Short-term planning of a work shift for open-pit mines: A case study

被引:2
|
作者
Silva-Junior, Ademar L. [2 ,3 ,4 ]
Martins, Aldrin G. [5 ,6 ]
Pantuza-Jr, Guido [7 ]
Cota, Luciano P. [1 ,3 ]
Souza, Marcone J. F. [8 ]
机构
[1] Inst Tecnol Vale, BR-354000000 Ouro Preto, MG, Brazil
[2] Univ Fed Ouro Preto, Programa Posgrad Instrumentacao Controle & Automac, BR-35400000 Ouro Preto, Brazil
[3] Inst Tecnol Vale, BR-35400000 Ouro Preto, Brazil
[4] Vale SA, BR-35900900 Itabira, Brazil
[5] Fed Inst Minas Gerais, Dept Min, BR-36415000 Congonhas, MG, Brazil
[6] Themat Network Mat Engn REDEMAT, Grad Program Mat Engn, BR-35000000 Ouro Preto, Brazil
[7] Fed Inst Minas Gerais, BR-35057760 Governador Valadares, Brazil
[8] Univ Fed Ouro Preto, Dept Comp, BR-35400000 Ouro Preto, Brazil
来源
COGENT ENGINEERING | 2023年 / 10卷 / 01期
关键词
Short-term planning; open-pit mining; blending; truck allocation; mixed-integer linear programming; goal programming; MODEL; OPTIMIZATION; ALGORITHM; NETWORKS;
D O I
10.1080/23311916.2023.2168172
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This work deals with the short-term planning problem of a work shift for open-pit mines. The problem involves ore and waste fronts, shovels, heterogeneous truck fleets, and discharge points. The allocation of trucks is dynamic to allow multiple routes to be assigned to each truck. The problem consists of deciding which fronts must be mined and establishing the number of trucks, their routes, and the amount of material transported by them to each discharge point, satisfying a stripping ratio at the desired level. The objectives are to minimize the deviations from the targets for production, chemical grade, and particle size range of each control parameter at each plant and reduce the number of trucks needed for the process. To solve the problem, we developed a mixed-integer linear goal programming model and tested it using real data from an iron ore mine. The results showed that the proposed approach supports decision-makers in the sizing and allocation of truck fleets and in meeting the production and control parameter targets required by the ore processing plants according to the daily scenario, such as low availability of shovels and trucks, flexibility in ore quality, and need for increased production.
引用
收藏
页数:26
相关论文
共 50 条
  • [31] Comparative analysis of three metaheuristics for short-term open pit block sequencing
    Mousavi, Amin
    Kozan, Erhan
    Liu, Shi Qiang
    JOURNAL OF HEURISTICS, 2016, 22 (03) : 301 - 329
  • [32] Lightweight obstacle detection for unmanned mining trucks in open-pit mines
    Liu, Guangwei
    Lei, Jian
    Guo, Zhiqing
    Chai, Senlin
    Ren, Chonghui
    SCIENTIFIC REPORTS, 2025, 15 (01):
  • [33] Dynamic phase-mining optimization in open-pit metal mines
    顾晓薇
    王青
    葛舒
    TransactionsofNonferrousMetalsSocietyofChina, 2010, 20 (10) : 1974 - 1980
  • [34] Turbo-blasting of borehole explosive charges in open-pit mines
    Muchnik, SV
    JOURNAL OF MINING SCIENCE, 2002, 38 (05) : 470 - 472
  • [35] Developing New Models for Flyrock Distance Assessment in Open-Pit Mines
    Shakeri, Jamshid
    Khoshalan, Hasel Amini
    Dehghani, Hesam
    Bascompta, Marc
    Onyelowe, Kennedy
    JOURNAL OF MINING AND ENVIRONMENT, 2022, 13 (02): : 375 - 389
  • [36] Open-Pit Mining Operational Planning using Multi Agent Systems
    Cohen, Miri Weiss
    Coelho, Vitor Nazario
    KNOWLEDGE-BASED AND INTELLIGENT INFORMATION & ENGINEERING SYSTEMS (KSE 2021), 2021, 192 : 1677 - 1686
  • [37] Concurrent open-pit mine production and in-pit crushing-conveying system planning
    Paricheh, Morteza
    Osanloo, Morteza
    ENGINEERING OPTIMIZATION, 2020, 52 (10) : 1780 - 1795
  • [38] Analysis and Prediction of the Meteorological Characteristics of Dust Concentrations in Open-Pit Mines
    Liu, Zhigao
    Zhang, Ruixin
    Ma, Jiayi
    Zhang, Wenyu
    Li, Lin
    SUSTAINABILITY, 2023, 15 (06)
  • [39] Dynamic phase-mining optimization in open-pit metal mines
    Gu Xiao-wei
    Wang Qing
    Ge Shu
    TRANSACTIONS OF NONFERROUS METALS SOCIETY OF CHINA, 2010, 20 (10) : 1974 - 1980
  • [40] Turbo-blasting of borehole explosive charges in open-pit mines
    Muchnik S.V.
    Journal of Mining Science, 2002, 38 (5) : 470 - 472