Research on key risk chain mining method for urban rail transit operations: A new approach to risk management

被引:1
作者
Shi, Gan [1 ]
Ding, Xiaobing [1 ,3 ]
Hong, Chen [1 ]
Liu, Zhigang [1 ]
Zhao, Lu [2 ,4 ]
机构
[1] Shanghai Univ Engn Sci, Sch Urban Rail Transportat, Shanghai, Peoples R China
[2] Wenzhou Polytech, Ruian Coll, Wenzhou, Zhejiang, Peoples R China
[3] 333 Longteng Rd, Shanghai 201620, Peoples R China
[4] Ciwei Branch Rd, Wenzhou, Zhejiang, Peoples R China
关键词
Urban rail transit; Risk chain; H-Apriori association rule algorithm; Key risk source; Risk control plan; SAFETY;
D O I
10.1016/j.ijtst.2023.11.004
中图分类号
U [交通运输];
学科分类号
08 ; 0823 ;
摘要
To ensure the safety of urban rail transit operations and uncover the transmission dynamics of risk sources, a key risk chain mining method for urban rail transit operation is proposed. Firstly, the H-Apriori association rule algorithm is proposed for the characteristics of low frequency but high riskiness of high hazard degree risk sources in urban rail transit operation, which adds a new hazard degree evaluation index to the traditional Apriori algorithm and couples with support degree two-dimensionally to mine the strong association rules among risk sources. Secondly, we construct a weighted risk network with risk sources as network nodes and strong association rules as network edges, and propose a key risk chain mining method for urban rail transit operation based on path search theory to mine key risk chains from the weighted risk network. Finally, using the actual urban rail transit operation data of a city in China as an example, a total of 17 key risk chains are mined, and then 5 key risk sources and 8 key chain break locations are obtained by riskiness and frequency analysis of key risk chains, and control plans are proposed. The research outcomes introduce a novel approach to mining risk chains in urban rail transit operations, shedding light on the propagation mechanisms, triggering probabilities, and degrees of unsafety associated with risk sources. The results not only provide theoretical support but also offer methodological guidance for pinpointing locations of risk chain breaks and refining the control of risk sources. (c) 2023 Tongji University and Tongji University Press. Publishing Services by Elsevier B.V. This is an open access article under the CC BY-NC-ND license (http://creativecommons.org/ licenses/by-nc-nd/4.0/).
引用
收藏
页码:29 / 43
页数:15
相关论文
共 33 条
  • [1] Agrawal R., 1993, SIGMOD Record, V22, P207, DOI 10.1145/170036.170072
  • [2] Investigation of tugboat accidents severity: An application of association rule mining algorithms
    Cakir, Erkan
    Fiskin, Remzi
    Sevgili, Coskan
    [J]. RELIABILITY ENGINEERING & SYSTEM SAFETY, 2021, 209
  • [3] Novel method for schedule risks assessment in construction projects from perspective of risk chain
    Cao, Jiming
    Shen, Liangfa
    Peng, Wei
    Ma, Teng
    [J]. Tongji Daxue Xuebao/Journal of Tongji University, 2015, 43 (03): : 468 - 474
  • [4] Chapman CB, 1987, RISK ANAL LARGE PROJ, P544
  • [5] Chen S, 2020, Design and Prototype Implementation of Urban Rail Operation Safety Guarantee System Based on Risk Chain
  • [6] China Ministry of Transport,, 2013, GB/T 30012-2013
  • [7] Das Subasish, 2018, International Journal of Transportation Science and Technology, V7, P114, DOI 10.1016/j.ijtst.2018.02.001
  • [8] The safety management of urban rail transit based on operation fault log
    Ding, Xiaobing
    Yang, Xuechen
    Hu, Hua
    Liu, Zhigang
    [J]. SAFETY SCIENCE, 2017, 94 : 10 - 16
  • [10] RISK MANAGEMENT PERCEPTIONS AND TRENDS OF US CONSTRUCTION
    KANGARI, R
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1995, 121 (04): : 422 - 429