Using principal component analysis to identify latent factors affecting cost and time overrun in public construction projects

被引:10
作者
Wyke, Simon [1 ]
Lindhard, Soren Munch [1 ]
Larsen, Jesper Kranker [2 ]
机构
[1] Aalborg Univ, Dept Built Environm, Aalborg, Denmark
[2] Aalborg Univ, Dept Mat & Prod, Aalborg, Denmark
关键词
Principal component analysis (PCA); Latent factors; Public construction; Cost; Time; Management; Quality control; Project preparation; User management; Project management; CAUSATIVE FACTORS; PLANNING EFFORT; MANAGEMENT; DELAYS; DESIGN; PERFORMANCE; QUALITY; RISK; ESCALATION; PHASE;
D O I
10.1108/ECAM-02-2022-0189
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
PurposeCost and time are two of the primary benchmarks in which construction projects are measured. A variety of factors, however, affect cost and time on construction projects, as identified in previous research. This has led to a need for better understanding how factors affecting cost and time overruns on public construction projects can be managed more efficiently. The purpose of this paper is to address these issues.Design/methodology/approachIn this study 26 factors affecting cost and time overruns on construction projects were identified, through qualitative interviews with project managers from Danish governmental agencies and through a literature review. Through principal component analyses the 26 factors were subsequently narrowed down to four primary latent factors.FindingsThe identified four latent factors affecting cost and time overruns on public construction projects were lack of quality management, lack of project pre-planning, lack of user management and lack of project management.Originality/valuePrevious research has focussed on increasing knowledge by identifying and ranking factors affecting time and cost performance. This has led to the identification of an overwhelming number of factors to use for managing construction projects. The present research reduced the number of factors by clustering them into key latent factors responsible for most of the deviation in performance, narrowing the scope of construction cost and time management into a few tangible key focus areas. This supports and improves fast decision-making that is necessary in a changeable environment such as construction.
引用
收藏
页码:2415 / 2436
页数:22
相关论文
共 112 条
[1]   Cost of quality in Dubai: An analytical case study of residential construction projects [J].
Abdelsalam, Hisham M. E. ;
Gad, Medhat M. .
INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2009, 27 (05) :501-511
[2]   Model for predicting the performance of project managers at the construction phase of mass house building projects [J].
Ahadzie, D. K. ;
Proverbs, D. G. ;
Olomolaiye, P. O. .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2008, 134 (08) :618-629
[3]   Building high-performing and integrated project teams [J].
Ahiaga-Dagbui, Dominic D. ;
Tokede, Olubukola ;
Morrison, John ;
Chirnside, Anthony .
ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2020, 27 (10) :3341-3361
[4]   Construction delays and their causative factors in Nigeria [J].
Aibinu, Ajibade Ayodeji ;
Odeyinka, Henry Agboola .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2006, 132 (07) :667-677
[5]   Causes of delays in Saudi Arabian public sector construction projects [J].
Al-Kharashi, Adel ;
Skitmore, Martin .
CONSTRUCTION MANAGEMENT AND ECONOMICS, 2009, 27 (01) :3-23
[6]  
Alducin-Quintero G, 2012, PROCEEDINGS OF THE ASME INTERNATIONAL DESIGN ENGINEERING TECHNICAL CONFERENCES AND COMPUTERS AND INFORMATION IN ENGINEERING CONFERENCE 2012, VOL 2, PTS A AND B, P349
[7]   Cost overruns of public sector construction projects: a developing country perspective [J].
Asiedu, Richard Ohene ;
Adaku, Ebenezer .
INTERNATIONAL JOURNAL OF MANAGING PROJECTS IN BUSINESS, 2019, 13 (01) :66-84
[8]   Causes of delay in large construction projects [J].
Construction Engineering and Management Department, King Fahd University of Petroleum and Minerals, Box # 680, Dhahran, 31261, Saudi Arabia .
Int. J. Proj. Manage., 2006, 4 (349-357) :349-357
[9]  
Bekr G.A., 2017, GSTF J ENG TECHNOLOG, V4, P92
[10]   Capturing design rationale [J].
Bracewell, Rob ;
Wallace, Ken ;
Moss, Michael ;
Knott, David .
COMPUTER-AIDED DESIGN, 2009, 41 (03) :173-186