Study the delays and conflicts for construction projects and their mutual relationship: A review

被引:31
|
作者
Tariq, Junaid [1 ]
Gardezi, S. Shujaa Safdar [1 ]
机构
[1] Capital Univ Sci & Technol CUST, Dept Civil Engn, Islamabad Expressway,Kahuta Rd,Zone V, Islamabad 44000, Pakistan
关键词
Construction delays; Conflicts; Mutual relationship; Common causes; Jenks optimization; TRANSACTION-COST ECONOMICS; TIME-OVERRUN; MANAGEMENT STRATEGIES; HIGHWAY PROJECTS; ROAD; DISPUTES; INDUSTRY; SYSTEM; CONTRACTORS; FRAMEWORK;
D O I
10.1016/j.asej.2022.101815
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Delays and conflicts (D&Cs) are adversely affecting the performance of construction projects. They have separately been addressed by many authors but the mutual relationship among them is still a key grey area. Therefore, this study aims to explore this hidden relationship. Literature was reviewed to identify the previous ranking of D&Cs causes to develop a global ranking and to explore other hidden aspects of mutual relationships. Data were classified through Jenks optimization that resulted in the identification of, the top five causes of D&Cs in a global perspective and commonality among them. Among the top five identified global causes of D&Cs, the common causes are; (1) financial problems on behalf of the owner, (2) Change orders/ Variations, and (3) Lack of communication/ Poor relationship. Such exploration of hidden relationships among D&Cs will not only improve construction management strategies but will also define new pathways for future research to secure project success parameters.(c) 2022 THE AUTHORS. Published by Elsevier BV on behalf of Faculty of Engineering, Ain Shams University This is an open access article under the CC BY-NC-ND license (http://creativecommons.org/licenses/by-ncnd/4.0/).
引用
收藏
页数:14
相关论文
共 50 条
  • [1] Causes of delays in road construction projects: a systematic review
    Kumar, Modish
    Kumari, Santosh
    JOURNAL OF FINANCIAL MANAGEMENT OF PROPERTY AND CONSTRUCTION, 2025,
  • [2] THE EFFECTS OF DELAYS IN ALGERIAN CONSTRUCTION PROJECTS: AN EMPIRICAL STUDY
    Salhi, Roumeissa
    Messaoudi, Karima
    CIVIL AND ENVIRONMENTAL ENGINEERING REPORTS, 2021, 31 (02) : 218 - 254
  • [3] CONCURRENT DELAYS IN CONSTRUCTION PROJECTS
    KRAIEM, ZM
    DIEKMANN, JE
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1987, 113 (04): : 591 - 602
  • [4] Attribute Hierarchy of Conflicts in Construction Projects: A Case Study of Sindh
    Khahro, Shabir Hussain
    Memon, Fareed Ahmed
    Talpur, Mir Aftab Hussain
    MEHRAN UNIVERSITY RESEARCH JOURNAL OF ENGINEERING AND TECHNOLOGY, 2015, 34 (04) : 447 - 452
  • [5] An Empirical Study on the Generation Mechanism of NIMBY Conflicts of Construction Projects
    Guang-she Jia
    Song-yu Yan
    Wen-jun Wang
    Ralf Müller
    Chen Lin
    Frontiers of Engineering Management, 2016, (01) : 39 - 49
  • [6] An Empirical Study on the Generation Mechanism of NIMBY Conflicts of Construction Projects
    Jia, Guang-she
    Yan, Song-yu
    Wang, Wen-jun
    Mueller, Ralf
    Lin, Chen
    FRONTIERS OF ENGINEERING MANAGEMENT, 2016, 3 (01) : 39 - 49
  • [7] An Empirical Study on the Generation Mechanism of NIMBY Conflicts of Construction Projects
    Guangshe Jia
    Songyu Yan
    Wenjun Wang
    Ralf Mller
    Chen Lin
    Frontiers of Engineering Management, 2016, 3 (01) : 39 - 49
  • [8] A Review on Significant Factors Causing Delays in Saudi Arabia Construction Projects
    Alajmi, Abdulali Mohammed
    Memon, Zubair Ahmed
    SMART CITIES, 2022, 5 (04): : 1465 - 1487
  • [9] Stakeholder Relationship in Construction Projects: A Mixed Methods Review
    Yang, Yingnan
    Wei, Ziyi
    Zhang, Zhicheng
    BUILDINGS, 2023, 13 (12)
  • [10] Relationship Management in Construction Projects: Systematic Literature Review
    Daboun, Omar
    Yusof, Aminah Md
    Khoso, Ali Raza
    ENGINEERING MANAGEMENT JOURNAL, 2023, 35 (02) : 120 - 143