A Three-Layer Imperfect Production Supply Chain Model with Green Investment Under Trade Credit and Cap-Trade Policy

被引:4
|
作者
Narang, Pankaj [1 ]
Kumari, Mamta [1 ]
De, Pijus Kanti [1 ]
机构
[1] Natl Inst Technol Silchar, Dept Math, Silchar 788010, Assam, India
关键词
Supply chain; EPQ model; carbon emissions; green technology; rework; trade credit; genetic algorithm; PRODUCTION-INVENTORY MODEL; CARBON EMISSION REDUCTION; PRODUCTION SYSTEM; STRATEGY; DELAY;
D O I
10.1142/S2424862223500057
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
A three-layer supply chain model with a single supplier, manufacturer, and retailer is presented in this paper. This proposed model is analyzed under green investment along with trade credit and cap-trade policy. It is considered that the manufacturer's production process is imperfect. Few inferior quality products are reworked, and the remaining defective items are discarded. The manufacturer makes investments in green technology to reduce carbon emissions. The product's demand is influenced by selling price, advertisement, and green-technology level. The total average profit of the supply chain is constructed under three different scenarios of trade credit provided by the manufacturer to the retailer. The primary goal of this research is to obtain the optimal selling price, production rate, and green-technology level to maximize the system's total average profit by using genetic algorithm. A numerical example is shown to demonstrate the model, and sensitivity analysis is carried out to analyze the impact of numerous input parameters. Managerial insights and conclusions are provided to make this model helpful for manufacturers.
引用
收藏
页数:37
相关论文
共 50 条
  • [1] Three stage trade credit policy in a three-layer supply chain-a production-inventory model
    Pal, Brojeswar
    Sana, Shib Sankar
    Chaudhuri, Kripasindhu
    INTERNATIONAL JOURNAL OF SYSTEMS SCIENCE, 2014, 45 (09) : 1844 - 1868
  • [2] Effects of maintenance policy on an imperfect production system under trade credit
    Tsao, Yu-Chung
    Chen, Tsung-Hui
    Zhang, Qin-Hong
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2013, 51 (05) : 1549 - 1562
  • [3] Imperfect Production–Inventory Models for Deteriorating Items With Carbon Cap-and-Trade Policy and Advance-Cash- Credit Payment
    Lu, Chi-Jie
    Gu, Ming
    Yang, Chih-Te
    Wang, Yen-Wen
    Chen, De Rui
    IEEE ACCESS, 2024, 12 : 66259 - 66280
  • [4] A production-inventory model of imperfect quality products in a three-layer supply chain
    Sana, Shib Sankar
    DECISION SUPPORT SYSTEMS, 2011, 50 (02) : 539 - 547
  • [5] AN EOQ MODEL FOR DETERIORATION ITEMS UNDER TRADE CREDIT POLICY IN A SUPPLY CHAIN SYSTEM
    Liao, Jui-Jung
    Chung, Kun-Jen
    JOURNAL OF THE OPERATIONS RESEARCH SOCIETY OF JAPAN, 2009, 52 (01) : 46 - 57
  • [6] Energy conservation investment and supply chain structure under cap-and-trade regulation for a green product 
    Bai, Qingguo
    Chen, Jiguang
    Xu, Jianteng
    OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2023, 119
  • [7] An imperfect production model under Radio Frequency Identification adoption and trade credit
    Tsao, Yu -Chung
    Zhang, Qinhong
    Chang, Fu-Chi
    Linh Vu-Thuy
    APPLIED MATHEMATICAL MODELLING, 2017, 42 : 493 - 508
  • [8] An EOQ model under retailer partial trade credit policy in supply chain
    Huang, Yung-Fu
    Hsu, Kuang-Hua
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2008, 112 (02) : 655 - 664
  • [9] An imperfect production system with predictive maintenance policy under trade credit
    Tsao Y.-C.
    Lee P.-L.
    Zhang Q.
    Vu T.-L.
    Fang K.C.
    International Journal of Information and Management Sciences, 2020, 31 (01): : 15 - 34
  • [10] A production policy considering reworking of imperfect items and trade credit
    Tsao, Yu-Chung
    Chen, Tsung-Hui
    Huang, Sheng-Min
    FLEXIBLE SERVICES AND MANUFACTURING JOURNAL, 2011, 23 (01) : 48 - 63