Combining green energy technologies to electrify rural community of Wollega, Western Ethiopia

被引:16
作者
Benti, Natei Ermias [1 ,3 ]
Mekonnen, Yedilfana Setarge [2 ]
Asfaw, Ashenafi Abebe [3 ]
机构
[1] Addis Ababa Univ, Coll Nat & Computat Sci, Computat Data Sci Program, POB 1176, Addis Ababa, Ethiopia
[2] Addis Ababa Univ, Coll Nat & Computat Sci, Ctr Environm Sci, POB 1176, Addis Ababa, Ethiopia
[3] Wolaita Sodo Univ, Coll Nat & Computat Sci, Dept Phys, POB 318, Wolaita Sodo, Ethiopia
关键词
Ethiopia; HOMER Pro; PV; battery systems; Isolated rural community; Solar PV; Wind turbine; SENSITIVITY-ANALYSIS; HYBRID SYSTEM; FEASIBILITY; OPTIMIZATION; GENERATION; SOUTH;
D O I
10.1016/j.sciaf.2022.e01467
中图分类号
O [数理科学和化学]; P [天文学、地球科学]; Q [生物科学]; N [自然科学总论];
学科分类号
07 ; 0710 ; 09 ;
摘要
Power shortages are a major problem in rural Ethiopia. Only about 45% of people living in around cities have access to the public power grid. The rest of the inhabitants lives in rural regions with limited access to grid-connected energy. To evaluate the potential of a standalone solar-wind hybrid energy system (HES) for a rural off-grid settlement in western Ethiopia, a feasibility study was performed. The electrical demand of a model household, comprising a school and health facility, was calculated. HOMER Pro is a tool for determining the viability of HES. When the software is executed, optimization results are obtained and sorted according to the lowest net present cost (NPC) and cost of Elec-tricity (COE). The results reveal that the Photovoltaic (PV)/battery/converter combination is the most cost-effective, with the lowest NPC and COE. This setup's NPC is $9150, the COE is $0.173/kWh, and the renewable resource contribution is 100%. The study's findings can be used by interested parties, decision makers and investors to show the benefits of increasing renewable energy, modifying components, and reducing electricity bills.(c) 2022 The Author(s). Published by Elsevier B.V. on behalf of African Institute of Mathematical Sciences / Next Einstein Initiative. This is an open access article under the CC BY-NC-ND license ( http://creativecommons.org/licenses/by-nc-nd/4.0/ )
引用
收藏
页数:15
相关论文
共 54 条
  • [1] Aboudou K.M., 2017, INT J RECENT, V33, P22
  • [2] Acharya B., 2013, GUELPH ENG J, V5, P1
  • [3] Techno-Economic Feasibility of Hybrid Solar Photovoltaic and Battery Energy Storage Power System for a Mobile Cellular Base Station in Soshanguve, South Africa
    Aderemi, Banjo A.
    Chowdhury, S. P. Daniel
    Olwal, Thomas O.
    Abu-Mahfouz, Adnan M.
    [J]. ENERGIES, 2018, 11 (06):
  • [4] Ambekar P., 2015, INT J ADV TECHNOL EN, V5, P1
  • [5] [Anonymous], 2017, RENEWABLES 2017 GLOB
  • [6] Wind energy resource development in Ethiopia as an alternative energy future beyond the. dominant hydropower
    Asress, Mulugeta Biadgo
    Simonovic, Aleksandar
    Komarov, Dragan
    Stupar, Slobodan
    [J]. RENEWABLE & SUSTAINABLE ENERGY REVIEWS, 2013, 23 : 366 - 378
  • [7] Feasibility analysis of off-grid hybrid energy system for rural electrification in Northern Ghana
    Awopone, Albert K.
    [J]. COGENT ENGINEERING, 2021, 8 (01):
  • [8] Optimization and sensitivity analysis of standalone hybrid energy systems for rural electrification: A case study of Iraq
    Aziz, Ali Saleh
    Tajuddin, Mohammad Faridun Naim
    Adzman, Mohd Rafi
    Azmi, Azralmukmin
    Ramli, Makbul A. M.
    [J]. RENEWABLE ENERGY, 2019, 138 : 775 - 792
  • [9] Feasibility study of small Hydro/PV/Wind hybrid system for off-grid rural electrification in Ethiopia
    Bekele, Getachew
    Tadesse, Getnet
    [J]. APPLIED ENERGY, 2012, 97 : 5 - 15
  • [10] Feasibility study for a standalone solar-wind-based hybrid energy system for application in Ethiopia
    Bekele, Getachew
    Palm, Bjorn
    [J]. APPLIED ENERGY, 2010, 87 (02) : 487 - 495