Operation-Based Reliability Assessment of Shore-to-Ship Charging Systems Including On-Shore Batteries

被引:5
作者
Karimi, Siamak [1 ]
Zadeh, Mehdi [1 ]
Suul, Jon Are [2 ,3 ]
机构
[1] Norwegian Univ Sci & Technol, Dept Marine Technol, N-7050 Trondheim, Norway
[2] Norwegian Univ Sci & Technol, SINTEF Energy Res, N-7050 Trondheim, Norway
[3] Norwegian Univ Sci & Technol, Dept Engn Cybernet, N-7050 Trondheim, Norway
关键词
Battery-electric ship; marine electrification; reliability assessment; shipboard power systems; shore-to-ship charging;
D O I
10.1109/TIA.2023.3258419
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In this paper, an operation-based reliability assessment framework is proposed for Shore-to-Ship Charging (S2SC) systems including On-Shore Batteries (OSB). The OSB is considered to support the grid under fast charging loads. By the proposed approach, the impact of operational planning on reliability is identified. The main operational parameters considered in the reliability analysis include the charging load power and the charging- and discharging scheduling of the OSB. A hierarchical reliability framework is established where the failure rates of the components are estimated based on the FIDES methodology for physics-of-failure-based reliability prediction. Then, a dynamic failure threshold is introduced to translate the component failure consequences to the system performance into three states - failed, normal, and de-rated operation. Hence, the failure threshold is obtained for a specific set of operational and system design parameters. Additionally, to benchmark the characteristics of the SoC profiles of the OSB, an operation-based battery lifetime analysis is conducted. The evaluation of system-level reliability and on-shore battery lifetime is carried out for a 4MW dc S2SC system with a specified range of operation parameters. The results show that batteries and the IGBTs in the power electronics converters are the most reliability-critical elements. Moreover, it is apparent from the results that adjustments to the OSB power profile planning can potentially improve the reliability of the system for specific system sizing. It is also found that the OSB lifetime can be extended up to 2.5 times by increasing the capacity by 50% and keeping the SoC close to around 50%.
引用
收藏
页码:4752 / 4763
页数:12
相关论文
共 29 条
[1]  
Allan R. N., 2013, Reliability evaluation of power systems
[2]  
[Anonymous], 1984, Reliability Evaluation of Power Systems, DOI DOI 10.1007/978-1-4615-7731-7
[3]  
[Anonymous], IGBT Modules
[4]  
[Anonymous], 2010, FIDES GUIDE 2009 EDI, V2009
[5]  
DNV-Maritime, ALT FUEL INS AFI
[6]   Power electronics and future marine electrical systems [J].
Ericsen, T ;
Hingorani, N ;
Khersonsky, Y .
IEEE TRANSACTIONS ON INDUSTRY APPLICATIONS, 2006, 42 (01) :155-163
[7]   Reliability Modeling and Evaluation of MMCs Under Different Redundancy Schemes [J].
Guo, Jingli ;
Wang, Xiuli ;
Liang, Jun ;
Pang, Hui ;
Goncalves, Jorge .
IEEE TRANSACTIONS ON POWER DELIVERY, 2018, 33 (05) :2087-2096
[8]   A comprehensive study on reliability performance of Photovoltaic-battery-based microgrids under different energy management strategies [J].
Jiang, Jiahui ;
Peyghami, Saeed ;
Coates, Colin ;
Blaabjerg, Frede .
JOURNAL OF ENERGY STORAGE, 2021, 43
[9]  
Karim S., 2022, P IEEE IAS 58 IND CO, P1
[10]   A Multilayer Framework for Reliability Assessment of Shore-to-Ship Fast Charging System Design [J].
Karimi, Siamak ;
Zadeh, Mehdi ;
Suul, Jon Are .
IEEE TRANSACTIONS ON TRANSPORTATION ELECTRIFICATION, 2022, 8 (03) :3028-3040