共 33 条
- [1] Agrawal R., 1993, SIGMOD Record, V22, P207, DOI 10.1145/170036.170072
- [3] Novel method for schedule risks assessment in construction projects from perspective of risk chain [J]. Tongji Daxue Xuebao/Journal of Tongji University, 2015, 43 (03): : 468 - 474
- [4] Chapman CB, 1987, RISK ANAL LARGE PROJ, P544
- [5] Chen S, 2020, Design and Prototype Implementation of Urban Rail Operation Safety Guarantee System Based on Risk Chain
- [6] China Ministry of Transport,, 2013, GB/T 30012-2013
- [7] Das Subasish, 2018, International Journal of Transportation Science and Technology, V7, P114, DOI 10.1016/j.ijtst.2018.02.001
- [10] RISK MANAGEMENT PERCEPTIONS AND TRENDS OF US CONSTRUCTION [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1995, 121 (04): : 422 - 429