Bi-objective energy-efficient scheduling in a seru production system considering reconfiguration of serus

被引:2
作者
Lian, Jie [1 ]
Li, Wenjuan [2 ]
Pu, Guoli [1 ]
Zhang, Pengwei [1 ]
机构
[1] Xian Univ Technol, Sch Econ & Management, Xian 710048, Peoples R China
[2] Beijing Inst Math Sci & Applicat, Beijing 101408, Peoples R China
关键词
Seru production; Cell loading; Green scheduling; Seru reconfiguration; NSGA-II; FLEXIBLE JOB-SHOP; PERMUTATION FLOW-SHOP; ELECTRICITY CONSUMPTION; OPTIMIZATION ALGORITHM; PARALLEL MACHINES; CARBON FOOTPRINT; TIME; TARDINESS; MODEL; EARLINESS;
D O I
10.1016/j.suscom.2023.100900
中图分类号
TP3 [计算技术、计算机技术];
学科分类号
0812 ;
摘要
Owing to movable workstations, light equipment and multi-skilled workers, serus can be constructed, modified and dismantled rapidly. Such an advantage enables serus to be reconfigured in response to frequent changes in product types. As different configurations lead to different processing time and energy consumption, an important issue is how to arrange a best configuration of seru with the tasks assigned to it. To this end, we focus on solving the task dispatching, product sequencing and seru reconfiguration problems simultaneously considering economic and environmental performance. A bi-objective mathematical model with objectives of minimizing the total earliness and tardiness and the total carbon dioxide emission is formulated. The problem is proved to be strongly NP-hard, and a non-dominated sorting genetic algorithm-II (NSGA-II) is developed. The algorithm is tested by a medium-size numerical example and ninety sets of large-size problems. Based on the computational results, the impact of configuration flexibility and the relation between processing time and energy consumption on the value of objective functions is analyzed.
引用
收藏
页数:12
相关论文
共 50 条
[31]   Energy-efficient scheduling for multi-objective flexible job shops with variable processing speeds by grey wolf optimization [J].
Luo, Shu ;
Zhang, Linxuan ;
Fan, Yushun .
JOURNAL OF CLEANER PRODUCTION, 2019, 234 :1365-1384
[32]   Bi-Objective Optimal Scheduling With Raw Material's Shelf-Life Constraints in Unrelated Parallel Machines Production [J].
Wang, Ming-Zheng ;
Zhang, Ling-Ling ;
Choi, Tsan-Ming .
IEEE TRANSACTIONS ON SYSTEMS MAN CYBERNETICS-SYSTEMS, 2020, 50 (11) :4598-4610
[33]   Energy-Efficient Adaptive System Reconfiguration for Dynamic Deadlines in Autonomous Driving [J].
Yi, Saehanseul ;
Kim, Tae-Wook ;
Kim, Jong-Chan ;
Dutt, Nikil .
2021 IEEE 24TH INTERNATIONAL SYMPOSIUM ON REAL-TIME DISTRIBUTED COMPUTING (ISORC 2021), 2021, :96-104
[34]   Energy-efficient flexible job shop scheduling problem considering discrete operation sequence flexibility [J].
Gong, Guiliang ;
Tang, Jiuqiang ;
Huang, Dan ;
Luo, Qiang ;
Zhu, Kaikai ;
Peng, Ningtao .
SWARM AND EVOLUTIONARY COMPUTATION, 2024, 84
[35]   A bi-objective home care routing and scheduling problem considering patient preference and soft temporal dependency constraints [J].
Oladzad-Abbasabady, Nastaran ;
Tavakkoli-Moghaddam, Reza ;
Mohammadi, Mehrdad ;
Vahedi-Nouri, Behdin .
ENGINEERING APPLICATIONS OF ARTIFICIAL INTELLIGENCE, 2023, 119
[36]   Bi-objective carbon-efficient distributed flow-shop scheduling with multistep electricity pricing [J].
Yu, Xianyu ;
Du, Hengte ;
Zhou, Dequn ;
Wang, Qunwei ;
Lin, Guohui .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2024, 62 (18) :6842-6858
[37]   A fuzzy bi-objective flexible cell scheduling optimization model under green and energy-efficient strategy using Pareto-based algorithms: SATPSPGA, SANRGA, and NSGA-II [J].
Mohammad Hemmati Far ;
Hassan Haleh ;
Abbas Saghaei .
The International Journal of Advanced Manufacturing Technology, 2019, 105 :3853-3879
[38]   A fuzzy bi-objective flexible cell scheduling optimization model under green and energy-efficient strategy using Pareto-based algorithms: SATPSPGA, SANRGA, and NSGA-II [J].
Far, Mohammad Hemmati ;
Haleh, Hassan ;
Saghaei, Abbas .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2019, 105 (09) :3853-3879
[39]   Multi-objective genetic algorithm for energy-efficient job shop scheduling [J].
May, Goekan ;
Stahl, Bojan ;
Taisch, Marco ;
Prabhu, Vittal .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2015, 53 (23) :7071-7089
[40]   Energy-efficient production scheduling through machine on/off control during preventive maintenance [J].
Gong, Guiliang ;
Chiong, Raymond ;
Deng, Qianwang ;
Han, Wenwu ;
Zhang, Like ;
Huang, Dan .
ENGINEERING APPLICATIONS OF ARTIFICIAL INTELLIGENCE, 2021, 104