Short-term planning of a work shift for open-pit mines: A case study

被引:2
|
作者
Silva-Junior, Ademar L. [2 ,3 ,4 ]
Martins, Aldrin G. [5 ,6 ]
Pantuza-Jr, Guido [7 ]
Cota, Luciano P. [1 ,3 ]
Souza, Marcone J. F. [8 ]
机构
[1] Inst Tecnol Vale, BR-354000000 Ouro Preto, MG, Brazil
[2] Univ Fed Ouro Preto, Programa Posgrad Instrumentacao Controle & Automac, BR-35400000 Ouro Preto, Brazil
[3] Inst Tecnol Vale, BR-35400000 Ouro Preto, Brazil
[4] Vale SA, BR-35900900 Itabira, Brazil
[5] Fed Inst Minas Gerais, Dept Min, BR-36415000 Congonhas, MG, Brazil
[6] Themat Network Mat Engn REDEMAT, Grad Program Mat Engn, BR-35000000 Ouro Preto, Brazil
[7] Fed Inst Minas Gerais, BR-35057760 Governador Valadares, Brazil
[8] Univ Fed Ouro Preto, Dept Comp, BR-35400000 Ouro Preto, Brazil
来源
COGENT ENGINEERING | 2023年 / 10卷 / 01期
关键词
Short-term planning; open-pit mining; blending; truck allocation; mixed-integer linear programming; goal programming; MODEL; OPTIMIZATION; ALGORITHM; NETWORKS;
D O I
10.1080/23311916.2023.2168172
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This work deals with the short-term planning problem of a work shift for open-pit mines. The problem involves ore and waste fronts, shovels, heterogeneous truck fleets, and discharge points. The allocation of trucks is dynamic to allow multiple routes to be assigned to each truck. The problem consists of deciding which fronts must be mined and establishing the number of trucks, their routes, and the amount of material transported by them to each discharge point, satisfying a stripping ratio at the desired level. The objectives are to minimize the deviations from the targets for production, chemical grade, and particle size range of each control parameter at each plant and reduce the number of trucks needed for the process. To solve the problem, we developed a mixed-integer linear goal programming model and tested it using real data from an iron ore mine. The results showed that the proposed approach supports decision-makers in the sizing and allocation of truck fleets and in meeting the production and control parameter targets required by the ore processing plants according to the daily scenario, such as low availability of shovels and trucks, flexibility in ore quality, and need for increased production.
引用
收藏
页数:26
相关论文
共 50 条
  • [41] Method for Evaluation of Resources for Open-pit Mines Overlaid by Highway Projects
    Han, Bing
    Fu, Qiang
    2016 3RD INTERNATIONAL CONFERENCE ON POWER AND ENERGY SYSTEMS (PES 2016), 2016, 4 : 39 - 42
  • [42] Updating Road Information in Open-Pit Mines Using Truck Trajectories
    Tian Fengliang
    Sun Xiaoyu
    Gu Xiaowei
    Xin Fengyang
    Ma Li
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2019, 2019
  • [43] Collaborative Production Planning Based on an Intelligent Unmanned Mining System for Open-Pit Mines in the Industry 4.0 Era
    Liu, Kui
    Mei, Bin
    Li, Qing
    Sun, Shuai
    Zhang, Qingping
    MACHINES, 2024, 12 (06)
  • [44] Exact algorithms for production planning in mining considering the use of stockpiles and sequencing of power shovels in open-pit mines
    César Flores-Fonseca
    Rodrigo Linfati
    John Willmer Escobar
    Operational Research, 2022, 22 : 2529 - 2553
  • [45] Exact algorithms for production planning in mining considering the use of stockpiles and sequencing of power shovels in open-pit mines
    Flores-Fonseca, Cesar
    Linfati, Rodrigo
    Escobar, John Willmer
    OPERATIONAL RESEARCH, 2022, 22 (03) : 2529 - 2553
  • [46] Simulation Optimization of Shovel-Truck System in Open-Pit Mines Considering Rockmass Parameters
    Pathan, Shafi Muhammad
    Pathan, Abdul Ghani
    Memon, Muhammad Saad
    JOURNAL OF ADVANCED TRANSPORTATION, 2025, 2025 (01)
  • [47] Exploring Deep Learning for Dig-Limit Optimization in Open-Pit Mines
    Williams, Jacob
    Singh, Jagjit
    Kumral, Mustafa
    Ruiseco, Julian Ramirez
    NATURAL RESOURCES RESEARCH, 2021, 30 (03) : 2085 - 2101
  • [48] Research on Selection and Matching of Truck-Shovel in Oversized Open-Pit Mines
    Xu, Hai
    Liu, Fuchun
    Liao, Jiangnan
    Liu, Taoying
    APPLIED SCIENCES-BASEL, 2023, 13 (06):
  • [49] GROUNDWATER CONTROL IN OPEN-PIT MINES IN THE KURSK REGION OF THE SOVIET-UNION
    VOLKOV, YI
    MEKA, AI
    PONOMARENKO, YV
    WITHERSPOON, PA
    GALE, JE
    CIM BULLETIN, 1992, 85 (959): : 58 - 62
  • [50] A Decomposition-Based Heuristic for Collaborative Scheduling in a Network of Open-Pit Mines
    Blom, Michelle L.
    Burt, Christina N.
    Pearce, Adrian R.
    Stuckey, Peter J.
    INFORMS JOURNAL ON COMPUTING, 2014, 26 (04) : 658 - 676