Two-Agent Slack Due-Date Assignment Scheduling with Resource Allocations and Deteriorating Jobs

被引:9
作者
Zhang, Li-Han [1 ]
Lv, Dan-Yang [1 ]
Wang, Ji-Bo [1 ]
机构
[1] Shenyang Aerosp Univ, Sch Comp Sci, Shenyang 110136, Peoples R China
关键词
scheduling; two-agent; slack due-date; deteriorating job; resource allocation; SINGLE-MACHINE;
D O I
10.3390/math11122737
中图分类号
O1 [数学];
学科分类号
0701 ; 070101 ;
摘要
In enterprise management, there are often multiple agents competing for the same products to reduce production cost. On this basis, this paper investigates a two-agent slack due-date single-machine scheduling problem with deteriorating jobs, where the processing time of a job is extended as a function of position-dependent workload, resource allocation and a common deterioration rate. The goal is to find the optimal sequence and resource allocation that minimizes the maximal value of earliness, tardiness, and decision variables of one agent subject to an upper bound on cost value of the second agent. Through theoretical analysis, a polynomial time algorithm with O(N3) time is proposed for the problem, where N is the maximum number of jobs between the two agents.
引用
收藏
页数:12
相关论文
共 29 条
[1]   Multi-agent single machine scheduling [J].
Agnetis, Alessandro ;
Pacciarelli, Dario ;
Pacifici, Andrea .
ANNALS OF OPERATIONS RESEARCH, 2007, 150 (01) :3-15
[2]   Dominance inequalities for scheduling around an unrestrictive common due date [J].
Falq, Anne-Elisabeth ;
Fouilhoux, Pierre ;
Kedad-Sidhoum, Safia .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2022, 296 (02) :453-464
[3]  
Gawiejnowicz S., 2020, MODELS ALGORITHMS TI
[4]   An algorithm for multi-agent scheduling to minimize the makespan on m parallel machines [J].
Gu, Manzhan ;
Gu, Jinwei ;
Lu, Xiwen .
JOURNAL OF SCHEDULING, 2018, 21 (05) :483-492
[5]  
Hadayat N.P.A., 2022, INT J IND SYST ENG, V41, P254, DOI [10.1504/IJISE.2022.123576, DOI 10.1504/IJISE.2022.123576]
[6]   Two-agent bounded parallel-batching scheduling for minimizing maximum cost and makespan [J].
He, Cheng ;
Wu, Jing ;
Lin, Hao .
DISCRETE OPTIMIZATION, 2022, 45
[7]   Two-Agent Single Machine Scheduling with Deteriorating Jobs and Rejection [J].
Li, Dawei ;
Li, Ganggang ;
Cheng, Fangzheng .
MATHEMATICAL PROBLEMS IN ENGINEERING, 2022, 2022
[8]   Group Technology Scheduling with Due-Date Assignment and Controllable Processing Times [J].
Liu, Weiguo ;
Wang, Xuyin .
PROCESSES, 2023, 11 (04)
[9]   Single machine scheduling with slack due dates assignment [J].
Liu, Weiguo ;
Hu, Xiangpei ;
Wang, Xuyin .
ENGINEERING OPTIMIZATION, 2017, 49 (04) :709-717
[10]   Due-date assignment scheduling involving job-dependent learning effects and convex resource allocation [J].
Liu, Weiwei ;
Jiang, Chong .
ENGINEERING OPTIMIZATION, 2020, 52 (01) :74-89