Study on VIV performance of streamlined steel box girder of a sea-crossing cable-stayed bridge

被引:7
|
作者
Lei, Wei [2 ]
Wang, Qi [1 ,2 ]
Zhang, Yan [2 ]
Li, Zhiguo [1 ,2 ]
机构
[1] Southwest Jiaotong Univ, Wind Engn Key Lab Sichuan Prov, Chengdu 610031, Peoples R China
[2] Southwest Jiaotong Univ, Sch Civil Engn, Chengdu 610031, Peoples R China
关键词
VIV; Streamlined steel box girder; Sea -crossing cable -stayed bridge; VORTEX-INDUCED VIBRATION; SUPPRESSION; MITIGATION; MECHANISM;
D O I
10.1016/j.oceaneng.2024.116897
中图分类号
U6 [水路运输]; P75 [海洋工程];
学科分类号
0814 ; 081505 ; 0824 ; 082401 ;
摘要
The frequent occurrence of vortex -induced vibrations (VIVs) poses significant challenges for the operations of large -span sea -crossing bridges subjected to wind loads. A wind tunnel test device for large-scale section models is developed for a sea -crossing bridge to investigate the VIV performance of a streamlined box girder. A new type of aerodynamic countermeasure combining horizontal stabilizers and deflectors is proposed to address vertical and torsional VIV mitigation. To achieve optimal control effects, adjustments are made to the layout of deflectors and the width of horizontal stabilizers. The effects of varying structural damping ratios and low turbulence on vertical VIVs are also thoroughly examined. The VIV triggering mechanism of the girder by maintenance rails is revealed through numerical simulations using the Shear Stress Transport (SST) k - omega model. Finally, the suppression mechanism of the countermeasures is elucidated. The instantaneous vorticity distribution indicates that implementing the countermeasures effectively reduces the size of alternating shedding vortices on the trailing edge of the main girder. This research provides valuable insights into the VIV mitigation of streamlined box girders.
引用
收藏
页数:12
相关论文
共 50 条
  • [41] Experimental Study on Mechanical and Deformation Performance of Steel-concrete Composite Box Girder of High-speed Railway Cable-stayed Bridge
    School of Civil Engineering, Southwest Jiaotong University, Chengdu
    610031, China
    不详
    430063, China
    Tiedao Xuebao, 1 (111-118): : 111 - 118
  • [42] Theoretical and Experimental Study on Cable-to-girder Anchorages in Long-span Cable-stayed Bridges with Steel Box Girder
    Wei, Xing
    Li, Jun
    ADVANCES IN CIVIL ENGINEERING, PTS 1-6, 2011, 255-260 : 1315 - 1318
  • [43] Lifetime seismic resilience assessment of a sea-crossing cable-stayed bridge exposed to long-term scour and corrosion
    Lu, Xiaoluo
    Wei, Kai
    Deng, Kailai
    Xu, Lueqin
    OCEAN ENGINEERING, 2024, 295
  • [44] Multi-scale damage analysis for a steel box girder of a long-span cable-stayed bridge
    Ding, YouLiang
    Li, AiQun
    Du, DongSheng
    Liu, Tao
    STRUCTURE AND INFRASTRUCTURE ENGINEERING, 2010, 6 (06) : 725 - 739
  • [45] Analysis of Temperature Effect on an S Cable-Stayed Bridge with Steel Box Girder During Asphalt Concrete Placement
    S形曲线钢箱梁斜拉桥沥青混凝土摊铺温度效应分析
    1600, Wuhan Bridge Research Institute (50): : 37 - 42
  • [46] Experimental study on anchor-plate anchorage for cable-stayed bridges with steel box girder
    Wei, Xing
    Li, Xiao-Zhen
    Li, Jun
    Qiang, Shi-Zhong
    Wang, Zi-Jian
    Gongcheng Lixue/Engineering Mechanics, 2007, 24 (04): : 135 - 141
  • [47] Temperature mode of steel box girder of long span cable-stayed bridge of high-speed railway
    Liu W.
    Lü F.
    Dai G.
    Chang X.
    Xia D.
    Journal of Railway Science and Engineering, 2023, 20 (11) : 4031 - 4040
  • [48] Stress analysis on steel-box girder of long span cable-stayed bridge based on submodel method
    Zhao, Da-Liang
    Li, Ai-Qun
    Ding, You-Liang
    Mao, Chang-Qing
    Jisuan Lixue Xuebao/Chinese Journal of Computational Mechanics, 2008, 25 (03): : 326 - 332
  • [49] Corrosion Fatigue Reliability of Steel Box Girder Connection Details of a Cable-stayed Bridge Based on a Neural Network
    Zhang Z.-H.
    Chen J.-G.
    Zhu X.
    Zhongguo Gonglu Xuebao/China Journal of Highway and Transport, 2019, 32 (12): : 186 - 196
  • [50] Design of a railway steel and concrete hybrid box girder cable-stayed bridge with main span of 468 m
    Liu, Zhen-Biao
    Luo, Shi-Dong
    Pan, Mao-Sheng
    Zeng, Jia-Hua
    Bridge Construction, 2014, 44 (01) : 81 - 88