Performance of modified first-stage French Vertical Flow Constructed Wetlands under extreme operational conditions

被引:2
作者
Arevalo-Durazno, Maria Belen [1 ]
Zumalacarregui, Jorge Alejandro Garcia [2 ,3 ]
Ho, Long [4 ]
Narvaez, Andrea [2 ]
Alvarado, Andres [2 ,5 ]
机构
[1] Univ Azuay, Fac Ciencia & Tecnol, Ave 24 Mayo 7-77 & Hernan Malo, Cuenca, Ecuador
[2] Univ Cuenca, Dept Recursos Hidr & Ciencias Ambientales, Ave Victor Albornoz & Calle Cerezos, Cuenca, Ecuador
[3] Univ Cuenca, Fac Ciencias Agr, Ave 12 Octubre & Diego Tapia, Cuenca, Ecuador
[4] Univ Ghent, Dept Anim Sci & Aquat Ecol, Coupure Links 653, Ghent, Belgium
[5] Univ Cuenca, Fac Ingn, Ave Victor Albornoz & Calle Cerezos, Cuenca, Ecuador
关键词
combined sewer wastewater; First-Stage French Vertical Flow Constructed Wetlands; hydraulic loading rate; northern tropical andes; operation conditions; WASTE-WATER; DESIGN;
D O I
10.2166/wst.2023.201
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Operation conditions considerably affect the removal efficiency of wastewater treatment systems, and yet we still lack data on how these systems function under extreme dilution rates and climatic conditions at high altitudes. Here, we applied two modified First-Stage French Vertical Flow Constructed Wetlands (FS-FVFCWs) for sewage treatment in Northern Tropical Andes. Specifically, within 18 months, we conducted a pilot-scale experiment at two hydraulic loading rates (HLRs) of 0.94 and 0.56 m d(-1), representing 2.5 and 1.5 times the recommended design values, with two different feeding/resting periods to investigate the impact of HLRs and operational strategy on system performance. We found that chemical oxygen demand (COD) and total suspended solids (TSS) removal was satisfactory, with average values of 53 & PLUSMN; 18% and 69 & PLUSMN; 16%, respectively. Moreover, reducing HLRs resulted in higher removal efficiency for COD, from 46 & PLUSMN; 15% to 64 & PLUSMN; 15%, but had no impact on TSS removal, with 3 days of feeding and 6 days of resting. For an equal time of feeding and resting, COD and TSS removals were not affected by the modified HLR. These findings suggest that high HLRs can be applied to FS-FVFCW without compromising the system operation and obtaining satisfactory results, leading to opportunities to reduce areas and costs.
引用
收藏
页码:220 / 232
页数:13
相关论文
共 36 条
  • [1] Performance of the first stage of the French system of vertical flow constructed wetlands with only two units in parallel: influence of pulse time and instantaneous hydraulic loading rate
    Garcia Zumalacarregui, Jorge A.
    von Sperling, Marcos
    WATER SCIENCE AND TECHNOLOGY, 2018, 78 (04) : 848 - 859
  • [2] Performance of a French system of vertical flow wetlands (first stage) operating with an extended feeding cycle
    Trein, Camila Maria
    Garcia Zumalacarregui, Jorge Alejandro
    de Andrade Moraes, Mirene Augusta
    von Sperling, Marcos
    WATER SCIENCE AND TECHNOLOGY, 2019, 80 (08) : 1443 - 1455
  • [3] Reduction of area and influence of the deposit layer in the first stage of a full-scale French system of vertical flow constructed wetlands in a tropical area
    Trein, Camila Maria
    Garcia Zumalacarregui, Jorge Alejandro
    de Andrade Moraes, Mirene Augusta
    von Sperling, Marcos
    WATER SCIENCE AND TECHNOLOGY, 2019, 80 (02) : 347 - 356
  • [4] Improving the performance of vertical flow constructed wetlands by modifying the filtering media structure
    Carballeira, Tania
    Ruiz, Isabel
    Soto, Manuel
    ENVIRONMENTAL SCIENCE AND POLLUTION RESEARCH, 2021, 28 (40) : 56852 - 56864
  • [5] Kinetic modelling and performance evaluation of vertical subsurface flow constructed wetlands in tropics
    Weerakoon, G. M. P. R.
    Jinadasa, K. B. S. N.
    Manatunge, Jagath
    Wijesiri, Buddhi
    Goonetilleke, Ashantha
    JOURNAL OF WATER PROCESS ENGINEERING, 2020, 38
  • [6] First stage of the French vertical flow constructed wetland system: experiments with the reduction of surface area and number of units
    Manjate, E. S.
    Lana, L. C. O.
    Moraes, D. C.
    Vasconcellos, G. R.
    Maciel, G. R. M.
    von Sperling, M.
    JOURNAL OF WATER SANITATION AND HYGIENE FOR DEVELOPMENT, 2015, 5 (01) : 50 - 55
  • [7] Removal of abamectin and conventional pollutants in vertical flow constructed wetlands with Fe-modified biochar
    Sha, Nai-Qing
    Wang, Guo-Hao
    Li, Yan-Hong
    Bai, Shao-Yuan
    RSC ADVANCES, 2020, 10 (72) : 44171 - 44182
  • [8] Influence of earthworm presence and hydraulic loading rate on the performance of vertical flow constructed wetlands
    Atalla, Alexandre
    Pelissari, Catiane
    de Oliveira, Milina
    de Souza Pereira, Mariana Antonio
    Cavalheri, Priscila Sabioni
    Sezerino, Pablo H.
    Correa Magalhaes Filho, Fernando Jorge
    ENVIRONMENTAL TECHNOLOGY, 2021, 42 (17) : 2700 - 2708
  • [9] Performance study of vertical flow constructed wetlands for phosphorus removal with water quenched slag as a substrate
    Li, Haibo
    Li, Yinghua
    Gong, Zongqiang
    Li, Xiaodong
    ECOLOGICAL ENGINEERING, 2013, 53 : 39 - 45
  • [10] Performance evaluation of horizontal and vertical flow constructed wetlands as tertiary treatment option for secondary effluents
    Arun Kumar Thalla
    C. P. Devatha
    K. Anagh
    Elsa Sony
    Applied Water Science, 2019, 9