Structuring risks for a comprehensive understanding of cost overruns in power plant projects

被引:3
作者
Islam, Muhammad Saiful [1 ]
Nepal, Madhav [2 ]
Skitmore, Martin [3 ]
机构
[1] Cent Queensland Univ, Sch Engn & Technol, Melbourne Campus, Melbourne, Australia
[2] Queensland Univ Technol, Sch Architecture & Built Environm, Brisbane, Australia
[3] Bond Univ, Fac Soc & Design, Gold Coast, Australia
来源
CONSTRUCTION INNOVATION-ENGLAND | 2025年 / 25卷 / 03期
关键词
Cost overruns; Decision-making; Power plant projects; Project phases; Risk networks; Risk management; BAYESIAN-BELIEF-NETWORK; ORGANIZATIONAL-FACTORS; LABOR PRODUCTIVITY; MODEL; COMPLEXITY; KNOWLEDGE;
D O I
10.1108/CI-05-2022-0120
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Purpose Power plant projects are very complex and encounter serious cost overruns worldwide. Their cost overrun risks are not independent but interrelated in many cases, having structural relationships among each other. The purpose of this study is, therefore, to establish the complex structural relationships of risks involved.Design/methodology/approach In total, 76 published articles from the previous literature are reviewed using the content analysis method. Three risk networks in different phases of power plant projects are depicted based on literature review and case studies. The possible methods of solving these risk networks are also discussed.Findings The study finds critical cost overrun risks and develops risk networks for the procurement, civil and mechanical works of power plant projects. It identifies potential models to assess cost overrun risks based on the developed risk networks. The literature review also revealed some research gaps in the cost overrun risk management of power plants and similar infrastructure projects.Practical implications This study will assist project risk managers to understand the potential risks and their relationships to prevent and mitigate cost overruns for future power plant projects. It will also facilitate decision-makers developing a risk management framework and controlling projects' cost overruns.Originality/value The study presents conceptual risk networks in different phases of power plant projects for comprehending the root causes of cost overruns. A comparative discussion of the relevant models available in the literature is presented, where their potential applications, limitations and further improvement areas are discussed to solve the developed risk networks for modeling cost overrun risks.
引用
收藏
页码:1014 / 1032
页数:19
相关论文
共 76 条
[1]  
Abdul Kadir M.R., 2005, Structural Survey, V23, P42, DOI [10.1108/02630800510586907, DOI 10.1108/02630800510586907]
[2]  
Abdullah M.R, 2010, Journal of Surveying, Construction & Property, V1, P123
[3]   A review of artificial intelligence based risk assessment methods for capturing complexity-risk interdependencies Cost overrun in construction projects [J].
Afzal, Farman ;
Shao Yunfei ;
Nazir, Mubasher ;
Bhatti, Saad Mahmood .
INTERNATIONAL JOURNAL OF MANAGING PROJECTS IN BUSINESS, 2021, 14 (02) :300-328
[4]  
Ahsan K., 2012, International Journal of Management, V29, P77
[5]  
Alnuaimi A.S., 2014, J CONSTR ENG M, V4, P1
[6]   A fuzzy model for evaluating risk impacts on variability between contract sum and final account in government-funded construction projects [J].
Ameyaw, Ernest ;
Chan, Albert ;
Owusu-Manu, De-Graft ;
Coleman, Ekow .
JOURNAL OF FACILITIES MANAGEMENT, 2015, 13 (01) :45-+
[7]   Factors influencing accuracy of construction project cost estimates in Pakistan: Perception and reality [J].
Arif, Farrukh ;
Lodi, Sarosh H. ;
Azhar, Nida .
INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2015, 15 (01) :59-70
[8]  
Baccarini D., 2004, COBRA 2004 RICS INT, P7
[9]   Specification, evaluation, and interpretation of structural equation models [J].
Bagozzi, Richard P. ;
Yi, Youjae .
JOURNAL OF THE ACADEMY OF MARKETING SCIENCE, 2012, 40 (01) :8-34
[10]  
Baily P., 1990, PURCHASING PRINCIPLE, V6th