A greedy-based crow search algorithm for semiconductor final testing scheduling problem

被引:6
作者
Hu, Weiguo [1 ]
Liu, Min [1 ]
Dong, Mingyu [1 ]
Liu, Tao [1 ]
Zhang, Yabin [1 ]
Cheng, Guanyi [2 ]
机构
[1] Tsinghua Univ, Beijing, Peoples R China
[2] Yangtze Memory Technol Co Ltd, Wuhan, Peoples R China
基金
中国国家自然科学基金;
关键词
Semiconductor final testing scheduling; problem; Crow search algorithm; Greedy-based; Makespan; OPTIMIZATION ALGORITHM; TEST OPERATIONS;
D O I
10.1016/j.cie.2023.109423
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
The semiconductor final testing scheduling problem (SFTSP) is of great importance to the efficiency of integrated circuit firms and has been widely investigated in the field of intelligent optimization. In this paper, a greedy-based crow search algorithm (GCSA) is presented for solving the SFTSP. According to the characteristics of SFTSP, new encoding and decoding strategies are proposed to link the feasible solutions to the scheduling schemes. The search operations are performed only in the operation sequence space, and a corresponding ma-chine allocation vector is generated for each operation sequence vector based on the greed mechanism. Two crow position update strategies named track and hover are redesigned and the improved crow search algorithm is utilized to search the operation sequence space efficiently in order that the GCSA can adapt the SFTSP and make full use of the information obtained during the search process. Moreover, the effect of parameters is investigated based on a multi-factor analysis of variance (ANOVA) approach. Finally, extensive computations and compari-sons on ten test instances derived from the practical production demonstrate that the proposed GCSA out-performs the state-of-the-art methods in the literature to solve the SFTSP.
引用
收藏
页数:14
相关论文
共 43 条
  • [1] A novel approach based on crow search algorithm for optimal selection of conductor size in radial distribution networks
    Abdelaziz, Almoataz Y.
    Fathy, Ahmed
    [J]. ENGINEERING SCIENCE AND TECHNOLOGY-AN INTERNATIONAL JOURNAL-JESTECH, 2017, 20 (02): : 391 - 402
  • [2] An algorithm for a no-wait flowshop scheduling problem for minimizing total tardiness with a constraint on total completion time
    Allahverdi, Ali
    Aydilek, Harun
    Aydilek, Asiye
    [J]. INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING COMPUTATIONS, 2022, 13 (01) : 43 - 50
  • [4] A novel metaheuristic method for solving constrained engineering optimization problems: Crow search algorithm
    Askarzadeh, Alireza
    [J]. COMPUTERS & STRUCTURES, 2016, 169 : 1 - 12
  • [5] Scheduling Semiconductor Testing Facility by Using Cuckoo Search Algorithm With Reinforcement Learning and Surrogate Modeling
    Cao, ZhengCai
    Lin, ChengRan
    Zhou, MengChu
    Huang, Ran
    [J]. IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2019, 16 (02) : 825 - 837
  • [6] A SELF-COMPACT CONCRETE-STEEL COMPOSITE STRUCTURE FOR ELECTRICAL TRANSMISSION TOWER
    Chen, Ju
    Ye, Yin
    Sheng, Xiao-Hong
    Huang, Da-Yu
    Jin, Wei-Liang
    [J]. 2ND INTERNATIONAL SYMPOSIUM ON DESIGN, PERFORMANCE AND USE OF SELF-CONSOLIDATING CONCRETE, 2009, 65 : 697 - +
  • [7] A self-learning genetic algorithm based on reinforcement learning for flexible job-shop scheduling problem
    Chen, Ronghua
    Yang, Bo
    Li, Shi
    Wang, Shilong
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2020, 149
  • [8] Multi-objective genetic algorithm for energy-efficient hybrid flow shop scheduling with lot streaming
    Chen, Tzu-Li
    Cheng, Chen-Yang
    Chou, Yi-Han
    [J]. ANNALS OF OPERATIONS RESEARCH, 2020, 290 (1-2) : 813 - 836
  • [9] Cheng-Kang Lee, 2015, Applied Mechanics and Materials, V710, P61, DOI 10.4028/www.scientific.net/AMM.710.61
  • [10] Improved customer satisfaction with a hybrid dispatching rule in semiconductor back-end factories
    Chiang, David M.
    Guo, Ruey-Shan
    Pai, Fan-Yun
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2008, 46 (17) : 4903 - 4923