RESEARCH AND APPLICATION OF U-BIT CONSTRUCTION METHOD IN SUBWAY STATION ENGINEERING LOCATED IN SATURATED SOFT SOIL AREA

被引:1
作者
Guo, Yan [1 ]
Zhu, Yanfei [1 ]
Pan, Weiqiang [1 ]
Jin, Ye [2 ]
机构
[1] Shanghai Tunnel Engn Construction Co Ltd, 1099 South Wanping Rd, Shanghai 200032, Peoples R China
[2] Shanghai Tunnel Engn & Rail Transit Design & Res I, 1999 West Zhongshan Rd, Shanghai 200235, Peoples R China
来源
CIVIL ENGINEERING JOURNAL-STAVEBNI OBZOR | 2023年 / 32卷 / 01期
关键词
Underground excavation method; Underground bundled integrate tunnel; Saturated soft soil; Subway station; Prestressed tension; Ground surface subsidence;
D O I
10.14311/CEJ.2023.01.0009
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
In order to solve the problems existing in the construction of underground structures located in the downtown of saturated soft soil area, such as insufficient construction site, complex adjacent structures and great impact on the surrounding environment, the construction method of underground bundled integrate tunnel(U-BIT) is proposed. In this method, after steel pipes jacking completed, concrete is filled into the pipes, and prestress is tensioned to make each independent pipe combined to form a whole bearing structure, so as to achieve the purpose of reducing the size of structural components, improving the structural stiffness and bearing capacity. Based on the structural mechanical property test and the project of Wuding Road Station of Shanghai Metro Line 14, the failure mechanism of bundled integrate structure, the tension technology of prestressed tendons in narrow space and the variation rules of ground surface subsidence are systematically studied. The research shows that structural seam sections will be destroyed before pipe sections, so ensuring the mechanical performance of seam sections is very important to make sure the structural safety. Since each independent pipe is combined to form an overall stable structure under the prestress effect, the subsequent soil excavation has little influence on the tension of prestressed tendons and ground surface subsidence. Therefore, the above construction method can control the ground surface subsidence effectively and reduce the influence of underground engineering construction on the surrounding environment.
引用
收藏
页码:108 / 121
页数:14
相关论文
共 22 条
[1]  
[Anonymous], 2017, Code for Construction and Acceptance of Shield Tunneling Method
[2]  
[Anonymous], 2015, GB 50010-2010
[3]  
[毕湘利 Bi Xiangli], 2022, [隧道建设(中英文), Tunnel Construction], V42, P953
[4]  
Bi Xiangli, 2022, J RAILWAY SCI ENG, DOI [10.19713/j.cnki.43-1423/u.T20220291, DOI 10.19713/J.CNKI.43-1423/U.T20220291]
[5]  
[陈敬军 Chen Jingjun], 2021, [地下空间与工程学报, Chinese Journal of Underground Space and Engineering], V17, P825
[6]  
Cheng P., 2021, Modern Tunnelling Technology, V58, P240
[7]  
Fang Liu, 2018, J RAILWAY ENG SOC, V35, P36
[8]  
Jiguo Liu, 2013, ICPTT 2013. Trenchless Technology. The Best Choice for Underground Pipeline Construction and Renewal. Proceedings of the International Conference on Pipelines and Trenchless Technology, P667
[9]  
Liu F, 2021, CHIN J UNDERG SPACE, V17, P180
[10]  
Liu Fengjun, 2007, STUDY DESIGN PHILOS