An Energy Storage Capacity Configuration Method for a Provincial Power System Considering Flexible Adjustment of the Tie-Line

被引:3
|
作者
Sun, Bing [1 ]
Zhang, Zheng [1 ]
Hu, Jing [2 ]
Meng, Zihan [2 ]
Huang, Bibin [2 ]
Li, Nana [2 ]
机构
[1] Tianjin Univ, Sch Elect & Informat Engn, Tianjin 300072, Peoples R China
[2] State Grid Energy Res Inst Co Ltd, Beijing 102209, Peoples R China
关键词
energy storage; new type of power system; power and energy balance; provincial power system; power supply cost; LARGE-SCALE INTEGRATION; WIND-POWER; OPTIMIZATION; PENETRATION; GENERATION;
D O I
10.3390/en17010270
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
A high proportion of renewable generators are widely integrated into the power system. Due to the output uncertainty of renewable energy, the demand for flexible resources is greatly increased in order to meet the real-time balance of the system. But the investment cost of flexible resources, such as energy storage equipment, is still high. It is necessary to propose a method for determining the capacity of energy storage scientifically. An optimization and planning method of energy storage capacity is proposed. It is characterized by determining the optimal capacity of energy storage by carrying out 8760 hours of time series simulation for a provincial power grid with energy storage. Firstly, the current situation of power supply and demand for provincial power grids is analyzed. The difficulty of realizing a power balance at different time scales is analyzed. Then, the source load balancing solutions at different time scales are proposed. The difficulty of a long-term power balance can be alleviated by flexibly adjusting the power on the tie-line of the provincial power grid. And the difficulty of a short-term power balance can be met through energy storage. In addition, an optimal planning model of an energy storage system is established with the power supply cost as the objective function. The optimal capacity of the energy storage is determined by comparing the objective function of different planning schemes. Finally, a case study is carried out. It is found that flexible adjustment of interprovincial interconnection lines can reduce the maximum demand for electricity from 8.439 billion kWh to 2.299 billion kWh. At the same time, the curtailment ratio of renewable electricity can be decreased from 12.6% to 5.0% by using energy storage. However, the average power supply cost of the system gradually increases from 0.307 CNY/kWh to 0.485 CNY/kWh. It is necessary to fully tap into the various values of energy storage equipment.
引用
收藏
页数:26
相关论文
共 50 条
  • [1] A capacity optimization method of hybrid energy storage system for optimizing tie-line power in microgrids
    Xiao, Jun
    Zhang, Zequn
    Zhang, Pan
    Liang, Haishen
    Wang, Chengshan
    Dianli Xitong Zidonghua/Automation of Electric Power Systems, 2014, (12): : 19 - 26
  • [2] Model and application of renewable energy accommodation capacity calculation considering utilization level of inter-provincial tie-line
    Li, Guodong
    Li, Gengyin
    Zhou, Ming
    PROTECTION AND CONTROL OF MODERN POWER SYSTEMS, 2019, 4 (01)
  • [3] Model and application of renewable energy accommodation capacity calculation considering utilization level of inter-provincial tie-line
    Guodong Li
    Gengyin Li
    Ming Zhou
    Protection and Control of Modern Power Systems, 2019, 4
  • [4] Microgrid tie-line power fluctuation mitigation with virtual energy storage
    Sun, Yushu
    Tang, Xisheng
    Sun, Xiaozhe
    Jia, Dongqiang
    Zhang, Guowei
    JOURNAL OF ENGINEERING-JOE, 2019, (16): : 1001 - 1004
  • [5] An Effect Evaluation of Battery Storage System Introduction and Tie-line Capacity Enlargement with Supply and Demand Simulation Considering Secure Adjusting Power
    Yabe, Kuniaki
    Hayashi, Yasuhiro
    IEEJ Transactions on Power and Energy, 2024, 144 (01): : 5 - 16
  • [6] Power supply capability determination considering constraints of transformer overloading and tie-line capacity
    Ge, Shaoyun
    Han, Jun
    Liu, Hong
    Guo, Yinchang
    Wang, Chengshan
    Zhongguo Dianji Gongcheng Xuebao/Proceedings of the Chinese Society of Electrical Engineering, 2011, 31 (25): : 97 - 103
  • [7] Evaluation method of allowable capacity of intermittent renewable energy sources in a microgrid with tie-line power control
    Sasaki, Yuta
    Bando, Shigeru
    Asano, Hiroshi
    Tagami, Seiji
    IEEJ Transactions on Power and Energy, 2009, 129 (01) : 102 - 109
  • [8] Deep Reinforcement Learning-Based Tie-Line Power Adjustment Method for Power System Operation State Calculation
    Xu, Huating
    Yu, Zhihong
    Zheng, Qingping
    Hou, Jinxiu
    Wei, Yawei
    Zhang, Zhijian
    IEEE ACCESS, 2019, 7 : 156160 - 156174
  • [9] Analysis of Tie-line Power Optimization in Integrated Energy Distribution System
    Liu, Liu
    Wang, Dan
    Jia, Hongjie
    Wang, Weiliang
    Meng, Zhengji
    Zhi, Yunqiang
    Zhang, Shenxi
    Du, Wei
    INNOVATIVE SOLUTIONS FOR ENERGY TRANSITIONS, 2019, 158 : 6484 - 6489
  • [10] A Novel Model of HVDC Tie-line Scheduling for Interconnected Grids Considering Reactive Power Adjustment Cost
    Ma, Shentong
    Zhang, Haibo
    2018 INTERNATIONAL CONFERENCE ON POWER SYSTEM TECHNOLOGY (POWERCON), 2018, : 2777 - 2783