Power generation expansion planning considering natural disaster scenarios under carbon emission trajectory constraints

被引:1
|
作者
Liao, Wang [1 ]
Liu, Dong [1 ]
Xue, Yusheng [2 ]
Wu, Yufeng [1 ]
Xue, Feng [2 ]
Chang, Kang [2 ]
机构
[1] Shanghai Jiao Tong Univ, Key Lab Control Power Transmiss & Convers, Minist Educ, Shanghai 200240, Peoples R China
[2] NARI Grp Corp, State Grid Elect Power Res Inst, Nanjing 211106, Jiangsu, Peoples R China
关键词
Generation expansion planning (GEP); Carbon emission trajectory; Natural disaster; Renewable energy; Carbon neutrality; ENERGY-STORAGE; SYSTEM; PENETRATION; MODEL; OPTIMIZATION; FLEXIBILITY; ELECTRICITY; ALGORITHM; IMPACT;
D O I
10.1016/j.apenergy.2024.122832
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
The intensification of global climate change has led to a widespread consensus on carbon reduction, with the power industry being the principal contributor to carbon emissions necessitating an inevitable transition of its energy structure. Concomitantly, the escalating frequency of natural disasters caused by extreme weather presents formidable challenges to both secure power supply and the low-carbon transition of the power system. To fulfill the developmental requirements of a low-carbon power system and address the carbon emission risks imposed by natural disasters, this paper proposes a bi-level model for generation expansion planning (GEP) that incorporates constraints on the carbon emission trajectory and the influence of natural disasters. The planninglevel model optimizes investment costs of various generation technologies and energy storage (ES), as well as the overall operational expenses over the planning period, with an objective to minimize them. It incorporates carbon emission trajectory constraints and policy constraints, such as carbon peaking, carbon neutrality and renewable energy (RE) penetration rates, in order to optimize the planning installed capacity of power sources. The operational-level model aims to minimize typical daily operating costs while also simulating power unit outputs in routine and disaster scenarios. A case study is conducted in a disaster-prone province in southern China to analyze the power generation expansion planning and the trajectory of carbon emissions from 2020 to 2060 under different scenarios. The simulation results show that compared to thermal power, the planning scheme mainly focused on RE with ES is better suited to achieve the goal of a low-carbon transition of the power grid. Moreover, after considering natural disasters, the cost and carbon emissions of power system planning are higher, and the risk of carbon emissions increases with the severity of disasters.
引用
收藏
页数:16
相关论文
共 50 条
  • [1] Power generation expansion planning approach considering carbon emission constraints
    Mehedi, Hasan
    Wang, Xiaobin
    Ye, Shilong
    Xue, Guiting
    Shariful, Islam Md
    Shi, Fang
    GLOBAL ENERGY INTERCONNECTION-CHINA, 2023, 6 (02): : 127 - 140
  • [2] Multi-regional power generation expansion planning with air pollutants emission constraints
    Chen, Siyuan
    Liu, Pei
    Li, Zheng
    RENEWABLE & SUSTAINABLE ENERGY REVIEWS, 2019, 112 : 382 - 394
  • [3] Power System Capacity Expansion Under Higher Penetration of Renewables Considering Flexibility Constraints and Low Carbon Policies
    Chen, Xinyu
    Lv, Jiajun
    McElroy, Michael B.
    Han, Xingning
    Nielsen, Chris P.
    Wen, Jinyu
    IEEE TRANSACTIONS ON POWER SYSTEMS, 2018, 33 (06) : 6240 - 6253
  • [4] A Model for Generation Expansion Planning in Power Systems Considering Emission Costs
    Akbarzade, Hossein
    Amraee, Turaj
    2018 SMART GRID CONFERENCE (SGC), 2018, : 78 - 82
  • [5] Power Generation Planning Optimization Model Considering Carbon Emission
    Zhong, Junchen
    Qi, Yanlong
    Hao, Xin
    Liu, Rui
    Luo, Zongjie
    Lin, Haisheng
    2022 IEEE/IAS INDUSTRIAL AND COMMERCIAL POWER SYSTEM ASIA (I&CPS ASIA 2022), 2022, : 1050 - 1054
  • [6] A robust model for generation and transmission expansion planning with emission constraints
    Ahmadi, Abdollah
    Mavalizadeh, Hani
    Nezhad, Ali Esmaeel
    Siano, Pierluigi
    Shayanfar, Heidar Ali
    Hredzak, Branislav
    SIMULATION-TRANSACTIONS OF THE SOCIETY FOR MODELING AND SIMULATION INTERNATIONAL, 2020, 96 (07): : 605 - 621
  • [7] Power system capacity expansion planning model considering carbon emissions constraints
    Mejia Giraldo, Diego Adolfo
    Lopez Lezama, Jesus Maria
    Gallego Pareja, Luis Alfonso
    REVISTA FACULTAD DE INGENIERIA-UNIVERSIDAD DE ANTIOQUIA, 2012, (62): : 114 - 125
  • [8] Generation Expansion Planning for Solvent-Storaged Carbon Capture Power Plants Considering the Internalization of the Carbon Emission Effects
    Liang, Shuhao
    Lou, Suhua
    Wu, Yaowu
    Peng, Yuan
    IEEE TRANSACTIONS ON POWER SYSTEMS, 2024, 39 (02) : 2653 - 2667
  • [9] Multi-objective transmission expansion planning considering multiple generation scenarios
    Correa Florez, Carlos A.
    Bolanos Ocampo, Ricardo A.
    Escobar Zuluaga, Antonio H.
    INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2014, 62 : 398 - 409
  • [10] Power Generation and Transmission Expansion Planning under Uncertainty considering Flexibility in Generation Investments
    Arevalo, Mario
    Rios, Daniel
    Baum, Gabriel
    Blanco, Gerardo
    2017 CONGRESO INTERNACIONAL DE INNOVACION Y TENDENCIAS EN INGENIERIA (CONIITI), 2017,