Bi-objective energy-efficient scheduling in a seru production system considering reconfiguration of serus

被引:2
作者
Lian, Jie [1 ]
Li, Wenjuan [2 ]
Pu, Guoli [1 ]
Zhang, Pengwei [1 ]
机构
[1] Xian Univ Technol, Sch Econ & Management, Xian 710048, Peoples R China
[2] Beijing Inst Math Sci & Applicat, Beijing 101408, Peoples R China
关键词
Seru production; Cell loading; Green scheduling; Seru reconfiguration; NSGA-II; FLEXIBLE JOB-SHOP; PERMUTATION FLOW-SHOP; ELECTRICITY CONSUMPTION; OPTIMIZATION ALGORITHM; PARALLEL MACHINES; CARBON FOOTPRINT; TIME; TARDINESS; MODEL; EARLINESS;
D O I
10.1016/j.suscom.2023.100900
中图分类号
TP3 [计算技术、计算机技术];
学科分类号
0812 ;
摘要
Owing to movable workstations, light equipment and multi-skilled workers, serus can be constructed, modified and dismantled rapidly. Such an advantage enables serus to be reconfigured in response to frequent changes in product types. As different configurations lead to different processing time and energy consumption, an important issue is how to arrange a best configuration of seru with the tasks assigned to it. To this end, we focus on solving the task dispatching, product sequencing and seru reconfiguration problems simultaneously considering economic and environmental performance. A bi-objective mathematical model with objectives of minimizing the total earliness and tardiness and the total carbon dioxide emission is formulated. The problem is proved to be strongly NP-hard, and a non-dominated sorting genetic algorithm-II (NSGA-II) is developed. The algorithm is tested by a medium-size numerical example and ninety sets of large-size problems. Based on the computational results, the impact of configuration flexibility and the relation between processing time and energy consumption on the value of objective functions is analyzed.
引用
收藏
页数:12
相关论文
共 50 条
  • [21] Bi-objective optimization of a single machine batch scheduling problem with energy cost consideration
    Wang, Shijin
    Liu, Ming
    Chu, Feng
    Chu, Chengbin
    JOURNAL OF CLEANER PRODUCTION, 2016, 137 : 1205 - 1215
  • [22] Bi-objective optimization of a grid-connected decentralized energy system
    Altintas, Onur
    Okten, Busra
    Karsu, Ozlem
    Kocaman, Ayse Selin
    INTERNATIONAL JOURNAL OF ENERGY RESEARCH, 2018, 42 (02) : 447 - 465
  • [23] An energy-efficient two-stage hybrid flow shop scheduling problem in a glass production
    Wang, Shijin
    Wang, Xiaodong
    Chu, Feng
    Yu, Jianbo
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2020, 58 (08) : 2283 - 2314
  • [24] Energy-Efficient Bi-Objective Optimization Based on the Moth-Flame Algorithm for Cluster Head Selection in a Wireless Sensor Network
    Mistarihi, Mahmoud Z.
    Salameh, Haythem A. Bany
    Alsaadi, Mohammad Adnan
    Beyca, Omer F.
    Heilat, Laila
    Al-Shobaki, Raya
    PROCESSES, 2023, 11 (02)
  • [25] Modeling and solving the multi-objective energy-efficient production planning and scheduling with imperfect maintenance activities
    Rastgar, Iman
    Rezaeian, Javad
    Mahdavi, Iraj
    Fattahi, Parviz
    JOURNAL OF QUALITY IN MAINTENANCE ENGINEERING, 2024, 30 (01) : 26 - 50
  • [26] A bi-objective manufacturing/remanufacturing system considering downward substitutions between three markets
    Afshar-Bakeshloo, Mohammadbagher
    Jolai, Fariborz
    Bozorgi-Amiri, Ali
    JOURNAL OF MANUFACTURING SYSTEMS, 2021, 58 : 75 - 92
  • [27] The mixed production mode considering continuous and intermittent processing for an energy-efficient hybrid flow shop scheduling
    Liu, Zhifeng
    Yan, Jun
    Cheng, Qiang
    Yang, Congbin
    Sun, Shuwen
    Xue, Deyi
    JOURNAL OF CLEANER PRODUCTION, 2020, 246
  • [28] Green Energy Forecast-Based Bi-Objective Scheduling of Tasks Across Distributed Clouds
    Bi, Jing
    Yuan, Haitao
    Zhang, Jia
    Zhou, MengChu
    IEEE TRANSACTIONS ON SUSTAINABLE COMPUTING, 2022, 7 (03): : 619 - 630
  • [29] A parallel bi-objective hybrid metaheuristic for energy-aware scheduling for cloud computing systems
    Mezmaz, M.
    Melab, N.
    Kessaci, Y.
    Lee, Y. C.
    Talbi, E. -G.
    Zomaya, A. Y.
    Tuyttens, D.
    JOURNAL OF PARALLEL AND DISTRIBUTED COMPUTING, 2011, 71 (11) : 1497 - 1508
  • [30] Energy-efficient scheduling for multi-objective flexible job shops with variable processing speeds by grey wolf optimization
    Luo, Shu
    Zhang, Linxuan
    Fan, Yushun
    JOURNAL OF CLEANER PRODUCTION, 2019, 234 : 1365 - 1384