The stress relief correction method considering irregular borehole shapes

被引:1
|
作者
Qin, Yuqiao [1 ]
Tang, Hua [1 ]
Wu, Zhenjun [1 ]
Ge, Xiurun [1 ]
机构
[1] Chinese Acad Sci, Inst Rock & Soil Mech, State Key Lab Geomech & Geotech Engn, Wuhan 430071, Peoples R China
关键词
In situ stress measurement; Complex function; Conformal transformation; Irregular borehole; Stress relief method; MEASUREMENT-RELATED UNCERTAINTIES; ISRM SUGGESTED METHODS; ASPO HRL; PART; CAVERN; SWEDEN; TUNNEL;
D O I
10.1016/j.compgeo.2023.105417
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
In situ stress is an essential parameter that directly affects all engineering construction and scientific research in deep rock masses. The shapes of deep borehole are often highly irregular, so that the traditional in situ stress measurement methods based on the assumption of circular or cylindrical boreholes are no longer applicable. We propose a stress relief correction method considering irregular borehole shape using the complex function method of elasticity. The conformal mapping function is introduced to project the irregular shape into a unit circle and the relationship between the strains at the borehole wall and the far-field in situ stress components are solved by the Cauchy integral methods. The results show the following: (1) The stress results from the stress relief correction method are consistent with the theoretical solutions and numerical simulation results for circular and square boreholes. (2) The irregular borehole shape significantly changes the distribution of stress magnitude and the direction of strain measurement on the borehole wall. The stress relief correction method considering irregular borehole shapes provides an essential theoretical basis for deep rock mass engineering construction and deep oil and gas field exploration.
引用
收藏
页数:19
相关论文
共 50 条
  • [1] ANALYSIS OF BOREHOLE STRESS-RELIEF METHOD IN ROCKS WITH RHEOLOGICAL PROPERTIES
    BARLA, G
    WANE, MT
    INTERNATIONAL JOURNAL OF ROCK MECHANICS AND MINING SCIENCES, 1968, 5 (02): : 187 - &
  • [2] The Application on Stress Relief method in Deviation Correction of Buildings
    Yang, Haitao
    Zhou, Li
    PROGRESS IN INDUSTRIAL AND CIVIL ENGINEERING II, PTS 1-4, 2013, 405-408 : 441 - 444
  • [3] Application of the Modified Borehole Wall Stress Relief Method in Deep Vertical Boreholes
    Yuqiao, Qin
    Hua, Tang
    Zhenjun, Wu
    INTERNATIONAL JOURNAL OF GEOMECHANICS, 2024, 24 (08)
  • [4] Geostress measurements near fault areas using borehole stress-relief method
    Huang, Ming-qing
    Wu, Ai-xiang
    Wang, Yi-ming
    Han, Bin
    TRANSACTIONS OF NONFERROUS METALS SOCIETY OF CHINA, 2014, 24 (11) : 3660 - 3665
  • [5] STRESS-RELIEF METHOD IN ANISOTROPIC ROCKS BY MEANS OF GAUGES APPLIED TO END OF A BOREHOLE
    BARLA, G
    WANE, MT
    INTERNATIONAL JOURNAL OF ROCK MECHANICS AND MINING SCIENCES, 1970, 7 (02): : 171 - &
  • [6] The in-situ stress measurement and practice of repeatedly stress relief on the original borehole
    Zheng, X.-G. (ckzxg@126.com), 1600, China University of Mining and Technology (30):
  • [7] Refinement Study on Pressure Relief Zone of Gas Extraction Borehole Considering Roughness
    Bi, Ruiqing
    Chen, Xuexi
    Zhang, Liang
    Wang, Shuangyan
    Liu, Xiaohui
    Hua, Shuai
    SUSTAINABILITY, 2022, 14 (15)
  • [8] The finite differences method for solving systems on irregular shapes
    Lakner, Mitja
    Plazl, Igor
    COMPUTERS & CHEMICAL ENGINEERING, 2008, 32 (12) : 2891 - 2896
  • [9] Wettability measurements of irregular shapes with Wilhelmy plate method
    Park, Jaehyung
    Pasaogullari, Ugur
    Bonville, Leonard
    APPLIED SURFACE SCIENCE, 2018, 427 : 273 - 280
  • [10] A study on the pressure relief scope and the stress variation of hydraulic flushing borehole
    Wei, C.F.
    Li, B.
    Li, H.M.
    Wang, F.Z.
    Journal of Engineering Science and Technology Review, 2014, 7 (01) : 103 - 108