Impact Factors on Subcontractor's Cash Flow Management

被引:3
作者
Youssef, Medhat A. [1 ]
Ibrahim, Ahmed H. [1 ]
Hafez, M. El-Sayed El-Badawy [1 ]
机构
[1] Zagazig Univ, Construct Engn & Util Dept, Zagazig, Egypt
来源
CIVIL ENGINEERING JOURNAL-TEHRAN | 2023年 / 9卷
关键词
Cash Flow; Construction Industry; Subcontractor's Firms; Subcontracting Contracts; Construction Projects; CONSTRUCTION; MODEL;
D O I
10.28991/CEJ-SP2023-09-08
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Objective: This study aims to define how to maintain and protect the subcontractor firms' cash flow from economic fluctuation through legally sustainable solutions. Methods/Analysis: We conducted a case study in the Eastern Delta Region of Egypt. A questionnaire containing a list of 22 impact factors on subcontractors' cash flow was distributed across multiple subcontractor firms with an 82% response rate. It was designed to explore the factors causing cash flow instability and analyze them using SPSS statistics. Findings: The study finds that inflation, late payments, non-compensation for late payments, poor subcontractor cash flow management, subcontractor firms' inclination to avoid disputes, material price fluctuation, and non-compensation terms, as well as suppliers rejection of payment delays, are the most critical factors of subcontractor cash flow problems. Novelty/Improvement: The study suggests adding three sub-articles to Article 57 in "Tender Law" as legally sustainable solutions to protect and maintain the firm's growth rate from inflation, late payment, and the inclination to avoid disputes. Also, the study recommends that the owner ensure that cash is available before procuring the general contractors, as stated in Egyptian Law 182 of 2018. This study will contribute to establishing a sustainable win-win relationship between subcontractors and general contractors.
引用
收藏
页码:94 / 104
页数:11
相关论文
共 51 条
[41]   Causes of Payment Problems in the New Zealand Construction Industry [J].
Ramachandra, Thanuja ;
Rotimi, James Olabode Bamidele .
CONSTRUCTION ECONOMICS AND BUILDING, 2015, 15 (01) :43-55
[42]   Cause and Effect of Conditional Payments Provision to Subcontractors [J].
Rostiyanti, Susy F. ;
Hansen, Seng ;
Ponda, Teuku Noerkhaliq .
JOURNAL OF LEGAL AFFAIRS AND DISPUTE RESOLUTION IN ENGINEERING AND CONSTRUCTION, 2020, 12 (01)
[43]  
Seddon PB, 2010, MIS QUART, V34, P305
[44]  
Shiha A., 2019, CSCE ANN C 12 15 JUN
[45]  
Supardi A., 2012, INT C MECH EL TECHN, V1-3, DOI [10.1115/1.859810.paper323, DOI 10.1115/1.859810.PAPER323]
[46]   Modified Finance-Based Scheduling Model with Variable Contractor-to-Subcontractor Payment Arrangement [J].
Tabyang, Wisitsak ;
Benjaoran, Vacharapoom .
KSCE JOURNAL OF CIVIL ENGINEERING, 2016, 20 (05) :1621-1630
[47]   Relationships between Main Contractors and Subcontractors and Their Impacts on Main Contractor Competitiveness: An Empirical Study in Hong Kong [J].
Tan, Yongtao ;
Xue, Bin ;
Cheung, Yim Ting .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2017, 143 (07)
[48]   Fundamental Principles of Subcontractor ManagementFundamental Principles of Subcontractor Management [J].
Thomas, H. Randolph ;
Flynn, Christopher J. .
PRACTICE PERIODICAL ON STRUCTURAL DESIGN AND CONSTRUCTION, 2011, 16 (03) :106-111
[49]  
Wong W. F., 2004, P 20 ANN ARCOM C 1 3
[50]  
Ye K. M., 2010, International Journal of Mechanical and Industrial Engineering, V4, P503, DOI DOI 10.5281/ZENODO.1329721