovao, Joao Pedro ;
Antunes, Carlos Henggeler .
ETRANSPORTATION, 2021, 7
[65]  
Matata F., 2017, TRANSP RES BOARDS 96
[66]   Intelligent Novel IMF D-SWARA-Rough MARCOS Algorithm for Selection Construction Machinery for Sustainable Construction of Road Infrastructure [J].
Matic, Bojan ;
Marinkovic, Milan ;
Jovanovic, Stanislav ;
Sremac, Sinisa ;
Stevic, Zeljko .
BUILDINGS, 2022, 12 (07)
[67]   Bus rapid transit (BRT): A simulation and multi criteria decision making (MCDM) approach [J].
Mavi, Reza Kiani ;
Zarbakhshnia, Navid ;
Khazraei, Armin .
TRANSPORT POLICY, 2018, 72 :187-197
[68]   Cost, reliability, convenience, equity or image? The cases for and against the introduction of light rail and bus rapid transit in inners suburban Adelaide, South Australia [J].
McGreevy, Michael .
CASE STUDIES ON TRANSPORT POLICY, 2021, 9 (01) :271-279
[69]  
McLachlan N., 2010, CODATU 14 25 27 OCT
[70]  
Mobereola, 2009, SUBSAHARAN AFRICA TR