Developing a model of work duration under the influence of risk events in the implementation of life cycle contracts for large energy construction projects

被引:5
作者
Bezpalov, Valery [1 ]
Goncharenko, Liudmila [2 ]
Fedyunin, Dmitry [3 ]
Lochan, Sergey [4 ]
Avtonomova, Svetlana [3 ]
机构
[1] Plekhanov Russian Univ Econ, Dept Natl & Reg Econ, Moscow 117997, Russia
[2] Plekhanov Russian Univ Econ, Sci & Res Ctr Innovat Econ, Moscow 117997, Russia
[3] Plekhanov Russian Univ Econ, Dept Advertising Publ Relat & Design, Moscow 117997, Russia
[4] Financial Univ Govt Russian Federat, Dept Tourism & Hotel Business, Moscow 125167, Russia
关键词
life cycle contract; risk; design phase; construction; duration of work; breach of schedule; strength of risk impact; PUBLIC-PRIVATE PARTNERSHIPS;
D O I
10.24294/jipd.v7i3.1946
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Projects implemented under life cycle contracts have become increasingly common in recent years to ensure the quality of construction and maintenance of energy infrastructure facilities. A key parameter for energy facility construction projects implemented under life cycle contracts is their duration and deadlines. Therefore, the systematic identification, monitoring, and comprehensive assessment of risks affecting the timing of work on the design and construction is an urgent practical task. The purpose of this work is to study the strength of the influence of various risks on the duration of a project implemented on the terms of a life cycle contract. The use of the expert assessment method allows for identifying the most likely risks for the design and construction phases, as well as determining the ranges of deviations from the baseline indicator. Using the obtained expert evaluations, a model reflecting the range and the most probable duration of the design and construction works under the influence of risk events was built by the Monte Carlo statistical method. The results obtained allow monitoring and promptly detecting deviations in the actual duration of work from the basic deadlines set in the life cycle contract. This will give an opportunity to accurately respond to emerging risks and build a mutually beneficial relationship between the parties to life cycle contracts.
引用
收藏
页数:20
相关论文
共 60 条
[1]   Risk and its impacts on time and cost in construction projects [J].
Aarthipriya, V. ;
Chitra, G. ;
Poomozhi, J. Sevvel .
JOURNAL OF PROJECT MANAGEMENT, 2020, 5 (04) :245-254
[2]  
Abdildin S, 2021, Journal of Environmental Management and Tourism, V12, P1617, DOI [10.14505//jemt.12.6(54).17, DOI 10.14505//JEMT.12.6(54).17]
[3]  
Ahmad MA, 2019, EURAM 2019 EXPLORING
[4]  
Alagboso OJ, 2019, IRE Journals, V3, P69
[5]  
Ameyaw C, 2017, J FACIL MANAG, V15, P153, DOI 10.1108/JFM-07-2016-0030
[6]   Time connectedness of fear [J].
Andrada-Felix, Julian ;
Fernandez-Perez, Adrian ;
Fernandez-Rodriguez, Fernando ;
Sosvilla-Rivero, Simon .
EMPIRICAL ECONOMICS, 2022, 62 (03) :905-931
[7]  
[Anonymous], 2012, A new approach to public private partnerships
[8]  
Anurov VN, 2021, Managing changes in design contracts
[9]   Optimal contracts with random monitoring [J].
Barbos, Andrei .
INTERNATIONAL JOURNAL OF GAME THEORY, 2022, 51 (01) :119-154
[10]   An Inspection of the Life Cycle of Sustainable Construction Projects: Towards a Biomimicry-Based Road Map Integrating Circular Economy [J].
Beermann, Kimberly ;
Chen Austin, Miguel .
BIOMIMETICS, 2021, 6 (04)