Blast behaviour of precast segmental vs monolithic concrete beams prestressed with unbonded tendons: A numerical investigation

被引:17
|
作者
Tran, Duong T. [1 ]
Pham, Thong M. [1 ]
Hao, Hong [1 ]
Do, Tin V. [2 ,3 ]
Tran, Tung T. [4 ]
机构
[1] Curtin Univ, Ctr Infrastruct Monitoring & Protect, Sch Civil & Mech Engn, Bentley, WA 6102, Australia
[2] Karagozian & Case K&C Australia Pty Ltd, Bondi Jct, NSW 2022, Australia
[3] Ho Chi Minh City Open Univ, 97 Vo Van Tan,Dist 3, Ho Chi Minh City, Vietnam
[4] ARUP, 2 Esplanade, Perth, WA 6000, Australia
基金
澳大利亚研究理事会;
关键词
Precast; prefabricated segmental concrete; girders; beams (PSCBs); Unbonded tendons; Blast behaviour; response; Close-in; near-field explosions; LS-DYNA; Numerical simulation; GIRDER BRIDGE; CFRP; PREDICTIONS; SHEETS; JOINTS; MODEL;
D O I
10.1016/j.ijimpeng.2022.104434
中图分类号
TH [机械、仪表工业];
学科分类号
0802 ;
摘要
This study aims to numerically investigate the response of precast/prefabricated segmental concrete girders/ beams (PSCBs) under detonations of high explosives. A new and effective method of applying prestressing force in tendons in LS-DYNA is explored and used. The working mechanisms of PSCBs vs conventional monolithic beams in resisting blast loads are comprehensively examined and discussed. The numerical results show that blast-induced damage to the beams is primarily caused by three different mechanisms, namely the propagations of blast-induced stress waves and plastic hinges, and the beam free-vibration deflection (global response). There are similar stress wave propagation and the resultant damage in the monolithic and segmental beams at the early stage when the joints are closed. The different damage patterns in these two beams are mainly due to the propagation of plastic hinges and the beam's free-vibration deflection. Damage is more severe and well distributed in the monolithic beam whereas damage to PSCB mainly concentrates in the segment next to the explosive and around the joints. The energy absorption mechanism provided by the relative movement between the segments is the main reason for the reduced damage in the PSCB. Although having larger displacement, the PSCB shows better blast resistance compared to the monolithic beam. Either increasing the prestressing rein-forcement ratio or effective prestressing stress reduces the peak and residual displacement of the beam but in-creases concrete damage. Increasing the number of segments leads to a larger beam displacement response but reduces concrete damage. Energy dissipation (ED) bars are found to effectively unite the segments and hence result in the segmental beam having a similar blast behaviour as the monolithic counterpart.
引用
收藏
页数:24
相关论文
共 49 条
  • [41] Experimental and numerical investigation of a proposed monolithic-like precast concrete column-foundation connection
    Pul, Selim
    Senturk, Mehmet
    Ilki, Alper
    Hajirasouliha, Iman
    ENGINEERING STRUCTURES, 2021, 246
  • [42] Long-term behaviour of recycled aggregate concrete beams prestressed with carbon fibre-reinforced polymer (CFRP) tendons
    Liu, Xiaoyang
    Yu, Wen
    Huang, Yue
    Yang, Guotao
    You, Weijie
    Gao, Lei
    Song, Jun
    CASE STUDIES IN CONSTRUCTION MATERIALS, 2023, 18
  • [43] Experimental and numerical investigation of the seismic behaviour of corroded precast concrete piers with grouting sleeve connections
    Guo, Tong
    Yang, Jun
    Liu, Tao
    Liu, Zhongxiang
    STRUCTURE AND INFRASTRUCTURE ENGINEERING, 2025, 21 (03) : 357 - 374
  • [44] Flexural performance investigation of steel-concrete composite beams strengthened with prestressed CFRP tendons in the negative bending moment region
    Shen, Fangzheng
    Wang, Bing
    Zhuge, Ping
    Qi, Hetao
    STRUCTURES, 2024, 61
  • [45] Experimental and Numerical Study on the Flexural Behaviors of Unbonded Prestressed I-Shaped Steel Encased in Ultra-High-Performance Concrete Beams
    Deng, Nianchun
    Deng, Yanfeng
    Duan, Jiqiang
    Xue, Wenhao
    BUILDINGS, 2023, 13 (12)
  • [46] Experimental and Numerical Investigation on the Behaviour of Prestressed High Strength Concrete Pile-to-pile Cap Connections
    Yang, Zhijian
    Wang, Wenjin
    KSCE JOURNAL OF CIVIL ENGINEERING, 2016, 20 (05) : 1903 - 1912
  • [47] Experimental and numerical investigation on hysteretic behavior of posttensioned precast segmental Concrete-filled double skin steel tubular piers
    Li, Zhong-Xian
    Du, Chunyu
    Liang, Xiao
    Zhang, Huishen
    Zhao, Bo
    STRUCTURES, 2023, 54 : 1772 - 1787
  • [48] Experimental and numerical investigation on seismic behaviours of beam-column joints of precast prestressed concrete frame under given corrosion levels
    Yang, Jun
    Guo, Tong
    Chai, Shun
    STRUCTURES, 2020, 27 : 1209 - 1221
  • [49] Numerical investigation of bond-slip behaviour between CFRP strips and concrete in shear tests under static and blast loads
    Maazoun, Azer
    Ben Rhouma, Mohamed
    Matthys, Stijn
    Lecompte, David
    Siala, Ahmed
    COMPOSITE STRUCTURES, 2024, 339