Classifying and evaluating enablers influencing modular construction utilization in the construction sector: A fuzzy synthetic evaluation

被引:24
|
作者
Ali, Ali Hassan [1 ]
Kineber, Ahmed Farouk [2 ,3 ]
Qaralleh, Thikryat Jibril Obied [4 ]
Alaboud, Naif Sultan [5 ]
Daoud, Ahmed Osama [1 ]
机构
[1] British Univ Egypt BUE, Fac Engn, Dept Civil Engn, El Sherouk 11837, Cairo, Egypt
[2] Prince Sattam Bin Abdulaziz Univ, Coll Engn Al Kharj, Dept Civil Engn, Al Kharj 11942, Saudi Arabia
[3] Canadian Int Coll, Canadian Higher Engn Inst, Dept Civil Engn, 6th October City 12577, Egypt
[4] Prince Sattam Bin Abdulaziz Univ, Coll Educ, Al Kharj, Saudi Arabia
[5] Umm Al Qura Univ, Coll Engn & Islamic Architecture, Dept Islamic Architecture, Mecca, Saudi Arabia
关键词
Developing Countries; Modular Construction; Enablers; Exploratory Factor Analysis; Fuzzy Synthetic Evaluation; SUSTAINABILITY; SUPPORT;
D O I
10.1016/j.aej.2023.07.026
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The use of modular construction (MC) is well-established in developed countries and is known to promote sustainability. However, MC is not widely utilised in developing countries. To address this issue, a study was conducted to identify enablers that can increase the adoption of MC in developing countries, specifically for residential projects. A survey was conducted to determine the relative value of 21 enablers that boost the adoption of MC. The data collected was analysed using Exploratory Factor Analysis (EFA), which classified the enablers into four main components: Optimization, Planning and Management, Preparation, and Promotion and Improvement. Then, Fuzzy Synthetic Evaluation (FSE) was employed to rank these four components, where it was found that "Optimization" is the top performing component while " Promotion and Improvement " is the least performing component. The study's results provide a roadmap for the Egyptian construction industry to adopt MC, which can improve the construction sector, particularly in residential construction. Additionally, the findings of this research help fill a gap in knowledge about the enablers that can enhance the use of MC in developing countries.
引用
收藏
页码:45 / 55
页数:11
相关论文
共 50 条
  • [21] Evaluating Modular House Construction Projects: A Delphi Method Enhanced by Conversational AI
    Maceika, Augustinas
    Bugajev, Andrej
    Sostak, Olga R.
    BUILDINGS, 2024, 14 (06)
  • [22] ARank-FSC: Assessment and ranking of Industry 4.0 enablers using fuzzy SWARA and fuzzy COPRAS in Indian construction
    Tayal, Ankur
    Agrawal, Saurabh
    Yadav, Rajan
    INTELLIGENT DECISION TECHNOLOGIES-NETHERLANDS, 2024, 18 (02): : 663 - 683
  • [23] Effective utilization of sugar industry waste in Indian construction sector: A geospatial approach
    G. Athira
    A. Bahurudeen
    Prasanta K. Sahu
    Manu Santhanam
    Prakash Nanthagopalan
    S. Lalu
    Journal of Material Cycles and Waste Management, 2020, 22 : 724 - 736
  • [24] Evaluation of Occupational Safety Culture in Construction Sector in the Context of Sustainability
    Erdal, Mursel
    Isik, Nihat Sinan
    Firat, Seyhan
    PROCEEDINGS OF 3RD INTERNATIONAL SUSTAINABLE BUILDINGS SYMPOSIUM (ISBS 2017), VOL 2, 2018, 7 : 361 - 365
  • [25] Effective utilization of sugar industry waste in Indian construction sector: A geospatial approach
    Athira, G.
    Bahurudeen, A.
    Sahu, Prasanta K.
    Santhanam, Manu
    Nanthagopalan, Prakash
    Lalu, S.
    JOURNAL OF MATERIAL CYCLES AND WASTE MANAGEMENT, 2020, 22 (03) : 724 - 736
  • [26] Fuzzy synthetic evaluation of intervention measures to enhance the psychological health and well-being of expatriate construction professionals
    Abdalla, Alaeldin
    Li, Xiaodong
    Yang, Fan
    Lou, Qianhui
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2024,
  • [27] A fuzzy synthetic evaluation of capabilities for improving supply chain resilience of industrialised construction: a Hong Kong case study
    Ekanayake, E. M. A. C.
    Shen, Geoffrey Q. P.
    Kumaraswamy, Mohan M.
    PRODUCTION PLANNING & CONTROL, 2023, 34 (07) : 623 - 640
  • [28] Developing a fuzzy synthetic evaluation model for risk assessment: a case of Addis-Djibouti railway construction project
    Gashaw, Tesfaye
    Jilcha, Kassu
    INNOVATIVE INFRASTRUCTURE SOLUTIONS, 2022, 7 (02)
  • [29] Developing a fuzzy synthetic evaluation model for risk assessment: a case of Addis-Djibouti railway construction project
    Tesfaye Gashaw
    Kassu Jilcha
    Innovative Infrastructure Solutions, 2022, 7
  • [30] Mapping Green, Lean, Six Sigma enablers through the lens of a construction sector: an emerging economy's perspective
    Hussain, Kramat
    He, Zhen
    Ahmad, Naveed
    Iqbal, Muzaffar
    Nazneen, Shama
    JOURNAL OF ENVIRONMENTAL PLANNING AND MANAGEMENT, 2023, 66 (04) : 779 - 812