Performance of modified first-stage French Vertical Flow Constructed Wetlands under extreme operational conditions

被引:2
作者
Arevalo-Durazno, Maria Belen [1 ]
Zumalacarregui, Jorge Alejandro Garcia [2 ,3 ]
Ho, Long [4 ]
Narvaez, Andrea [2 ]
Alvarado, Andres [2 ,5 ]
机构
[1] Univ Azuay, Fac Ciencia & Tecnol, Ave 24 Mayo 7-77 & Hernan Malo, Cuenca, Ecuador
[2] Univ Cuenca, Dept Recursos Hidr & Ciencias Ambientales, Ave Victor Albornoz & Calle Cerezos, Cuenca, Ecuador
[3] Univ Cuenca, Fac Ciencias Agr, Ave 12 Octubre & Diego Tapia, Cuenca, Ecuador
[4] Univ Ghent, Dept Anim Sci & Aquat Ecol, Coupure Links 653, Ghent, Belgium
[5] Univ Cuenca, Fac Ingn, Ave Victor Albornoz & Calle Cerezos, Cuenca, Ecuador
关键词
combined sewer wastewater; First-Stage French Vertical Flow Constructed Wetlands; hydraulic loading rate; northern tropical andes; operation conditions; WASTE-WATER; DESIGN;
D O I
10.2166/wst.2023.201
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Operation conditions considerably affect the removal efficiency of wastewater treatment systems, and yet we still lack data on how these systems function under extreme dilution rates and climatic conditions at high altitudes. Here, we applied two modified First-Stage French Vertical Flow Constructed Wetlands (FS-FVFCWs) for sewage treatment in Northern Tropical Andes. Specifically, within 18 months, we conducted a pilot-scale experiment at two hydraulic loading rates (HLRs) of 0.94 and 0.56 m d(-1), representing 2.5 and 1.5 times the recommended design values, with two different feeding/resting periods to investigate the impact of HLRs and operational strategy on system performance. We found that chemical oxygen demand (COD) and total suspended solids (TSS) removal was satisfactory, with average values of 53 & PLUSMN; 18% and 69 & PLUSMN; 16%, respectively. Moreover, reducing HLRs resulted in higher removal efficiency for COD, from 46 & PLUSMN; 15% to 64 & PLUSMN; 15%, but had no impact on TSS removal, with 3 days of feeding and 6 days of resting. For an equal time of feeding and resting, COD and TSS removals were not affected by the modified HLR. These findings suggest that high HLRs can be applied to FS-FVFCW without compromising the system operation and obtaining satisfactory results, leading to opportunities to reduce areas and costs.
引用
收藏
页码:220 / 232
页数:13
相关论文
共 36 条
  • [21] Removal of nutrients from wastewater with Canna indica L. under different vertical-flow constructed wetland conditions
    Cui, Lihua
    Ouyang, Ying
    Lou, Qian
    Yang, Fengle
    Chen, Ying
    Zhu, Wenling
    Luo, Shiming
    ECOLOGICAL ENGINEERING, 2010, 36 (08) : 1083 - 1088
  • [22] Multiple linear modeling of outflow nitrogen dynamics in vertical-flow constructed wetlands under two different operating states
    Zhang, Shiyang
    Li, Gu
    Li, Xiaoli
    Tao, Ling
    ECOLOGICAL ENGINEERING, 2015, 81 : 53 - 61
  • [23] Phosphorus removal performance and biological dephosphorization process in treating reclaimed water by Integrated Vertical-flow Constructed Wetlands (IVCWs)
    Du, Lu
    Chen, Qianru
    Liu, Panpan
    Zhang, Xia
    Wang, Huihui
    Zhou, Qiaohong
    Xu, Dong
    Wu, Zhenbin
    BIORESOURCE TECHNOLOGY, 2017, 243 : 204 - 211
  • [24] Effect of Loading Frequency on Ammonia-Nitrogen Removal Kinetics in Early-Stage Pilot-Scale Vertical Flow Constructed Wetlands Treating Landfill Leachate
    Lott, Dreyton J.
    Robey, Nicole M.
    Laux, Steven
    Townsend, Timothy G.
    ACS ES&T ENGINEERING, 2023, : 183 - 192
  • [25] Impact of design and operation variables on the performance of vertical-flow constructed wetlands and intermittent sand filters treating pond effluent
    Torrens, Antonina
    Molle, Pascal
    Boutin, Catherine
    Salgot, Miquel
    WATER RESEARCH, 2009, 43 (07) : 1851 - 1858
  • [26] Performance evaluation of integrating Vertical Garden Constructed Wetlands (VGCWs) with diverse plant species and modified media for treating septic tank effluent
    Koottatep, Thammarat
    Pussayanavin, Tatchai
    Prapasriket, Pimchanok
    Saetan, Pitchaya
    Suwannakeaw, Mayulee
    Polprasert, Chongrak
    ECOLOGICAL ENGINEERING, 2024, 205
  • [27] Performance Evaluation of First-Order Hydraulic Models for COD Removal in Horizontal Subsurface-Flow Constructed Wetlands
    Thomaz Queluz, Joao Gabriel
    Drizo, Aleksandra
    Sanchez-Roman, Rodrigo Maximo
    JOURNAL OF ENVIRONMENTAL ENGINEERING, 2017, 143 (10)
  • [28] Effects of loading, resting period, temperature, porous media, vegetation and aeration on performance of pilot-scale vertical flow constructed wetlands
    Stefanakis, Alexandros I.
    Tsihrintzis, Vassilios A.
    CHEMICAL ENGINEERING JOURNAL, 2012, 181 : 416 - 430
  • [29] Demonstration and performance analysis of on-beach public toilet with a decentralised modified French vertical flow constructed wetland and ex situ electrochlorination integrated treatment system
    Gogoi, Jayanta Kumar
    Sharma, Priya
    Talekar, Guruprasad
    Punyapwar, Swapnil
    Namdev, Keyur
    Mutnuri, Srikanth
    WATER PRACTICE AND TECHNOLOGY, 2024, 19 (04) : 1427 - 1439
  • [30] Efficiency of pilot-scale horizontal subsurface flow constructed wetlands and microbial community composition operating under tropical conditions
    Llanos-Lizcano, Alejandro
    Barraza, Eyvis
    Narvaez, Arturo
    Varela, Lourdes
    Caselles-Osorio, A.
    INTERNATIONAL JOURNAL OF PHYTOREMEDIATION, 2019, 21 (01) : 34 - 42