An Energy Storage Capacity Configuration Method for a Provincial Power System Considering Flexible Adjustment of the Tie-Line

被引:3
作者
Sun, Bing [1 ]
Zhang, Zheng [1 ]
Hu, Jing [2 ]
Meng, Zihan [2 ]
Huang, Bibin [2 ]
Li, Nana [2 ]
机构
[1] Tianjin Univ, Sch Elect & Informat Engn, Tianjin 300072, Peoples R China
[2] State Grid Energy Res Inst Co Ltd, Beijing 102209, Peoples R China
关键词
energy storage; new type of power system; power and energy balance; provincial power system; power supply cost; LARGE-SCALE INTEGRATION; WIND-POWER; OPTIMIZATION; PENETRATION; GENERATION;
D O I
10.3390/en17010270
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
A high proportion of renewable generators are widely integrated into the power system. Due to the output uncertainty of renewable energy, the demand for flexible resources is greatly increased in order to meet the real-time balance of the system. But the investment cost of flexible resources, such as energy storage equipment, is still high. It is necessary to propose a method for determining the capacity of energy storage scientifically. An optimization and planning method of energy storage capacity is proposed. It is characterized by determining the optimal capacity of energy storage by carrying out 8760 hours of time series simulation for a provincial power grid with energy storage. Firstly, the current situation of power supply and demand for provincial power grids is analyzed. The difficulty of realizing a power balance at different time scales is analyzed. Then, the source load balancing solutions at different time scales are proposed. The difficulty of a long-term power balance can be alleviated by flexibly adjusting the power on the tie-line of the provincial power grid. And the difficulty of a short-term power balance can be met through energy storage. In addition, an optimal planning model of an energy storage system is established with the power supply cost as the objective function. The optimal capacity of the energy storage is determined by comparing the objective function of different planning schemes. Finally, a case study is carried out. It is found that flexible adjustment of interprovincial interconnection lines can reduce the maximum demand for electricity from 8.439 billion kWh to 2.299 billion kWh. At the same time, the curtailment ratio of renewable electricity can be decreased from 12.6% to 5.0% by using energy storage. However, the average power supply cost of the system gradually increases from 0.307 CNY/kWh to 0.485 CNY/kWh. It is necessary to fully tap into the various values of energy storage equipment.
引用
收藏
页数:26
相关论文
共 26 条
  • [1] Method for size optimisation of large wind-hydrogen systems with high penetration on power grids
    Beccali, M.
    Brunone, S.
    Finocchiaro, P.
    Galletto, J. M.
    [J]. APPLIED ENERGY, 2013, 102 : 534 - 544
  • [2] Augmenting Wind Power Penetration and Grid Voltage Stability Limits Using ESS: Application Design, Sizing, and a Case Study
    Ha Thu Le
    Santoso, Surya
    Thang Quang Nguyen
    [J]. IEEE TRANSACTIONS ON POWER SYSTEMS, 2012, 27 (01) : 161 - 171
  • [3] Multi-objective planning-operation co-optimization of renewable energy system with hybrid energy storages
    He, Yi
    Guo, Su
    Zhou, Jianxu
    Ye, Jilei
    Huang, Jing
    Zheng, Kun
    Du, Xinru
    [J]. RENEWABLE ENERGY, 2022, 184 : 776 - 790
  • [4] Henan Energy Regulatory Office of National Energy Administration of China, Information Disclosure Annual Report of Henan Power Supply Enterprises in 2019 [OE/BL]
  • [5] Analyzing the penetration barriers of clean generation technologies in China's power sector using a multi-region optimization model
    Hui, Jingxuan
    Cai, Wenjia
    Wang, Can
    Ye, Minhua
    [J]. APPLIED ENERGY, 2017, 185 : 1809 - 1820
  • [6] Supply Restoration of Data Centers in Flexible Distribution Networks With Spatial-Temporal Regulation
    Jian, Jie
    Zhao, Jinli
    Ji, Haoran
    Bai, Linquan
    Xu, Jing
    Li, Peng
    Wu, Jianzhong
    Wang, Chengshan
    [J]. IEEE TRANSACTIONS ON SMART GRID, 2024, 15 (01) : 340 - 354
  • [7] Application of interruptible contracts to increase wind-power penetration in congested areas
    Kabouris, J
    Vournas, CD
    [J]. IEEE TRANSACTIONS ON POWER SYSTEMS, 2004, 19 (03) : 1642 - 1649
  • [8] Distributionally robust chance constrained planning model for energy storage plants based on Kullback-Leibler divergence
    Le, Jian
    Liao, Xiaobing
    Zhang, Lina
    Mao, Tao
    [J]. ENERGY REPORTS, 2021, 7 : 5203 - 5213
  • [9] Joint planning of distributed generations and energy storage in active distribution networks: A Bi-Level programming approach
    Li, Yang
    Feng, Bo
    Wang, Bin
    Sun, Shuchao
    [J]. ENERGY, 2022, 245
  • [10] Large-scale integration of wind power into different energy systems
    Lund, H
    [J]. ENERGY, 2005, 30 (13) : 2402 - 2412