A data driven real-time perception method of rock condition in TBM construction

被引:9
作者
Li, Xu [1 ]
Wu, Lei-jie [1 ]
Wang, Yu-jie [1 ,2 ]
Liu, Huan [1 ]
Chen, Zu-yu [1 ,2 ]
Jing, Liu-jie [3 ]
Wang, Yu [4 ]
机构
[1] Beijing Jiaotong Univ, Key Lab Urban Underground Engn, Minist Educ, Beijing 100044, Peoples R China
[2] China Inst Water Resources & Hydropower Res, Dept Geotech Engn, Beijing, Peoples R China
[3] China Railway Engn Equipment Grp Co Ltd, Zhengzhou 450016, Peoples R China
[4] City Univ Hong Kong, Dept Architecture & Civil Engn, Kowloon, Hong Kong 999077, Peoples R China
基金
国家重点研发计划;
关键词
tunnel boring machine; tunnel construction; collapsible rock mass; real-time early warning; tunnel collapse; MASS CLASSIFICATION-SYSTEM; SHARED BIG DATASET; TUNNEL; PREDICTION; FEEDBACK; ZONES;
D O I
10.1139/cgj-2023-0168
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
In tunnel boring machine (TBM) construction, the presence of collapsible rock mass (CRM) can lead to accidents such as collapse and jamming. This study presents a novel CRM early warning strategy based on real-time TBM rock fragmentation data to improve safety and efficiency in CRM conditions. The strategy includes a qualitative classification model and a quantitative probability model for CRM identification. The results indicate that the distribution dissimilarity index beta effectively reflect the significance of variables across CRM and non-CRM datasets. Various parameters, including TPI, FPI, WR, and AF, show discriminatory ability between CRM and non-CRM samples. In particular, the CRM-weighted index, which combines the strengths of the individual indices, achieves a distributional dissimilarity index of 1.05, significantly higher than any of the individual indices. The qualitative classification model proves effective in identifying samples from collapse areas, demonstrating ability to identify samples located in adverse geological condition. The quantitative model shows that the probability of CRM is generally higher in adverse geological area samples, particularly in zones where collapse has occurred, with a CRM probability is approaching 1. The proposed strategy provides accurate early warnings to prevent collapse accidents and represents a practical approach to improving the safety and efficiency.
引用
收藏
页码:1018 / 1034
页数:17
相关论文
共 32 条
  • [11] A case study of TBM performance prediction using field tunnelling tests in limestone strata
    Jing, Liu-jie
    Li, Jian-bin
    Yang, Chen
    Chen, Shuai
    Zhang, Na
    Peng, Xing-xin
    [J]. TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2019, 83 : 364 - 372
  • [12] Li Chengbin, 2020, IOP Conference Series: Earth and Environmental Science, V570, DOI 10.1088/1755-1315/570/4/042055
  • [13] Feedback on a shared big dataset for intelligent TBM Part II: Application and forward look
    Li, Jian-Bin
    Chen, Zu-Yu
    Li, Xu
    Jing, Liu-Jie
    Zhang, Yun-Pei
    Xiao, Hao-Han
    Wang, Shuang-Jing
    Yang, Wen-Kun
    Wu, Lei-Jie
    Li, Peng-Yu
    Li, Hai-Bo
    Yao, Min
    Fan, Li-Tao
    [J]. UNDERGROUND SPACE, 2023, 11 : 26 - 45
  • [14] Feedback on a shared big dataset for intelligent TBM Part I: Feature extraction and machine learning methods
    Li, Jian-Bin
    Chen, Zu-Yu
    Li, Xu
    Jing, Liu-Jie
    Zhangf, Yun-Pei
    Xiao, Hao-Han
    Wang, Shuang-Jing
    Yang, Wen-Kun
    Wu, Lei-Jie
    Li, Peng -Yu
    Li, Hai -Bo
    Yao, Min
    Fan, Li -Tao
    [J]. UNDERGROUND SPACE, 2023, 11 : 1 - 25
  • [15] Advanced prediction of tunnel boring machine performance based on big data
    Li, Jinhui
    Li, Pengxi
    Guo, Dong
    Li, Xu
    Chen, Zuyu
    [J]. GEOSCIENCE FRONTIERS, 2021, 12 (01) : 331 - 338
  • [16] In situ monitoring of rockburst nucleation and evolution in the deeply buried tunnels of Jinping II hydropower station
    Li, Shaojun
    Feng, Xia-Ting
    Li, Zhanhai
    Chen, Bingrui
    Zhang, Chuanqing
    Zhou, Hui
    [J]. ENGINEERING GEOLOGY, 2012, 137 : 85 - 96
  • [17] Rock fragmentation indexes reflecting rock mass quality based on real-time data of TBM tunnelling
    Li, Xu
    Wu, Lei-jie
    Wang, Yu-jie
    Li, Jin-hui
    [J]. SCIENTIFIC REPORTS, 2023, 13 (01)
  • [18] Cut-slope versus shallow tunnel: Risk-based decision making framework for alternative selection
    Li, Zhihong
    Huang, Hongwei
    Xue, Yadong
    [J]. ENGINEERING GEOLOGY, 2014, 176 : 11 - 23
  • [19] A case study of TBM performance prediction using a Chinese rock mass classification system - Hydropower Classification (HC) method
    Liu, Quansheng
    Liu, Jianping
    Pan, Yucong
    Kong, Xiaoxuan
    Hong, Kairong
    [J]. TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2017, 65 : 140 - 154
  • [20] Application and development of hard rock TBM and its prospect in China
    Liu, Quansheng
    Huang, Xing
    Gong, Qiuming
    Du, Lijie
    Pan, Yucong
    Liu, Jianping
    [J]. TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2016, 57 : 33 - 46