Impact of project risk allocation on PPP housing project delivery in Nigeria: partial least square structural equation modeling approach

被引:0
作者
Arijeloye, Bamidele Temitope [1 ]
机构
[1] Fed Univ Technol Akure, Dept Quant Surveying, Akure, Nigeria
关键词
Public-private partnership (PPP); Mass housing projects; Structural equation model; PPP risks; PPP risk allocation principles; CONSTRUCTION; PERCEPTION;
D O I
10.1108/JEDT-07-2023-0304
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
PurposeThis paper aims to help understand how adopting risk allocation criteria impacts the delivery of public-private partnership (PPP) mass housing in Nigeria with the view of promoting the adoption of PPP housing scheme in Nigeria.Design/methodology/approachThe research design adopts the census sampling approach by using well-structured questionnaires distributed to stakeholders involved in PPP-procured mass housing projects, i.e. consultants, in-house professionals, contractors and the organized private sector, registered with PPP departments in the Federal Capital Territory Development Authority, Abuja, Nigeria. Sixty-three risk factors, nine risk allocation criteria and nine project delivery indices were submitted for the respondents to rank on a Likert scale of 7. Two hypotheses were formulated to test whether the risk allocation criteria impacted PPP mass housing delivery or otherwise. The study adopts partial least square-structural equation modeling to model the effect of risk on risk allocation criteria on project delivery indices and risk severity.FindingsThe finding shows that project risk allocation criteria have less effect on project delivery indices than on risk severity. The study concludes that risk allocation principles do not directly affect the delivery of PPP-procured mass housing projects. This is evident by the path coefficient of 0.724 values, which is not statistically significant at a 5% alpha protection value. The study concludes that allocating critical risk factors influences the performance of PPP-procured mass housing projects, as the path coefficient of 0.360 is also not significantly far from 0 and at a 5% alpha protection value.Originality/valueThe study is one of the recent studies conducted in PPP-procured mass housing projects in Nigeria owing to the novelty of procurement option in the sector. It highlights the risk factors that can jeopardize the PPP-procured mass housing project objectives. The study is of immense value to PPP actors in the sector by providing the necessary information required to formulate risk response methods to minimize the impact of the risk factors in PPP mass housing projects.
引用
收藏
页码:812 / 829
页数:18
相关论文
共 43 条
[1]   Objectives, success and failure factors of housing public-private partnerships in Malaysia [J].
Abdul-Aziz, A. -R. ;
Kassim, P. S. Jahn .
HABITAT INTERNATIONAL, 2011, 35 (01) :150-157
[2]  
Ahadzie D. K., 2008, International Journal of Project Management, V26, P675, DOI 10.1016/j.ijproman.2007.09.006
[3]  
Ameyaw E.E., 2015, THESIS HONG KONG POL
[4]   Evaluation and ranking of risk factors in public-private partnership water supply projects in developing countries using fuzzy synthetic evaluation approach [J].
Ameyaw, Effah Ernest ;
Chan, Albert P. C. .
EXPERT SYSTEMS WITH APPLICATIONS, 2015, 42 (12) :5102-5116
[5]   A Fuzzy Approach for the Allocation of Risks in Public-Private Partnership Water-Infrastructure Projects in Developing Countries [J].
Ameyaw, Ernest Effah ;
Chan, Albert P. C. .
JOURNAL OF INFRASTRUCTURE SYSTEMS, 2016, 22 (03)
[6]   Evaluation of the impact of risk management on project performance in small construction firms in South Africa The case study of construction systems [J].
Amoah, Christopher ;
Pretorius, Leon .
JOURNAL OF ENGINEERING DESIGN AND TECHNOLOGY, 2019, 18 (03) :611-634
[7]  
Arijeloye B.T., 2023, WORLD J CIVIL ENG AR, V2, P86
[8]   Evaluating the key risk factors in PPP-procured mass housing projects in Nigeria: a Delphi study of industry experts [J].
Arijeloye, Bamidele Temitope ;
Aje, Isaac Olaniyi ;
Oke, Ayodeji Emmanuel .
JOURNAL OF ENGINEERING DESIGN AND TECHNOLOGY, 2024, 22 (01) :60-76
[9]   A review of risk management process in construction projects of developing countries [J].
Bahamid, R. A. ;
Doh, S. I. .
GLOBAL CONGRESS ON CONSTRUCTION, MATERIAL AND STRUCTURAL ENGINEERING 2017 (GCOMSE2017), 2017, 271
[10]  
Barnes M., 1983, International Journal of Project Management, V1, P24, DOI DOI 10.1016/0263-7863(83)90034-0