Investigation Study of the Challenges in Green Procurement Implementation in Construction Projects in UAE

被引:6
作者
Hazza, Muataz Hazza Al [1 ]
Muqtadar, Maktoom [1 ]
El Salamony, Khaled [1 ]
Bourini, Islam F. [2 ]
Sakhrieh, Ahmad [1 ]
Alnahhal, Mohammed [1 ]
机构
[1] Amer Univ Ras Al Khaimah, Dept Mech & Ind Engn, Ras Al Khaymah, U Arab Emirates
[2] Univ Dubai, Dubai Business Sch, Dubai, U Arab Emirates
来源
CIVIL ENGINEERING JOURNAL-TEHRAN | 2023年 / 9卷 / 04期
关键词
Green Procurement; Construction Project; Challenges; AHP; SUPPLY CHAIN MANAGEMENT; PUBLIC PROCUREMENT; SUSTAINABLE PROCUREMENT; HIERARCHY PROCESS; BARRIERS; SECTOR; AHP;
D O I
10.28991/CEJ-2023-09-04-06
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The global construction industry is responsible for significant environmental , societal effects. Some researchers claim that it accounts for 35% of global gas emissions. One of the solutions is to practice green supply chain management. Part of this is Green Procurement (GP) to conserve energy and money. However, challenges in implementing green procurement in the construction industry are rising. This research aims to identify the most significant challenges when implementing green procurement (GP) in construction projects in the UAE. A comprehensive article review was conducted to determine the critical obstacles highlighted by different researchers. These challenges were prioritized using the analytical hierarchy process (AHP) method , then recommendations on best practices to overcome these challenges were proposed. The results show that the lack of top management commitment is the biggest challenge when implementing green procurement in the construction industry in the UAE, with a priority value of 0.331, followed by a lack of knowledge, with a value of 0.2748. In contrast, lack of awareness is the lowest-ranked factor, with a value of 0.103.
引用
收藏
页码:849 / 859
页数:11
相关论文
共 48 条
  • [1] Adham K.N. Siwar., 2012, OIDA International Journal of Sustainable Development, V4, P77
  • [2] Barriers and opportunities to greening the construction supply chain management Cause-driven implementation strategies for developing countries
    Ahmed, Maria
    Thaheem, Muhammad Jamaluddin
    Maqsoom, Ahsen
    [J]. BENCHMARKING-AN INTERNATIONAL JOURNAL, 2019, 27 (03) : 1211 - 1237
  • [3] Green public procurement implementation challenges in Australian public healthcare sector
    Ahsan, Kamrul
    Rahman, Shams
    [J]. JOURNAL OF CLEANER PRODUCTION, 2017, 152 : 181 - 197
  • [4] An Integrated Approach for Supplier Evaluation and Selection using the Delphi Method and Analytic Hierarchy Process (AHP): A New Framework
    Al Hazza, Muataz Hazza
    Abdelwahed, Alaa
    Ali, Mohammad Yeakub
    Sidek, Atiah Bt. Abdullah
    [J]. INTERNATIONAL JOURNAL OF TECHNOLOGY, 2022, 13 (01) : 16 - 25
  • [5] Al Hazza MHF, 2021, J ENG SCI TECHNOL, V16, P2227
  • [6] Al Kukhun A. O., 2012, THESIS BUID DUBAI
  • [7] Implementing sustainable procurement in the United Arab Emirates public sector
    Al Nuaimi, Bader Khamis
    Khan, Mehmood
    Ajmal, Mian
    [J]. JOURNAL OF PUBLIC PROCUREMENT, 2020, 20 (02) : 97 - 117
  • [8] Strategic use of green public procurement in the bus sector: Challenges and opportunities
    Aldenius, Malin
    Khan, Jamil
    [J]. JOURNAL OF CLEANER PRODUCTION, 2017, 164 : 250 - 257
  • [9] Public-sector green procurement in the United Arab Emirates: Innovation capability and commitment to change
    AlNuaimi, Bader K.
    Khan, Mehmood
    [J]. JOURNAL OF CLEANER PRODUCTION, 2019, 233 : 482 - 489
  • [10] Green Procurement in the private sector: a state of the art review between 1996 and 2013
    Appolloni, Andrea
    Sun, Hui
    Jia, Fu
    Li, Xiaomei
    [J]. JOURNAL OF CLEANER PRODUCTION, 2014, 85 : 122 - 133