Disaster mechanism analysis for segments floating of large-diameter shield tunnel construction in the water-rich strata: A case study

被引:10
|
作者
Shi, Zhou [1 ,2 ,3 ]
Xu, Jinfeng [1 ,2 ,3 ]
Xie, Xiongyao [1 ,2 ,3 ]
Zeng, Hongbo [4 ]
Xu, Weijiang [5 ]
Niu, Gang [6 ]
Xiao, Zhonglin [6 ]
机构
[1] Tongji Univ, Key Lab Geotech & Underground Engn, Minist Educ, Shanghai 200092, Peoples R China
[2] Tongji Univ, Coll Civil Engn, Dept Geotech Engn, Shanghai 200092, Peoples R China
[3] Tongji Univ, State Key Lab Disaster Reduct Civil Engn, Shanghai 200092, Peoples R China
[4] CCCC SHEC First Highway Engn Co Ltd, Wuhan 430000, Hubei, Peoples R China
[5] China Railway Guangzhou Bur Grp Co Ltd, Engn Management Off, Guangzhou 510088, Guangdong, Peoples R China
[6] China Commun Strait Construct Investment Dev Co Lt, Fuzhou 350000, Fujian, Peoples R China
基金
中国国家自然科学基金;
关键词
Shield tunnel; Segment floating; Structural cracking; Failure mechanism; Treatment measures;
D O I
10.1016/j.engfailanal.2023.107953
中图分类号
TH [机械、仪表工业];
学科分类号
0802 ;
摘要
During the construction of large -diameter shield tunnels crossing water -rich strata near the sea, serious disasters such as segment floating, cracking, and water leakage often occur. This study, based on field tests, identified the engineering disaster factors of segment floating and adjacent misalignment, established a numerical calculation model for shield tunnel construction considering the interaction between segments, revealed the engineering disaster derivation mechanism in the water -rich environment, proposed treatment measures for engineering disaster, and the effectiveness of the treatment measures were verified in field engineering. The research results indicate that the larger grouting pressure in the lower part of the segment will cause greater compression deformation along the radial direction, leading to greater adjacent misalignment and more obvious circumferential rotation of the segment, significantly increasing the risk of local yielding of bolts and reinforcement mesh. At the beginning of grouting, the flow velocity of pore water in the strata is the highest, and as the grout around the segment gradually solidifies, the flow velocity and accumulation range of pore water around the segment gradually decrease. The optimal grout material ratio including 200 kg of cement, 380 kg of water, 680 kg of sand, 380 kg of fly ash, and 90 kg of bentonite can effectively limit the floating displacement of the segment, and improve the assembly flatness of segment along the longitudinal direction.
引用
收藏
页数:24
相关论文
共 50 条
  • [21] Study on Mechanical Characteristics of Segmental Joints of a Large-Diameter Shield Tunnel under Ultrahigh Water Pressure
    Kou, Lei
    Xiong, Zhihui
    Cui, Hao
    Zhao, Jinjie
    SENSORS, 2021, 21 (24)
  • [22] Numerical Analysis on Deformation of Adjacent Structures due to Metro Station Construction by Enlarging Large-diameter Shield Tunnel
    Ding, Deyun
    Yang, Xiuren
    Lu, Weidong
    Liu, Weining
    Yan, Mei
    ADVANCES IN BUILDING MATERIALS, PTS 1-3, 2011, 261-263 : 1196 - +
  • [23] Analysis of ground surface settlement induced by the construction of a large-diameter shield-driven tunnel in Shanghai, China
    Xie, Xiongyao
    Yang, Yubing
    Ji, Mei
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2016, 51 : 120 - 132
  • [24] Large-diameter shield tunnel crossing closely to existing metro tunnels and a residential building: A case study
    Su, Z.
    Zhou, C.
    Xie, J.
    Huang, X.
    GEOSHANGHAI INTERNATIONAL CONFERENCE 2024, VOL 8, 2024, 1337
  • [25] Mechanical Behavior of Large-Diameter Adjacent Shield Tunnelling Bridge Piles: A Case Study of Chunfeng Tunnel
    Wu, Jingang
    Zhao, Jinpeng
    Tan, Zhongsheng
    Liu, Xiangyu
    Wang, Xia
    Liu, Minggao
    APPLIED SCIENCES-BASEL, 2022, 12 (11):
  • [26] Ground settlement caused by large-diameter slurry shield during tunnel construction in soft soils
    Wu C.-S.
    Zhu Z.-D.
    Song S.-G.
    Zhang J.
    Peng Y.-Y.
    Yantu Gongcheng Xuebao/Chinese Journal of Geotechnical Engineering, 2019, 41 : 169 - 172
  • [27] Analysis of the impact of large-diameter shield construction adjacent to the side of the pile foundation
    Ma, Wenbin
    Liu, Junyan
    Zhang, Liangliang
    2020 2ND INTERNATIONAL CONFERENCE ON CIVIL ENGINEERING, ENVIRONMENT RESOURCES AND ENERGY MATERIALS, 2021, 634
  • [28] Discussion of key construction techniques for a shield-driven tunnel in a water-rich mixed ground
    Feng, H. (18638854067@163.com), 1600, China Railway Southwest Research Institute Co. Ltd., No.97 Gunan Street, West Hi-Tech Zone, Chengdu, 611731, China (51):
  • [29] Study on the Floating of Large Diameter Underwater Shield Tunnel Caused by Synchronous Grouting
    Liang, Yu
    Huang, Xumin
    Gao, Shijun
    Yin, Yihao
    GEOFLUIDS, 2022, 2022
  • [30] Study on the Floating of Large Diameter Underwater Shield Tunnel Caused by Synchronous Grouting
    Liang, Yu
    Huang, Xumin
    Gao, Shijun
    Yin, Yihao
    GEOFLUIDS, 2022, 2022