Study of Long-Term Energy Storage System Capacity Configuration Based on Improved Grey Forecasting Model

被引:3
作者
Li, Jifang [1 ]
Feng, Shuo [1 ]
Zhang, Tao [2 ]
Ma, Lidong [1 ]
Shi, Xiaoyang [1 ]
Zhou, Xingyao [1 ]
机构
[1] North China Univ Water Resources & Elect Power, Sch Elect Power, Zhengzhou, Peoples R China
[2] Luoyang Power Supply Co, State Grid Henan Elect Power Co, Luoyang, Peoples R China
基金
中国国家自然科学基金;
关键词
Optimization; Predictive models; Forecasting; Costs; Load modeling; Renewable energy sources; Mathematical models; Capacity configuration; energy storage system; grey theory; hierarchical optimization; scheduling; MANAGEMENT; OPTIMIZATION; METHODOLOGY; INFORMATION; STRATEGY; LOAD;
D O I
10.1109/ACCESS.2023.3265083
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Distributed generation equipment improves renewable energy utilization and economic benefits through an energy storage system (ESS). However, dominated by short-term data, the configuration of long-period ESS capacity is absent based on the dynamic change of load, which leads to a large deviation from the expected return. Considering the system characteristics of lack of data and less information, after introducing the grey theory, we propose a new long-term capacity configuration method for ESS and establish the long-term grey forecasting model (GFM) of user load, improving the basic forecasting model to improve the accuracy of the long-term forecasting model. Then, the scheduling model is established with the maximum economic and social benefits as the optimization objective. Based on the forecast data of the improved grey forecasting model (IGFM), the hierarchical solution method is used to solve the scheduling model. Finally, the parameters are configured based on the service life of the equipment and the expected rate of return. The simulation results show that higher accuracy is realized in the improved prediction model, and the improved algorithm gets higher convergence speed and precision. Apart from that, the nonlinear correlation trend of the EES return rate between the capacity and life cycle is revealed. Compared with the ESS configuration in a short period, this study provides more comprehensive and accurate data support for the capacity configuration of the ESS, reducing the error between the actual return and the expected return significantly.
引用
收藏
页码:34977 / 34989
页数:13
相关论文
共 39 条
[31]   A Novel Control Strategy for Improving the Performance of a Nearly Zero Energy Building [J].
Tsioumas, Evangelos ;
Jabbour, Nikolaos ;
Koseoglou, Markos ;
Mademlis, Christos .
IEEE TRANSACTIONS ON POWER ELECTRONICS, 2020, 35 (02) :1513-1524
[32]   Energy Management and Control of a Flywheel Storage System for Peak Shaving Applications [J].
Tziovani, Lysandros ;
Hadjidemetriou, Lenos ;
Charalampous, Charalampos ;
Tziakouri, Maria ;
Timotheou, Stelios ;
Kyriakides, Elias .
IEEE TRANSACTIONS ON SMART GRID, 2021, 12 (05) :4195-4207
[33]   Explanations about grey information and framework of grey system modeling [J].
Xie, Naiming .
GREY SYSTEMS-THEORY AND APPLICATION, 2017, 7 (02) :179-193
[34]   Optimal sizing of renewables and battery systems for hybrid AC/DC microgrids based on variability management [J].
Xie, Peng ;
Jia, Youwei ;
Lyu, Cheng ;
Wang, Han ;
Shi, Mengge ;
Chen, Hongkun .
APPLIED ENERGY, 2022, 321
[35]   Transactive Energy Supported Economic Operation for Multi-Energy Complementary Microgrids [J].
Yang, Zhao ;
Hu, Junjie ;
Ai, Xin ;
Wu, Jiechen ;
Yang, Guangya .
IEEE TRANSACTIONS ON SMART GRID, 2021, 12 (01) :4-17
[36]   Optimal Allocation of PV Generation and Battery Storage for Enhanced Resilience [J].
Zhang, Bei ;
Dehghanian, Payman ;
Kezunovic, Mladen .
IEEE TRANSACTIONS ON SMART GRID, 2019, 10 (01) :535-545
[37]   A novel asynchronous deep reinforcement learning model with adaptive early forecasting method and reward incentive mechanism for short-term load forecasting [J].
Zhang, Wenyu ;
Chen, Qian ;
Yan, Jianyong ;
Zhang, Shuai ;
Xu, Jiyuan .
ENERGY, 2021, 236
[38]   Battery storage configuration for multi-energy microgrid considering primary frequency regulation and demand response [J].
Zhao, Peiqi ;
Gu, Chenjia ;
Li, Fangshi ;
Yang, Xiaoqiu .
ENERGY REPORTS, 2022, 8 :1175-1183
[39]   Optimal Operation of Regional Microgrids With Renewable and Energy Storage: Solution Robustness and Nonanticipativity Against Uncertainties [J].
Zhou, Yuzhou ;
Zhai, Qiaozhu ;
Wu, Lei .
IEEE TRANSACTIONS ON SMART GRID, 2022, 13 (06) :4218-4230