Simulation of construction project management system by using visualization technology and improvement algorithm

被引:0
作者
Huang, XiangXiang [1 ]
Liang, Ming [2 ]
机构
[1] Shangluo Univ, Coll Urban Rural Planning & Architectural Engn, Shangluo 726000, Shaanxi, Peoples R China
[2] Jinghe Ind Dev Co Ltd, Xian 710000, Shaanxi, Peoples R China
关键词
BIM; Machine learning; Construction project management; Visualization;
D O I
10.1007/s00500-023-08869-4
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
Currently, various fields are rapidly developing, and the construction industry belongs to one of the traditional industries. Various business projects of various construction enterprises are also constantly developing rapidly and gradually expanding and increasing. Therefore, it is necessary to implement scientific and information-based management for each project, especially for some ongoing projects, carrying out scientific, rational, and standardized management has very important practical significance. Developing a visual system for construction project management has played a very important role in the development of the enterprise and project management. This article will take the construction project as the goal, visualize its engineering management as the starting point, and systematically analyze and design the proposed business requirements, in order to achieve the goal of implementation. In the process of designing the system, this article strictly follows relevant regulations and processes for implementation. Firstly, conduct feasibility analysis before and after designing the system. Then, conduct multiple experimental tests on the designed system. Finally, all issues identified during testing will be resolved and put into use. This article applies machine learning algorithms to this design. The successfully designed system is relatively complete in terms of functionality, simple and convenient in operation interface, and has fast running speed and certain security guarantees. The relevant requirements for various types of enterprises in the management of construction projects can be well met.
引用
收藏
页数:10
相关论文
共 16 条
  • [1] Challenging construction project management institutions: the role and agency of BIM actors
    Bosch-Sijtsema, Petra
    Gluch, Pernilla
    [J]. INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2019, : 1077 - 1087
  • [2] Impact of integration management on construction project management performance
    Demirkesen, Sevilay
    Ozorhon, Beliz
    [J]. INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2017, 35 (08) : 1639 - 1654
  • [3] A GIS-BASED VISUAL INFORMATION MODEL FOR BUILDNG CONSTRUCTION PROJECT MANAGEMENT
    Dib, Hazar
    Adamo-Villani, Nicoletta
    Issa, Raja R. A.
    [J]. INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2013, 13 (01) : 1 - 18
  • [4] Hada Y, 2017, J DISASTER RES, V12, P593, DOI 10.20965/jdr.2017.p0593
  • [5] Hsieh J., 2019, White Paper (JB68676XX)
  • [6] From 3D modeling to 3D printing: Development of a differentiated spatial ability teaching model
    Huang, Tien-Chi
    Lin, Chun-Yu
    [J]. TELEMATICS AND INFORMATICS, 2017, 34 (02) : 604 - 613
  • [7] Huang X., 2022, Optik (Stuttg), DOI [10.1016/j.ijleo.2022.170460, DOI 10.1016/J.IJLEO.2022.170460]
  • [8] CasCADe: A Novel 4D Visualization System for Virtual Construction Planning
    Ivson, Paulo
    Nascimento, Daniel
    Celes, Waldemar
    Barbosa, Simone D. J.
    [J]. IEEE TRANSACTIONS ON VISUALIZATION AND COMPUTER GRAPHICS, 2018, 24 (01) : 687 - 697
  • [9] DCOPF-based LMP simulation: Algorithm, comparison with ACOPF, and sensitivity
    Li, Fangxing
    Bo, Rui
    [J]. IEEE TRANSACTIONS ON POWER SYSTEMS, 2007, 22 (04) : 1475 - 1485
  • [10] A ROBUST TIME-COST-QUALITY-ENERGY-ENVIRONMENT TRADE-OFF WITH RESOURCE-CONSTRAINED IN PROJECT MANAGEMENT: A CASE STUDY FOR A BRIDGE CONSTRUCTION PROJECT
    Lotfi, Reza
    Yadegari, Zahra
    Hosseini, Seyed Hossein
    Khameneh, Amir Hossein
    Tirkolaee, Erfan Babaee
    Weber, Gerhard-Wilhelm
    [J]. JOURNAL OF INDUSTRIAL AND MANAGEMENT OPTIMIZATION, 2022, 18 (01) : 375 - 396