Determining the best depth of subway tunnel excavation considering ground type, support system characteristics, and tunneling cost: case study of Tabriz subway, Line 2

被引:2
作者
Arpachaei, Mohammadreza Akbarzadeh [1 ]
Jalali, Seyed-Mohammad Esmaeil [1 ]
Khademian, Amir [2 ]
机构
[1] Shahrood Univ Technol, Dept Min Engn Petr & Geophys, Shahrood, Iran
[2] Sahand Univ Technol, Fac Min Engn, Tabriz 5168637166, Iran
关键词
Tunnel; Station; Optimum depth; Tabriz subway; Surface settlement; FLAC3D; SETTLEMENT; SIMULATION; MODEL;
D O I
10.1007/s10064-023-03448-1
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
The cost of subway construction is especially dependent on stations' construction cost. In order to minimize these costs, an optimum depth for subway tunnels should be adopted. This study intends to investigate the best depth of tunnel construction for Tabriz subway, Line 2. The study is carried out in two categories of technical and financial studies. In technical studies, surface settlement is the ruling criteria, which its allowed limit is 25 mm. Results showed that depths less than 1.5 times the tunnel diameter bear settlement above the limit; therefore, tunneling in such depths is not recommended. Financial studies consist of a cost analysis of tunneling and subway station construction. To do so, the depth of station construction and their distance from each other have been analyzed. Results indicated that the construction costs are highly dependent on the stations' depth and their distances. To put it more clearly, the least subway costs are achieved when the overburden is at minimum and station distance is at maximum. To be more specific, along the 17 km of the route, when the station depth is greater than twice the tunnel diameter, and their distance is 750 m, the unit cost of construction reaches 29 M$, while it is at its minimum (7 M$) when the stations' depth is less than tunnel diameter, and their distances are 3000 m. Eventually, the optimum depth for Line 2 of the Tabriz subway is 1.5 to 2 times the tunnel diameter, while obviously, more distanced stations cost less.
引用
收藏
页数:13
相关论文
共 23 条
  • [1] Early cost estimation models based on multiple regression analysis for road and railway tunnel projects
    Ahmed C.
    [J]. Arabian Journal of Geosciences, 2021, 14 (11)
  • [2] Developing the Rule of Thumb for Evaluating Penetration Rate of TBM, Using Binary Classification
    Akbarzadeh, Mohammadreza
    Haghshenas, Sina Shaffiee
    Jalali, Seyed Mohammad Esmaeil
    Zare, Shokrollah
    Mikaeil, Reza
    [J]. GEOTECHNICAL AND GEOLOGICAL ENGINEERING, 2022, 40 (09) : 4685 - 4703
  • [3] Measuring and benchmarking the benefits of Athens metro extension using an ex-post cost benefit analysis
    Benardos, Andreas
    Sourouvali, Natalia
    Mavrikos, Athanassios
    [J]. TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2021, 111
  • [4] Determination of earth pressure balance tunnel-related maximum surface settlement: a multivariate adaptive regression splines approach
    Goh, A. T. C.
    Zhang, Wengang
    Zhang, Yanmei
    Xiao, Yang
    Xiang, Yuzhou
    [J]. BULLETIN OF ENGINEERING GEOLOGY AND THE ENVIRONMENT, 2018, 77 (02) : 489 - 500
  • [5] Specifying the real value of volume loss (VL) and its effect on ground settlement due to excavation of Abuzar tunnel, Tehran
    Golpasand, Mohammad Reza Baghban
    Nikudel, Mohammad Reza
    Uromeihy, Ali
    [J]. BULLETIN OF ENGINEERING GEOLOGY AND THE ENVIRONMENT, 2016, 75 (02) : 485 - 501
  • [6] Guglielmetti V., 2008, Mechanized Tunnelling in Urban Areas: Design methodology and construction control, V1st, DOI DOI 10.1201/9780203938515
  • [7] Longitudinal Settlement Profile in Shallow Tunnels in Drained Conditions
    Hajjar, Mahdi
    Hayati, Ali Nemati
    Ahmadi, Mohammad Mehdi
    Sadrnejad, Seyyed Amirodin
    [J]. INTERNATIONAL JOURNAL OF GEOMECHANICS, 2015, 15 (06)
  • [8] Imensazan C., 2015, unpublished report
  • [9] Model uncertainty of various settlement estimation methods in shallow tunnels excavation; case study: Qom subway tunnel
    Khademian, Amir
    Abdollahipour, Hamed
    Bagherpour, Raheb
    Faramarzi, Lohrasb
    [J]. JOURNAL OF AFRICAN EARTH SCIENCES, 2017, 134 : 658 - 664
  • [10] Present status and technology of shield tunneling method in Japan
    Koyama, Y
    [J]. TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2003, 18 (2-3) : 145 - 159