Optimal pricing and financing strategies for leased equipment considering maintenance and lessees' options

被引:4
|
作者
Liu, Yanping [1 ]
Liu, Biyu [1 ,2 ]
Yang, Haidong [1 ]
机构
[1] Fuzhou Univ, Sch Econ & Management, Fuzhou, Peoples R China
[2] Fuzhou Univ, Logist Res Ctr, Fujian Social Sci Res Base, Fuzhou, Peoples R China
基金
中国国家自然科学基金;
关键词
Pricing and financing; Lessees' options; Leasing; Preventive maintenance; Game-theoretic; CONSTRAINED SUPPLY CHAIN; POLICIES; NEWSVENDOR; MODELS; BANK;
D O I
10.1016/j.ijpe.2024.109157
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Periodic payment for leased equipment may lead to capital constraint for lessors. In view of preventive maintenance (PM) strategy and lessees' options, the impact of different financing modes on lessor's pricing decisionmaking for leased equipment is studied. By considering the impact of age and usage on PM strategy and lessees' revenue, and lessees -different options to return, renew or purchase leased equipment after the lease expires, a game -theoretic model with respect to advance payment, bank loan and mixed financing modes is presented. The lessor's optimal pricing and financing strategies, as well as lessees' options are obtained by using noncooperative game, cooperative game and transfer -payment contract. The results show: (1) with the increase of bargaining level, the periodic rental price decreases; Under non -cooperative game, lessees renew the equipment first and then purchase it, while under cooperative game lessees always renew the lease. The lessor can motivate lessees to participate in cooperation through appropriate transfer -payment contract; (2) as the advance payment discount increases, the lessor shifts from advance payment to bank loan financing mode under non -cooperative game, while always adopts a financing mode including advance payment under cooperative game. Both leasing parties accept the advance payment financing mode only when the advance payment discount is within a certain range; (3) the increased usage of leased equipment brings larger PM and corrective maintenance (CM) burden to the lessor, which affects lessees' options and both leasing parties' profits. The lessor shall measure the PM and CM costs of leased equipment to maximize the profit.
引用
收藏
页数:14
相关论文
共 21 条
  • [1] Optimal pricing and inventory strategies for leased equipment considering lessees' options
    Liu, Yanping
    Liu, Biyu
    Yang, Haidong
    Luo, Kai
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2024, 62 (19) : 7261 - 7278
  • [2] Optimal imperfect maintenance strategy for leased equipment
    Ben Mabrouk, A.
    Chelbi, A.
    Radhoui, M.
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2016, 178 : 57 - 64
  • [3] Optimal maintenance policy for equipment leased with base and extended warranty
    Ben Mabrouk, Amel
    Chelbi, Anis
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2023, 61 (03) : 898 - 909
  • [4] Optimal preventive maintenance of leased equipment with corrective minimal repairs
    Jaturonnatee, J.
    Murthy, D. N. P.
    Boondiskulchok, R.
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2006, 174 (01) : 201 - 215
  • [5] Optimal hybrid imperfect preventive maintenance policy for leased equipment
    Ben Mabrouk, A.
    Chelbi, A.
    Radhoui, M.
    IFAC PAPERSONLINE, 2017, 50 (01): : 13698 - 13703
  • [6] Optimal preventive maintenance policy for leased equipment using failure rate reduction
    Yeh, Ruey Huei
    Kao, Kow-Chin
    Chang, Wen Liang
    THIRTEENTH ISSAT INTERNATIONAL CONFERENCE ON RELIABILITY AND QUALITY IN DESIGN, PROCEEDINGS, 2007, : 142 - +
  • [7] Optimal imperfect preventive maintenance policy for equipment leased during successive periods
    Ben Mabrouk, A.
    Chelbi, A.
    Radhoui, M.
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2016, 54 (17) : 5095 - 5110
  • [8] Optimal preventive maintenance policy for leased equipment using failure rate reduction
    Yeh, Ruey Huei
    Kao, Kow-Chin
    Chang, Wen Liang
    COMPUTERS & INDUSTRIAL ENGINEERING, 2009, 57 (01) : 304 - 309
  • [9] Optimal Maintenance of Substation Equipment by Considering Maintenance Cost and Reliability
    Sudket, Navapol
    Chaitusaney, Surachai
    2014 11TH INTERNATIONAL CONFERENCE ON ELECTRICAL ENGINEERING/ELECTRONICS, COMPUTER, TELECOMMUNICATIONS AND INFORMATION TECHNOLOGY (ECTI-CON), 2014,
  • [10] Multi-phase preventive maintenance strategy for leased equipment considering usage rate variation
    Liu, Biyu
    Chen, Ting
    Yang, Haidong
    Zhang, Liangwei
    COMPUTERS & INDUSTRIAL ENGINEERING, 2023, 185