A Genetic-Algorithm-Based Approach for Optimizing Tool Utilization and Makespan in FMS Scheduling

被引:3
作者
Grassi, Andrea [1 ]
Guizzi, Guido [1 ]
Popolo, Valentina [1 ]
Vespoli, Silvestro [2 ]
机构
[1] Univ Napoli Federico II, Dipartimento Ingn Chim Mat & Prod Ind DICMAPI, Piazzale Tecchio 80, I-80125 Naples, Italy
[2] Univ Telematica Pegaso, Fac Sci Giurid & Econom, I-00186 Rome, Italy
关键词
flexible manufacturing systems; operations scheduling; optimization; tool utilization; makespan; genetic algorithm; aerospace case study; FLEXIBLE MANUFACTURING SYSTEM; DYNAMIC JOB-SHOP;
D O I
10.3390/jmmp7020075
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper proposes a genetic algorithm approach to solve the identical parallel machines problem with tooling constraints in job shop flexible manufacturing systems (JS-FMSs) with the consideration of tool wear. The approach takes into account the residual useful life of tools and allocates a set of jobs with specific processing times and tooling requirements on identical parallel machines. Two metrics are introduced to evaluate the scheduling decisions and optimize the scheduling process, with the competitive goal of maximizing tool utilization and minimizing production makespan. The proposed approach searches for a set of optimal solutions on the Pareto front that offers the best possible balance between these two objectives, achieving optimal local performance in terms of both makespan and tool utilization. The approach is implemented with a customized genetic algorithm and validated on a real case study from a company operating in the aerospace sector, which confirms its effectiveness in increasing tool utilization and reducing the makespan. The results show that the proposed approach has significant practical implications for the manufacturing industry, particularly in the production of high-value materials such as those in the aerospace sector that require costly tools. This paper contributes to the operational research community by providing advanced scheduling algorithms that can optimize both the makespan and the tool utilization concurrently, improving production efficiency and maintaining competitiveness in the manufacturing industry.
引用
收藏
页数:16
相关论文
共 31 条
[1]   A review: drilling performance and hole quality of aluminium alloys for aerospace applications [J].
Aamir, Muhammad ;
Giasin, Khaled ;
Tolouei-Rad, Majid ;
Vafadar, Ana .
JOURNAL OF MATERIALS RESEARCH AND TECHNOLOGY-JMR&T, 2020, 9 (06) :12484-12500
[2]   Effect of tool sharing on the reliability of flexible manufacturing systems [J].
Altumi, AA ;
Taboun, SM .
PRODUCTION PLANNING & CONTROL, 2001, 12 (03) :265-273
[3]   Towards the integration of flexible manufacturing system scheduling [J].
Balogun, OO ;
Popplewell, K .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1999, 37 (15) :3399-3428
[4]   Digital Twin Based Optimization of a Manufacturing Execution System to Handle High Degrees of Customer Specifications [J].
Barni, Andrea ;
Pietraroia, Dario ;
Zust, Simon ;
West, Shaun ;
Stoll, Oliver .
JOURNAL OF MANUFACTURING AND MATERIALS PROCESSING, 2020, 4 (04)
[5]   Experiences and issues in evaluating tool requirements using genetic algorithms [J].
Braglia, M ;
Zavanella, L .
PRODUCTION PLANNING & CONTROL, 1999, 10 (04) :340-358
[6]   Tool allocation in flexible manufacturing systems with tool alternatives [J].
Buyurgan, N ;
Saygin, C ;
Kilic, SE .
ROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING, 2004, 20 (04) :341-349
[7]   WORK SCHEDULING IN FMS UNDER TOOL AVAILABILITY CONSTRAINTS [J].
CARRIE, AS ;
PERERA, DTS .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1986, 24 (06) :1299-1308
[8]   Simulation of Smart Factory Processes Applying Multi-Agent-Systems-A Knowledge Management Perspective [J].
Dornhoefer, Mareike ;
Sack, Simon ;
Zenkert, Johannes ;
Fathi, Madjid .
JOURNAL OF MANUFACTURING AND MATERIALS PROCESSING, 2020, 4 (03)
[9]   Stochastic optimization of two-machine flow shop robotic cells with controllable inspection times: From theory toward practice [J].
Foumani, Mehdi ;
Razeghi, Ayaz ;
Smith-Miles, Kate .
ROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING, 2020, 61
[10]   A modeling technique for loading and scheduling problems in FMS [J].
Gamila, MA ;
Motavalli, S .
ROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING, 2003, 19 (1-2) :45-54